OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190291, Bolz - 4th Floor Renovation (REBID)
REBID: Demolition of the interior portion of the 4th floor of Bolz Hall to allow for renovation of the space to include, open studio areas, offices, conference rooms, and Men’s and Women’s rooms. Also included is associated plumbing, HVAC, and electrical work.
| 01/06/2020 07:00 PM UTC |
|
OSU-180764, Mansfield - Conard Hall Labs
OSU Mansfield Campus:
Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
| 12/12/2019 07:00 PM UTC |
|
OSU-190819, Rhodes - Room M212A MRI
Renovation of existing MRI room. Project includes replacing existing MRI equipment with new through a removable access panel in the existing exterior wall, room finish upgrades, and repair/modifications to the existing RF shielding to coordinate with new equipment.
| 12/04/2019 07:00 PM UTC |
|
OSU-180712, University - Suites 247 and 250 Renovation (REBID)
REBID: The renovation of approximately 9,404 SF of office area on the 2nd Floor of University Hall located at 230 N. Oval Mall, in Columbus, Ohio. The project scope includes three (3) Office suites 247, 250 and 214. Flooring material, prep and installation will be through State Contract. Office/Conference glass entry fronts, by DIRTT, materials and installation will be through State Contract.
| 12/03/2019 07:00 PM UTC |
|
OSU-120059 REBID Cannon Drive Relocation Phase 1 BP2 Entry
REBID This project will relocate Cannon Drive between King Ave and John Herrick Drive.
| 11/26/2019 07:00 PM UTC |
|
OSU-190078, Central Service - Lock & Key Relocation (REBID)
(REBID) Columbus Campus: Development Lock Shop from the McCracken Power Plant to the basement of the Central Service Building 3,000 GSF. This move will include preparing the Central Service Building basement and first floor rooms 164, 164B, and 164C to be modified to accommodate the FOD Lock Shop’s user needs.
| 11/22/2019 07:00 PM UTC |
|
OSU-180938, Baker Systems - Room 480 Renovation
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
| 11/19/2019 07:00 PM UTC |
|
OSU-180712, University - Suites 247 and 250 Renovation
The renovation of approximately 9,404 SF of office area on the 2nd Floor of University Hall located at 230 N. Oval Mall, in Columbus, Ohio. The project scope includes three (3) Office suites 247, 250 and 214. Flooring material, prep and installation will be through State Contract. Office/Conference glass entry fronts, by DIRTT, materials and installation will be through State Contract.
| 11/08/2019 07:00 PM UTC |
|
OSU-190304 Lima - Reed HVAC Upgrade (REBID)
(REBID) OSU Lima Campus: The project includes upgrades to the Reed Hall chilled water plant. The existing 150 ton water-cooled chiller and its associated chilled water pump, cooling tower, condenser water pump, and piping will be removed. The existing system will be replaced with a new air-cooled chiller, new primary and secondary chilled water pumps, and a new plate and frame heat exchanger.
| 11/07/2019 07:00 PM UTC |
|
OSU-190121 Elevator Upgrade and Modernization FY 19
Elevator Modernization and related architectural and MEP scopes of work for a total of 7 elevators in 5 buildings on OSU’s Main Campus:
Faculty Club/Animal Science Building/Meiling Hall /Rightmire Hall/Mendenhall Laboratory
| 11/05/2019 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.