OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/14/2025 06:00 PM UTC |
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
| 05/20/2025 06:00 PM UTC |
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001
Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
| 05/21/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-200437, Howlett Hoop House Replacements
Columbus Campus: Site modifications, structure demolition and construction of new prefabricated Hoop Houses for The Ohio State University as described in the documentation issued by and Ford & Associates Architects, Inc. dated March 31, 2021.
| 05/11/2021 06:00 PM UTC |
OSU-200518, Doan-Exterior Brick Repair
OSU Main Campus: The project includes repairs to the exterior brick masonry façade at the east end of the north elevation of Doan Hall. The masonry repairs include the replacement of the through-wall flashing at shelf angles/lintels, isolated shelf angle replacement, brick masonry replacement at isolated distress, installation of brick masonry infill at former air conditioning units, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent. Additionally, the project includes installation of new storm windows at operable portions of the existing windows. The work is divided into 2 phases presented as follows:
Base Bid – Phase 1: West
Alternate 1 – Phase 2: Central
| 04/27/2021 06:00 PM UTC |
OSU-200604, Wooster - Selby Hall Elevator Replacement (Rebid)
OSU Wooster: The work consists of the modernization of the existing hydraulic elevator and machinery, as well as associated electrical and mechanical work, including the addition of a rooftop package unit for conditioning of the 3rd level machine room. Repairs to the hoistway masonry, along with associated flashing and coping repair are included as an alternate. Interior car finish upgrades are also included as an alternate.
| 04/21/2021 06:00 PM UTC |
OSU-200548, MMP Tower HVAC Plan - REBID
The project consists of finish refresh, minor alterations for accessibility improvements, and HVAC AHU replacement and controls updates for the 11th floor of the existing Martha Morehouse Outpatient Care Tower. The AHU serving this floor is in the 12th Floor Mechanical Penthouse.
| 04/15/2021 06:00 PM UTC |
OSU-200104 HVAC Replacements FY 2020
RPAC/PEAS/McCorkle: Update Siemens Controls
Knowlton Hall: Update Siemens Controls
Davis Heart and Lung: Delta Controls Replacements
Parker Food Science and Technology: Delta Controls Replacements Veterinary Med Academic: Delta Controls Replacements
Scott Laboratory: Delta Laboratory Controls Replacement
| 04/09/2021 05:00 PM UTC |
OSU-200548, MMP Tower HVAC Plan
The project consists of finish refresh, minor alterations for accessibility improvements, and HVAC AHU replacement and controls updates for the 11th floor of the existing Martha Morehouse Outpatient Care Tower. The AHU serving this floor is in the 12th Floor Mechanical Penthouse.
| 03/26/2021 06:00 PM UTC |
OSU-200101 West Campus Infrastructure Phase 1 BID PACKAGE 2
This project will provide infrastructure to support building projects in the west campus area, including WMC West Campus Ambulatory Facilities, Energy Advancement and Innovation Center, and the Interdisciplinary Research Facility. Improvements include additional vehicular lanes, modified/new intersection signalization, surface parking lots, and internal access roads. Utility work includes sanitary sewer, stormwater and water service extension.
| 03/26/2021 03:00 PM UTC |
OSU-190877, Parks - Room 345 Renovation
OSU Main Campus: The project includes the renovation of Suite 335 and 345 in Parks Hall for the College of Pharmacy, approximately 3,400 square feet. The work includes selective interior demolition, abatement, and infrastructure demolition for the renovation of new research laboratories and support spaces. Scope of work includes new interior partitions, finishes, HVAC infrastructure upgrades, power/data distribution and lighting associated with the renovated spaces, new and modified plumbing associated with the renovated spaces.
| 03/23/2021 06:00 PM UTC |
OSU-210094 Oxley's By The Numbers Plaza Phase 2
This project is the second phase of the plaza renovation.
| 03/11/2021 07:30 PM UTC |
OSU- 190127 Water Meter Back Flow Preventerw Solicitation (24)
This project will install a back flow preventers at the two main City of Columbus domestic water meters.
(1) Intersection of Lane and Olentangy River Road
(2) Intersection of John Herrick Drive and Olentangy River Road
| 03/10/2021 07:30 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.