General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-210346, East - Renovate for Flouro and ED X-Ray
The Project consists of the renovation of select areas on Level 2 of The Ohio State University Wexner Medical Center East Hospital to support the replacement of existing medical imaging equipment in CT, X-Ray, Rad-Fluoro, and Stress/Echo.
09/30/2022 06:00 PM UTC
OSU-210795 Longaberger Multi-floor Renovations
This project will renovate lower level, 2nd, and 3rd floors including removing walls to open spaces, new flooring, paint, and updating staff desks and furniture.
09/30/2022 06:00 PM UTC
OSU-210393 Healthy Community Center Renovation
Repurpose and renovation of the existing Martin Luther King Library on Long Street into a “Healthy Community Center” including demonstration kitchen, rentable community space, and leasable café
09/26/2022 06:00 PM UTC
OSU-220002, MMP Pavilion - Sola MRI
Removal of existing MRI Equipment and replacement within existing MRI suite. Associated work to include limited demolition and upgrades to associated structural and MEP systems within the suite and on the roof of the existing building. Work to be completed within an active patient environment.
09/26/2022 06:00 PM UTC
OSU-210310, Graves - Pathology Renal Space Phase 1 and Phase
The project will consist of the construction of approximately 2100 SF of existing space into lab space and approximately 2175 SF of office space renovations in the basement of Graves Hall on the Columbus Campus of The Ohio State University, 333 W. 10th Ave., Columbus, Ohio.
09/08/2022 06:00 PM UTC
OSU-220509, Arps Hall - Rms 065, 127, 154J, 192 & Restrooms
Columbus Campus: The scope of work includes the renovation of existing Rooms 065K and 065N to accommodate a new Video Studio (Room 065Q), as well as a new entry (Room 065N) and multi-use room (Room 065P). Renovation of Office Suite 127 which will include (2) private offices, an open office, a reception area, small kitchenette and copy center. New entry into Suite 127 and existing conference room (Room 133). Renovate Rooms 191 and 192 to provide a lactation & meditation space, which will include a small kitchenette. Create a new south entry for office suite 196A. A new single user toilet room - Room 154T. Renovate (2) two existing men's toilet rooms, one on the 2nd Floor Room 263T (Alternate G-1) and the other on the 3rd Floor Room 359T (Alternate G-2).
09/07/2022 06:00 PM UTC
OSU-150031, OSU African-American Extension Center (Community Project) - REBID
Renovation of 4,892 SF of the OSU African-American Community Extension Center located at 905 Mount Vernon Avenue, Columbus, Ohio. The project scope includes: The removal of an existing computer lab, three (3) offices and an equipment storage area to create a new flexible Computer Lab, a new Classroom, new ADA family Toilet Room and new open Gathering/Library Space. See also Alternates.
08/31/2022 06:00 PM UTC
OSU-210542 Rhodes - Room S212 DR X-ray & Room S240F Bi-Plane
Rhodes - Room S212 DR X-ray & Room S240F Bi-Plane This project will remove and install new DR x-ray equipment.
08/31/2022 06:00 PM UTC
OSU-210456 - Wooster - Lab Bldg USDA Rm 305
This project will improve to shell space and create two offices with costs assumed by USDA and all finished and new spaces to be leased by USDA.
08/26/2022 06:00 PM UTC
OSU-160980 Plumbing System Replacement BP3 - Wilce Piping Replacement
This project will replace deteriorating plumbing systems.
08/18/2022 05:00 PM UTC
201 - 210 of 608 Solicitations
1 2 17 18 19 21 23 24 25 60 61