The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-191035, Field Hockey Press Box
Demolition and new site work and building construction of Field Hockey Press Box located on the West side of the existing Buckeye Field.
| 02/17/2020 07:00 PM UTC |
|
OSU-200044, Fawcett - Boiler Replacement
Replacement of 2 existing natural gas firetube boilers with 3 Aerco condensing boilers to match one existing Aerco condensing boiler. New boiler plant to be piped in a primary/secondary loop configuration. Each new boiler will have a new inline circulating pump. New DDC temperature controls will be installed for monitoring and control of new HVAC equipment.
| 02/13/2020 07:00 PM UTC |
|
OSU-190025 Rof Replacement FY 19 Bid Package 1
This project will replace roofs on various campus buildings.
| 02/11/2020 06:00 PM UTC |
|
OSU-170840, Dodd - Hospitality Center (REBID)
Renovation of an existing 1400 SF kitchen into a finishing kitchen including new finishes, new walls and doors, new lighting, modifications to HVAC, Plumbing, and FA, FS. Existing equipment will be relocated into a temporary swing space that is an existing Kitchen. Contractor to work with owner FS Vendor.
| 02/07/2020 07:00 PM UTC |
|
OSU-160975
Electrical System Renewal, BP2 - This project will replace emergency egress lighting, receptacles, conduit and wire.
| 02/06/2020 06:00 PM UTC |
|
OSU-190066 PH 2 BP 1
HVAC Replacements FY 2019 – Phase 2, Bid Package 1
This project will replace boilers, air system distribution or components, building controls, exhaust, and primary heating sources.
| 01/28/2020 06:00 PM UTC |
|
OSU-190066 PH 2 BP 2
HVAC Replacements FY 2019 – Phase 2, Bid Package 2
This project will replace boilers, air system distribution or components, building controls, exhaust, and primary heating sources.
| 01/28/2020 06:00 PM UTC |
|
OSU-160929, Lima - Standby Generators, BP#2
OSU Lima Campus: The project consists of providing a new generator and associated automatic transfer switch for the Perry Webb Student Life building. The project will include all plumbing and mechanical work required for the electrical scope to be completed.
| 01/27/2020 07:00 PM UTC |
|
OSU-180785, Lima - Reed Restroom Renovation
Lima Campus: Renovation of two public restrooms adjacent to the theater lobby. The following items are a part of the restroom renovation within the scope of the project: provide accessible toilets, refresh interior finishes and design plumbing fixture replacement, update accessories and improve lighting.
| 01/21/2020 07:00 PM UTC |
|
OSU-180764, Mansfield - Conard Hall Labs (REBID)
OSU Mansfield Campus:
Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
| 01/15/2020 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.