General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-180783, Lima - Outdoor Lighting Upgrades
Lima Campus: The Project upgrades street, parking lot and pathway lighting as identified on the documents. The Project replaces and provides new poles/luminaries/pole bases based on Lima Campus standard Lithonia round steel poles and LED area luminaires.
10/04/2019 06:00 PM UTC
OSU-190304, Lima - Reed HVAC Upgrade
OSU Lima Campus: The project includes upgrades to the Reed Hall chilled water plant. The existing 150 ton water-cooled chiller and its associated chilled water pump, cooling tower, condenser water pump, and piping will be removed. The existing system will be replaced with a new air-cooled chiller, new primary and secondary chilled water pumps, and a new plate and frame heat exchanger.
10/04/2019 05:00 PM UTC
OSU-190620, Mount - Room 202 Glass Installation
The Ohio State University Main Campus. Demolition of existing curtain walls and install new insulated curtain walls, Franklin County, Ohio
09/27/2019 06:00 PM UTC
OSU-190049, Newark - Pavement Renovations
Bid Package #2 Newark Campus: Pavement renovations includes the reconstruction of lot K, the relocation of lot K access drive, restriping, and lot K pavement marking reconfigurations of the Ohio State University and Central Ohio Technical College Newark Campus.
09/26/2019 06:00 PM UTC
OSU-190192, Lincoln - 11th and 13th Office Renovation
Interior renovation of existing 11th and 13th floors of Lincoln Tower to create new offices suites for the departments of Hematology and Medical Oncology. Work will include interior demolition, interior partitions, casework, millwork, doors, finishes, fire protection, plumbing, HVAC, electrical and fire alarm scopes.
09/11/2019 06:00 PM UTC
OSU-190371, MMPP - 3rd Floor Lobby and Clinical Spaces
Remodel 5,783 SF of existing interior space of the 32,820 SF existing 3rd Floor in the Martha Morehouse Pavilion building: Including the renovation of existing areas to create new office space, reception, and waiting area near elevator lobby. Work to include walls, doors, ceilings, finishes and related MEP items. A suite belonging to The Ohio State University.
08/26/2019 06:00 PM UTC
OSU-190572, Case Road Animal Facility Relocation
Renovation and improvements of an existing metal storage building structure to house sheep and goats. Renovations include improvements to the existing building, a new Lab and Restroom. There is an alternate for a 1,650 SF mezzanine structure. There are allowances and unit pricing for limited existing metal roof and wall repairs. Existing gutters and downspouts will be removed and replaced. There is limited site and building plumbing work, limited HVAC and electrical work.
08/26/2019 06:00 PM UTC
OSU-190513, Vet Med Center - ER Expansion (REBID)
The renovation of two small animal holding wards approximately 680 sf into a new emergency treatment and triage room. Project will install a new entry sliding door and door to dog run, new metal casework, and built ins for owner supplied equipment. New finishes include furred walls, soffits, resinous floor with integrated base and suspended ceiling. Building system alterations include lighting, new plumbing and modifications to the HVAC and medical air.
08/23/2019 06:00 PM UTC
201860.00, 1003 Kinnear Road - Roof Replacement
Replacement of existing built up roof with insulated EPDM membrane, including minor metal deck repair, roof top upgrades, & abandoned equipment removal.
08/21/2019 06:00 PM UTC
OSU-190078, Central Service - Lock & Key Relocation
Development Lock Shop from the McCracken Power Plant to the basement of the Central Service Building 3,000 GSF. This move will include preparing the Central Service Building basement and first floor rooms 164, 164B, and 164C to be modified to accommodate the FOD Lock Shop’s user needs.
08/20/2019 06:00 PM UTC
361 - 370 of 608 Solicitations
1 2 33 34 35 37 39 40 41 60 61