General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-210456 Wooster - Lab Bldg USDA Rm 305 Build Out
This project will improve to shell space and create two offices with costs assumed by USDA and all finished and new spaces to be leased by USDA.
11/28/2022 07:00 PM UTC
OSU-200377 Waterman Dairy Improvements
Renovate existing tie stall barn to accommodate new college leased robotic milking, manure, and feeding equipment. Replace existing ventilation system with new system designed for milking operations
11/23/2022 07:00 PM UTC
OSU-200486 - Wooster Dairy Improvements
Improvements to multiple dairy facilities, this is Phase 1 of full implementation of the College's dairy consolidation & improvement plan for Wooster Project Webcam
11/23/2022 07:00 PM UTC
OSU-220002, MMP Pavilion - Sola MRI REBID
Removal of existing MRI Equipment and replacement within existing MRI suite. Associated work to include limited demolition and upgrades to associated structural and MEP systems within the suite and on the roof of the existing building. Work to be completed within an active patient environment.
11/18/2022 07:00 PM UTC
OSU-220480 Sullivant - AHU Duct Replacement
This project will replace the AHU ducts in Sullivant Hall, 1813 North High Street, Columbus, OH 43210
11/16/2022 05:00 PM UTC
OSU-220012 Wooster - National Greenhouse HVAC
This project will remove existing steam boiler, piping and heating equipment and provide new air distribution and heating equipment
11/11/2022 07:00 PM UTC
OSU-160980 Plumbing System Replacement BP3 REBID
This project will replace deteriorating plumbing systems.
11/04/2022 05:00 PM UTC
OSU-210236, Parks - 3rd Floor Lab Renovations
The project includes work on the third floor of Parks Hall. Work within Parks Hall is primarily located within the third floor in the South end of the building. Work includes the selective demolition of existing elements to fully renovate 4,600 sf of existing third floor laboratory (Suites 319, 323 and Rooms 316 and 320) into a new laboratory space. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
11/03/2022 06:00 PM UTC
OSU-190865, Polaris - Cytogenetics Lab Expansion
Selective renovation for expansion of Cytogenetics Labs, including multiple lab areas and the addition of an additional emergency generator.
11/02/2022 06:00 PM UTC
OSU-210682 - Mansfield - Civic Plaza Improvements REBID
This project will create a new outdoor plaza area between Eisenhower Memorial Center and Conard Hall - approx. 4,000 SF
10/27/2022 06:00 PM UTC
201 - 210 of 622 Solicitations
1 2 17 18 19 21 23 24 25 62 63