General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
OSU-210116, 610 Ackerman Warehouse
HVAC, Fire Suppression, and electrical upgrades; safety, security, and accessibility upgrades; limited interior construction including new plumbing facilities.
01/31/2022 07:00 PM UTC
OSU-210180, Aerospace Research Center - Rm 121 Upgrades (REBID)
OSU Columbus Campus: Provide and install the electrical feeder(s) and infrastructure, including premanufactured modular units, to allow for future installation of Owner equipment.
01/24/2022 07:00 PM UTC
OSU-191035 Field Hockey Press Box
This Project will provide demolition, new site work and building construction of the Field Hockey Press Box located on the West side of the existing Buckeye Field.
01/20/2022 07:00 PM UTC
OSU-210283 Mansfield - Recreation Center Fire Alarm Upgrade
This project will provide new manual, addressable, voice, ADA compliant fire alarm system in the Recreation Center on the OSU Mansfield Campus.
01/18/2022 07:00 PM UTC
OSU-210282 Mansfield - Boiler Replacement
OSU Mansfield Campus: Campus Recreation Center - Remove existing boiler. Install 2 high efficiency boilers, pumps, and expansion tank. Eisenhower Memorial Center - Remove existing boilers. Install 2 high efficiency boilers, abatement and 2 alternates
01/18/2022 07:00 PM UTC
OSU-210285 - Mansfield - Building Entries Renewal and Renovation
Replace selected existing main entrance vestibules, doors, storefront, ADA hardware and miscellaneous exterior concrete slabs at the following buildings: Campus Recreation Center (1729 University Drive) and Eisenhower Memorial Hall (1640 University Drive) located on The Ohio State University’s Mansfield Campus, Mansfield, Ohio, Richland Country.
01/18/2022 07:00 PM UTC
OSU-210289, Newark - HVAC Renovations
The work includes the replacement of an existing packaged RTU on the first floor roof of Hopewell Hall. The existing unit is a packaged DX cooling unit with hot water heat. The new unit will be of like design. Existing duct connection points to remain in the same place. Electrical power to RTU equipment will be replaced. Lightning protection system will be extended to new RTU. The single ply membrane roof system will require modifications to allow for the new unit and duct. A small portion of roof railing for fall protection.
01/11/2022 07:00 PM UTC
OSU-200104 HVAC Replacements FY 2020 Project REBID
This project will renovate and update building HVAC systems in buildings constructed after 1999.
12/16/2021 07:00 PM UTC
OSU-210119, 600 & 610 Roof Replacement REBID
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
12/10/2021 07:00 PM UTC
OSU-210308, Evans Hall - Pathology Space
Renovations to select areas of the existing 1st and 2nd floors of Evans Hall to create more functional program spaces and support the College of Medicine, Department of Pathology.
12/09/2021 07:00 PM UTC
201 - 210 of 566 Solicitations
1 2 17 18 19 21 23 24 25 56 57