OSU-250012 - Fawcett Center - Walk-in Cooler Freezer Replacement
This project will replace the freezer and coolers on the first floor of the Fawcett Center.
08/21/2025 06:00 PM UTC
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima Campus: The Project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4276 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems
09/03/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-190122 Infrastructure Improvements 1
Replace approximately two dozen failing and non-compliant curb ramps across campus.
08/12/2021 12:35 PM UTC
OSU-200538 Orton Hall Envelope Repairs
OSU-200358 This project includes building envelope repairs to Orton Hall, including isolated masonry and below-grade waterproofing repairs, as well as roofing. The roofing scope includes repairs to the main roof flashings and drainage elements, as well as replacement of the apse roof and leakage repairs at the northeast corner.
08/06/2021 06:00 PM UTC
OSU-210119, 600 & 610 Ackerman Roof Replacement REBID
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
08/04/2021 06:00 PM UTC
OSU-200102 Enhanced Maintenance FY 2020
This project includes the rehabilitation of building enclosure elements at Lazenby Hall, including isolated masonry and window repairs, and replacement of the clay tile roof. The roof replacement will include new flashings and drainage elements, and reuse the clay roof tiles.
07/29/2021 06:00 PM UTC
OSU-200539, Harding Hosp - Nursing Station Renovation
OSU Harding Hospital Nursing Station renovation. Work Includes renovation to existing Nurse Station on Level 2, Level 3 and Level 4.
07/15/2021 06:00 PM UTC
OSU-210119, 600 & 610 Ackerman Roof Replacement
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
07/14/2021 06:00 PM UTC
OSU-190008 Road and Bridge Improvements, FY19-Bid Package No-03
New BP3 - Hess Road
07/09/2021 06:30 PM UTC
OSU-190394, Wooster - Seed Storage
OSU Wooster Campus: Provide and install a complete, operational 12’x36’x9’H walk-in environmental unit with two, equally-sized interior spaces. Provide all indicated infrastructure modifications indicated on plans
06/29/2021 06:00 PM UTC
OSU-210176. Arps Hall 168T, 178T and 180T Improvements
Renovate approximately 455 SF of toilet rooms on the first floor of Arps Hall located at 1945 N. High Street in Columbus, Ohio. The project scope includes Rooms 168T, and a combination of 178T and 180T. The scope of the renovations will reconfigure the existing toilet rooms identified above: to transform the current Women’s toilet room 168T into a new ADA compliant Multi-User Men’s Toilet Room and to combined Rooms of 178T a current Women’s toilet room and 180T a current Men’s toilet room into a new ADA compliant Multi-User Women’s Toilet Room. The existing janitor’s closet, Room 180J, will also be modified.
06/29/2021 06:00 PM UTC
OSU-200437, Howlett Hoop House Replacements (REBID)
Columbus Campus: Site modifications, structure demolition and construction of new prefabricated Hoop Houses for The Ohio State University as described in the documentation issued by and Ford & Associates Architects, Inc. dated June 3, 2021.