OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/14/2025 06:00 PM UTC |
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
| 05/20/2025 06:00 PM UTC |
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001
Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
| 05/21/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-160319 Rhodes - Bronchoscopy Procedure Rooms
This project will renovate rooms S247 and S251 into bronchoscopy procedure rooms.
| 08/30/2018 05:30 PM UTC |
OSU-160978 Fire Alarm Replacements Phase 2
The work consists of the removal and replacement of existing fire alarm systems in 6 buildings (Agricultural Engineering Building, Evans Lab, Mershon Auditorium, Newman and Wolfrom Laboratory, Parks Hall and Rightmire Hall) with new, addressable systems. Related work includes hazardous material abatement, patching and painting of walls at removed equipment, and limited ceiling replacement
| 08/30/2018 05:00 PM UTC |
OSU-180221, Drackett Tower - Boiler Replacements
The Project consists of the replacement of 2 domestic water converters with gas-fired water heaters and replacement of 2 heating water boilers on the 13th and 14th Floors of Drackett Tower. The work also includes replacement of 2 domestic water storage tanks, 2 existing cooling towers, and 6 heating water expansion tanks. A new domestic hot water thermostatic mixing valve will be installed for scald protection. The work will be done in phases for minimum impact to building operation.
| 08/29/2018 06:00 PM UTC |
OSU-180526 33 W 11th - Chiller Replacement
This project will install a new chiller on the roof
| 08/23/2018 05:00 PM UTC |
OSU-170213 - Doan Exterior Brick Repair
This project will repair the exterior brick and steel lintels.
| 08/16/2018 05:30 PM UTC |
OSU-180039, Ag Admin - Restroom Renovations
Main Campus: The renovation of approximately 1,676 SF of Restroom space in the Agricultural Administrative Building located at 2120 Fyffe Road, in Columbus, Ohio. The project scope includes rooms 027T, 031T, 038T, 038A, 040T, 100T, 102T and 103T. The new restroom renovations will reconfigure the rooms identified above to include Group and Family Restrooms, and a Wellness Room.
| 07/31/2018 06:00 PM UTC |
OSU-150403
University Hospital - Relocate Surgical Pathology Phase II
| 07/18/2018 05:30 PM UTC |
OSU-150572 Psychology - Envelope Repair
1835 Neil Avenue, Columbus
Restore the original design intent of the exterior envelope of the Psychology Building by removing and reinstalling the existing Centria Insulated Metal Panel cladding. Prior to reinstalling, additional measures including, but not limited to, roofing termination repairs, firestopping repairs, and flashing and substrate modifications will be implemented to maintain the air and watertightness of the exterior envelope.
| 07/18/2018 05:00 PM UTC |
OSU-170535, Mansfield - Molyet Village Comm Bldg
One story wood frame 7,583 SF community building located near Molyet Village on the Mansfield campus of The Ohio State University. The project scope includes adjacent site area improvements, foundation and framing and exterior envelope, mechanical, electrical, technology and plumbing systems, fire alarm and fire protection systems, casework, finishes.
| 07/11/2018 06:00 PM UTC |
OSU-170533, Lincoln Tower 14th Floor Renovation (REBID)
Lincoln Tower 14th Floor Renovation REBID
1800 Cannon Drive, Columbus, OH 43210
Complete renovation of the 14th floor of Lincoln Tower.
| 06/29/2018 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.