General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
10/01/2026 06:00 PM UTC
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
10/01/2026 06:00 PM UTC
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included. All noisy work is to occur after normal operating hours.
10/06/2026 06:00 PM UTC
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms 670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
10/08/2026 06:00 PM UTC
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
10/12/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-180729, Postle - Cafe
Two room, 715 SF Café located in Postle Hall on the Main campus of the Ohio State University. The project scope includes general construction, mechanical, electrical, technology and plumbing systems, fire alarm and fire protection systems, kitchen equipment, and finishes.
05/20/2020 06:00 PM UTC
OSU-190130
Envelope Renovation - This project will redesign the loading dock on the west elevation of the building.
05/15/2020 06:00 PM UTC
OSU-190120
Emergency Generator Renewal FY2019 Emergency generator replacement at Sisson and Wiseman Halls, diesel tank removal at Sisson Hall
05/08/2020 05:00 PM UTC
OSU-200457
Oxley’s By the Numbers Plaza - Renovation of Oxley plaza
05/07/2020 06:30 PM UTC
OSU-200101
Description West Campus Infrastructure Phase 1- Provide infrastructure to support west campus facilities.
04/01/2020 06:30 PM UTC
OSU-190129
HEATING HOT WATER RENOVATIONS RPAC Building This project will install new heat exchangers in RPAC, which supply heating hot water to RPAC, McCorkle, and PAES Buildings. Also included will be removal of condensate return pumps, new condensate transfer pump and flash tank, variable frequency drives for the existing primary pumps and DDC controls.
03/27/2020 06:00 PM UTC
OSU-190180, Morehouse Tower - 7th-8th Floor Updates
The project consists of renovating the 7th and 8th Floors of the Martha Morehouse Outpatient Care Tower, part of The Ohio State University Wexner Medical Center. The 7th Floor will be renovated in Phase 1, and the 8th Floor will be renovated in Phase 2. Existing finishes, fire protection, mechanicals, power and lighting will be modified in the areas of work. Additionally, a new air handling unit will be provided and installed in the mechanical room on each floor.
03/27/2020 06:00 PM UTC
OSU-160978, Fire System Replacements Phase 2 (BP-02)
The work consists of the removal and replacement of existing fire alarm systems in Hayes Hall with new, addressable systems. Related work includes hazardous material abatement related directly to fire alarm installation, and patching/painting of walls at removed equipment.
03/24/2020 05:00 PM UTC
OSU-190980, 395 W 12th - 3rd Floor Renovation
The project will renovate 1,400 SF at the east end of the suite to provide a new Administration Wing and Chair’s Office, which will include relocating existing walls, minor HVAC, and relocating light fixtures. Additionally, the remainder of the floor, approximately 7,200 SF, will receive finish upgrades, including painting and flooring.
03/20/2020 06:00 PM UTC
OSU-180800, Marion - Alber Student Center Renovation
OSU Marion Campus: Renovation of the Student Center at Marion Campus of The Ohio State University.
03/18/2020 06:00 PM UTC
351 - 360 of 643 Solicitations
1 2 … 32 33 34 36 38 39 40 … 64 65