General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-160319, Rhodes - Bronchoscopy Procedure Rooms (REBID)
Renovation of 2,003 SF existing 2nd floor of the hospital. Work including demolition, finishes (floor, room base, paint, ceilings), rigid plastic wainscot, corner guards, structural and related MEP items. Work also includes new HVAC for bronch rooms.
08/08/2019 06:00 PM UTC
OSU-170509, Doan - Neurodiagnostics Renovation
Renovation of approximately 1,715 SF of office/exam area on the 8th Floor of Doan Hall located at 410 W 10th Avenue, in Columbus, Ohio. The project scope includes corridor X805C, Rooms 802, 804, 805, 806, 807 and 808, 808A, 810, and 810A. The new Office/Exam will contain the following areas: 3 Large Exam Rooms, 1 Small Treatment Room, Staff Area for 7 (to include small kitchenette, team space), Large Storage Room and Work Room (to store office supplies).
08/08/2019 06:00 PM UTC
OSU-180809, Doan - 6th and 7th Floor NICU
Doan - 6th & 7th Floor NICU Renovation of 7,150 square feet of the 54,297 square foot existing 6th Floor, and 3,170 square feet of the 30,465 square foot existing 7th Floor, of Doan Hall on The Ohio State University Medical Center Campus, including walls, doors, ceilings finishes, fire protection, plumbing, mechanical, electrical, data, and security work.
08/02/2019 06:00 PM UTC
OSU-190513, Vet Med Center - ER Expansion
The renovation of two small animal holding wards approximately 680 sf into a new emergency treatment and triage room. Project will install a new entry sliding door and door to dog run, new metal casework, and built ins for owner supplied equipment. New finishes include furred walls, soffits, resinous floor with integrated base and suspended ceiling. Building system alterations include lighting, new plumbing and modifications to the HVAC and medical air.
08/01/2019 06:00 PM UTC
OSU-190337, Wooster - Campus Parking Improvements
OSU Wooster Campus: Wooster Campus parking improvements project includes 3 priorities, or alternates. Priority #1 is the installation of a new 150 space parking lot and detention basin located just south of Fisher Auditorium. Priority #2 is to mill and fill the existing parking lot north of Fisher Auditorium between Campus Drive and Gerlaugh Drive. Priority #3 is the installation of a concrete sidewalk from the OARDC Administration building down to the intersection of SR 83 and Madison Ave.
07/23/2019 06:00 PM UTC
OSU-160980 Plumbing System Replacement BP 2
This project will replace deteriorating plumbing systems.
07/11/2019 05:00 PM UTC
OSU-180910, Child Care Center - Chiller Replacement
OSU Columbus Campus: Replace chiller, condenser, refrigerant piping and provide refrigerant alarm system and components.
06/06/2019 06:00 PM UTC
OSU-170318, Rhodes - ADA Restrooms
Renovation - 6 public / 12 patient restrooms and adjacent offices / storage spaces on Rhodes Hall floors 7, 9, 8, 10 and 11. Work is within The Ohio State University Wexner Medical Center.
06/04/2019 06:00 PM UTC
OSU-180168 - Ackerman Gateway
This project will establish upgrades to the intersection of Fred Taylor & Ackerman Rd.
05/16/2019 06:30 PM UTC
OSU-190183, Arps - Suite 172 Renovation
Columbus Campus: Work limited to suite entrances, four offices, conference room, reception, common area, copy room and storage areas on Arps Hall first floor. Work includes new partition walls, doors, ceilings, lighting and finishes.
05/08/2019 06:00 PM UTC
371 - 380 of 608 Solicitations
1 2 34 35 36 38 40 41 42 60 61