General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-120059 Cannon Drive Relocation Phase 1 BP2 Entry
Construction of a new entry feature structure at the Cannon and King intersection on Ohio States Campus. The entry feature will be constructed of reinforced concrete, reinforced masonry, and brick veneer. Aesthetic caps, lighting, and plaques are also proposed.
11/01/2019 06:00 PM UTC
OSU-190291, Bolz - 4th Floor Renovation
Demolition of the interior portion of the 4th floor of Bolz Hall to allow for renovation of the space to include, open studio areas, offices, conference rooms, and Men’s and Women’s rooms. Also included is associated plumbing, HVAC, and electrical work.
10/28/2019 06:00 PM UTC
OSU-190221, 2001 Polaris - Roof Replacement
Work includes removal of existing roof top units, associated curbs, and associated utilities, and installation of metal roof panels and associated roof flashings where units have been removed, located at 2001 Polaris Parkway, Columbus Ohio 43240.
10/15/2019 06:00 PM UTC
OSU-190029 Dreese - HVAC System
This project will remove the building chiller and connect the building to the chiller plant.
10/11/2019 05:00 PM UTC
OSU-180783, Lima - Outdoor Lighting Upgrades
Lima Campus: The Project upgrades street, parking lot and pathway lighting as identified on the documents. The Project replaces and provides new poles/luminaries/pole bases based on Lima Campus standard Lithonia round steel poles and LED area luminaires.
10/04/2019 06:00 PM UTC
OSU-190304, Lima - Reed HVAC Upgrade
OSU Lima Campus: The project includes upgrades to the Reed Hall chilled water plant. The existing 150 ton water-cooled chiller and its associated chilled water pump, cooling tower, condenser water pump, and piping will be removed. The existing system will be replaced with a new air-cooled chiller, new primary and secondary chilled water pumps, and a new plate and frame heat exchanger.
10/04/2019 05:00 PM UTC
OSU-190620, Mount - Room 202 Glass Installation
The Ohio State University Main Campus. Demolition of existing curtain walls and install new insulated curtain walls, Franklin County, Ohio
09/27/2019 06:00 PM UTC
OSU-190049, Newark - Pavement Renovations
Bid Package #2 Newark Campus: Pavement renovations includes the reconstruction of lot K, the relocation of lot K access drive, restriping, and lot K pavement marking reconfigurations of the Ohio State University and Central Ohio Technical College Newark Campus.
09/26/2019 06:00 PM UTC
OSU-190192, Lincoln - 11th and 13th Office Renovation
Interior renovation of existing 11th and 13th floors of Lincoln Tower to create new offices suites for the departments of Hematology and Medical Oncology. Work will include interior demolition, interior partitions, casework, millwork, doors, finishes, fire protection, plumbing, HVAC, electrical and fire alarm scopes.
09/11/2019 06:00 PM UTC
OSU-190371, MMPP - 3rd Floor Lobby and Clinical Spaces
Remodel 5,783 SF of existing interior space of the 32,820 SF existing 3rd Floor in the Martha Morehouse Pavilion building: Including the renovation of existing areas to create new office space, reception, and waiting area near elevator lobby. Work to include walls, doors, ceilings, finishes and related MEP items. A suite belonging to The Ohio State University.
08/26/2019 06:00 PM UTC
371 - 380 of 622 Solicitations
1 2 34 35 36 38 40 41 42 62 63