OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-120059 REBID Cannon Drive Relocation Phase 1 BP2 Entry
REBID This project will relocate Cannon Drive between King Ave and John Herrick Drive.
11/26/2019 07:00 PM UTC
OSU-190078, Central Service - Lock & Key Relocation (REBID)
(REBID) Columbus Campus: Development Lock Shop from the McCracken Power Plant to the basement of the Central Service Building 3,000 GSF. This move will include preparing the Central Service Building basement and first floor rooms 164, 164B, and 164C to be modified to accommodate the FOD Lock Shop’s user needs.
11/22/2019 07:00 PM UTC
OSU-180938, Baker Systems - Room 480 Renovation
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
11/19/2019 07:00 PM UTC
OSU-180712, University - Suites 247 and 250 Renovation
The renovation of approximately 9,404 SF of office area on the 2nd Floor of University Hall located at 230 N. Oval Mall, in Columbus, Ohio. The project scope includes three (3) Office suites 247, 250 and 214. Flooring material, prep and installation will be through State Contract. Office/Conference glass entry fronts, by DIRTT, materials and installation will be through State Contract.
11/08/2019 07:00 PM UTC
OSU-190304 Lima - Reed HVAC Upgrade (REBID)
(REBID) OSU Lima Campus: The project includes upgrades to the Reed Hall chilled water plant. The existing 150 ton water-cooled chiller and its associated chilled water pump, cooling tower, condenser water pump, and piping will be removed. The existing system will be replaced with a new air-cooled chiller, new primary and secondary chilled water pumps, and a new plate and frame heat exchanger.
11/07/2019 07:00 PM UTC
OSU-190121 Elevator Upgrade and Modernization FY 19
Elevator Modernization and related architectural and MEP scopes of work for a total of 7 elevators in 5 buildings on OSU’s Main Campus: Faculty Club/Animal Science Building/Meiling Hall /Rightmire Hall/Mendenhall Laboratory
11/05/2019 06:00 PM UTC
OSU-120059 Cannon Drive Relocation Phase 1 BP2 Entry
Construction of a new entry feature structure at the Cannon and King intersection on Ohio States Campus. The entry feature will be constructed of reinforced concrete, reinforced masonry, and brick veneer. Aesthetic caps, lighting, and plaques are also proposed.
11/01/2019 06:00 PM UTC
OSU-190291, Bolz - 4th Floor Renovation
Demolition of the interior portion of the 4th floor of Bolz Hall to allow for renovation of the space to include, open studio areas, offices, conference rooms, and Men’s and Women’s rooms. Also included is associated plumbing, HVAC, and electrical work.
10/28/2019 06:00 PM UTC
OSU-190221, 2001 Polaris - Roof Replacement
Work includes removal of existing roof top units, associated curbs, and associated utilities, and installation of metal roof panels and associated roof flashings where units have been removed, located at 2001 Polaris Parkway, Columbus Ohio 43240.
10/15/2019 06:00 PM UTC
OSU-190029 Dreese - HVAC System
This project will remove the building chiller and connect the building to the chiller plant.
10/11/2019 05:00 PM UTC