OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-190572, Case Road Animal Facility Relocation
Renovation and improvements of an existing metal storage building structure to house sheep and goats. Renovations include improvements to the existing building, a new Lab and Restroom. There is an alternate for a 1,650 SF mezzanine structure. There are allowances and unit pricing for limited existing metal roof and wall repairs. Existing gutters and downspouts will be removed and replaced. There is limited site and building plumbing work, limited HVAC and electrical work.
08/26/2019 06:00 PM UTC
OSU-190513, Vet Med Center - ER Expansion (REBID)
The renovation of two small animal holding wards approximately 680 sf into a new emergency treatment and triage room. Project will install a new entry sliding door and door to dog run, new metal casework, and built ins for owner supplied equipment. New finishes include furred walls, soffits, resinous floor with integrated base and suspended ceiling. Building system alterations include lighting, new plumbing and modifications to the HVAC and medical air.
08/23/2019 06:00 PM UTC
201860.00, 1003 Kinnear Road - Roof Replacement
Replacement of existing built up roof with insulated EPDM membrane, including minor metal deck repair, roof top upgrades, & abandoned equipment removal.
08/21/2019 06:00 PM UTC
OSU-190078, Central Service - Lock & Key Relocation
Development Lock Shop from the McCracken Power Plant to the basement of the Central Service Building 3,000 GSF. This move will include preparing the Central Service Building basement and first floor rooms 164, 164B, and 164C to be modified to accommodate the FOD Lock Shop’s user needs.
08/20/2019 06:00 PM UTC
OSU-160319, Rhodes - Bronchoscopy Procedure Rooms (REBID)
Renovation of 2,003 SF existing 2nd floor of the hospital. Work including demolition, finishes (floor, room base, paint, ceilings), rigid plastic wainscot, corner guards, structural and related MEP items. Work also includes new HVAC for bronch rooms.
08/08/2019 06:00 PM UTC
OSU-170509, Doan - Neurodiagnostics Renovation
Renovation of approximately 1,715 SF of office/exam area on the 8th Floor of Doan Hall located at 410 W 10th Avenue, in Columbus, Ohio. The project scope includes corridor X805C, Rooms 802, 804, 805, 806, 807 and 808, 808A, 810, and 810A. The new Office/Exam will contain the following areas: 3 Large Exam Rooms, 1 Small Treatment Room, Staff Area for 7 (to include small kitchenette, team space), Large Storage Room and Work Room (to store office supplies).
08/08/2019 06:00 PM UTC
OSU-180809, Doan - 6th and 7th Floor NICU
Doan - 6th & 7th Floor NICU Renovation of 7,150 square feet of the 54,297 square foot existing 6th Floor, and 3,170 square feet of the 30,465 square foot existing 7th Floor, of Doan Hall on The Ohio State University Medical Center Campus, including walls, doors, ceilings finishes, fire protection, plumbing, mechanical, electrical, data, and security work.
08/02/2019 06:00 PM UTC
OSU-190513, Vet Med Center - ER Expansion
The renovation of two small animal holding wards approximately 680 sf into a new emergency treatment and triage room. Project will install a new entry sliding door and door to dog run, new metal casework, and built ins for owner supplied equipment. New finishes include furred walls, soffits, resinous floor with integrated base and suspended ceiling. Building system alterations include lighting, new plumbing and modifications to the HVAC and medical air.
08/01/2019 06:00 PM UTC
OSU-190337, Wooster - Campus Parking Improvements
OSU Wooster Campus: Wooster Campus parking improvements project includes 3 priorities, or alternates. Priority #1 is the installation of a new 150 space parking lot and detention basin located just south of Fisher Auditorium. Priority #2 is to mill and fill the existing parking lot north of Fisher Auditorium between Campus Drive and Gerlaugh Drive. Priority #3 is the installation of a concrete sidewalk from the OARDC Administration building down to the intersection of SR 83 and Madison Ave.
07/23/2019 06:00 PM UTC
OSU-160980 Plumbing System Replacement BP 2
This project will replace deteriorating plumbing systems.
07/11/2019 05:00 PM UTC