OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-200044, Fawcett - Boiler Replacement
Replacement of 2 existing natural gas firetube boilers with 3 Aerco condensing boilers to match one existing Aerco condensing boiler. New boiler plant to be piped in a primary/secondary loop configuration. Each new boiler will have a new inline circulating pump. New DDC temperature controls will be installed for monitoring and control of new HVAC equipment.
| 02/13/2020 07:00 PM UTC |
|
OSU-190025 Rof Replacement FY 19 Bid Package 1
This project will replace roofs on various campus buildings.
| 02/11/2020 06:00 PM UTC |
|
OSU-170840, Dodd - Hospitality Center (REBID)
Renovation of an existing 1400 SF kitchen into a finishing kitchen including new finishes, new walls and doors, new lighting, modifications to HVAC, Plumbing, and FA, FS. Existing equipment will be relocated into a temporary swing space that is an existing Kitchen. Contractor to work with owner FS Vendor.
| 02/07/2020 07:00 PM UTC |
|
OSU-160975
Electrical System Renewal, BP2 - This project will replace emergency egress lighting, receptacles, conduit and wire.
| 02/06/2020 06:00 PM UTC |
|
OSU-190066 PH 2 BP 1
HVAC Replacements FY 2019 – Phase 2, Bid Package 1
This project will replace boilers, air system distribution or components, building controls, exhaust, and primary heating sources.
| 01/28/2020 06:00 PM UTC |
|
OSU-190066 PH 2 BP 2
HVAC Replacements FY 2019 – Phase 2, Bid Package 2
This project will replace boilers, air system distribution or components, building controls, exhaust, and primary heating sources.
| 01/28/2020 06:00 PM UTC |
|
OSU-160929, Lima - Standby Generators, BP#2
OSU Lima Campus: The project consists of providing a new generator and associated automatic transfer switch for the Perry Webb Student Life building. The project will include all plumbing and mechanical work required for the electrical scope to be completed.
| 01/27/2020 07:00 PM UTC |
|
OSU-180785, Lima - Reed Restroom Renovation
Lima Campus: Renovation of two public restrooms adjacent to the theater lobby. The following items are a part of the restroom renovation within the scope of the project: provide accessible toilets, refresh interior finishes and design plumbing fixture replacement, update accessories and improve lighting.
| 01/21/2020 07:00 PM UTC |
|
OSU-180764, Mansfield - Conard Hall Labs (REBID)
OSU Mansfield Campus:
Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
| 01/15/2020 07:00 PM UTC |
|
OSU-191003, Aero Research Ctr - Room 121 Electric
Provide and install a new electrical service for equipment testing. Service shall be 277/480V – 3000A.
| 01/14/2020 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.