General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-210682 - Mansfield - Civic Plaza Improvements
This project will create a new outdoor plaza area between Eisenhower Memorial Center and Conard Hall - approx. 4,000 SF. OSU Mansfield Campus, Mansfield OH.
04/22/2022 06:00 PM UTC
OSU-190314, James - Clinical Eng Offices
Renovations to rooms L004 and L060 on the Conference Level of the James Cancer Hospital, to accommodate Clinical Engineering, Zone Shop, and Materials Management.
04/22/2022 06:00 PM UTC
OSU-210096, Doan-Rhodes - Replace Imaging Equipment
Replaces two existing fluoroscopy rooms and a nuclear medicine camera along with renovation of surrounding support spaces including an existing toilet to comply with ADA. Scope of work includes associated MEP, Fire Protection Systems, and Hazardous Material removal. The work is to be performed in three phases. Phase one – the Zee MP and Spect CT areas, phase two – the Agile area and phase three – the tech work area.
04/12/2022 06:00 PM UTC
OSU-210287, Marion - Alber Student Center Renovation Ph 2
OSU Marion: Interior renovation and improvement of selected areas of the Alber Student Center, including the existing public restrooms, locker rooms, game room, and gymnasium.
04/08/2022 06:00 PM UTC
OSU-190066 HVAC Replacements FY 2019 - Bid Package 02
Davis Heart and Lung: Delta Controls Replacements
04/01/2022 06:00 PM UTC
OSU-210440, Airport - Hangar Airpark Development (REBID)
OSU Airport: Extension of Taxiway A8 and Service Road (REBID)
03/30/2022 06:00 PM UTC
OSU-210286 - Mansfield - Exterior Signs and Walk Renovation
This project will include the fabrication and installation of campus-wide exterior signage including vehicular directional, pedestrian directional, service area identification, building identification, parking lot identification. Also includes removal of some existing exterior signs
03/25/2022 06:00 PM UTC
OSU-200328 Tunnel System Evaluation - BP 1 Tunnel Temporary
The project consists of the installation of temporary structural supports within the 19th Avenue Tunnel and the Cockins Hall Vault. The project will also remove and replace piping within the Cockins Hall Vault, remove abandoned utilities within the 19th Avenue Tunnel, and re-rack existing communications cabling within the 19th Avenue Tunnel. Temporary lighting will also be installed in the 19th Avenue Tunnel.
03/25/2022 06:00 PM UTC
OSU-210274-1, BMEC Ph 2 - Demolition
OSU Columbus Campus: The scope will include the total demolition of Watts Hall (2041 College Rd, Columbus, OH 43210-1178) which is physically connected to MacQuigg Hall (105 W Woodruff Ave, Columbus, OH 43210-1117). The buildings are located in the central core of campus which is highly populated. The building to remain will need to be shored and separated from Watts along with disconnection and termination of any utility and mechanical pipes that may feed the building from MacQuigg. The scope of work to include building demolition, abatement, MEP / Electrical disconnects, site work, and shoring of building to remain. Upon completion of the demolition, the site will need to be brought to grade and seeded. The demolition will allow for future building to be erected for the Biomedical and Materials Engineering Complex.
03/23/2022 06:00 PM UTC
OSU-210440, Airport - Hangar Airpark Development
OSU Airport: Extension of Taxiway A8 and Service Road
03/03/2022 07:00 PM UTC
211 - 220 of 593 Solicitations
1 2 18 19 20 22 24 25 26 59 60