The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
| 04/06/2026 06:00 PM UTC |
|
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
| 04/08/2026 06:00 PM UTC |
|
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas
storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
| 04/10/2026 06:00 PM UTC |
|
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
| 04/16/2026 06:02 PM UTC |
|
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
| 04/23/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-170840, Dodd - Hospitality Center
Renovation of a 1400 SF finishing kitchen including new finishes, new lighting, modifications to HVAC, Plumbing, and FA, FS. Electrical modifications to a swing space existing Kitchen to accommodate Owner Provided equipment.
| 04/30/2019 06:00 PM UTC |
|
OSU-180252, Ross - Room H1146 MRI
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, wall demolition, new wall construction, mechanical, electrical, and plumbing work to accommodate new walls. Upgrade of the existing MRI, Primary MEP systems are existing to remain.
| 04/23/2019 06:00 PM UTC |
|
OSU-170011, Fry Hall - Optometry Clinic Entrance - Bid Package #3
Interior renovation to the limited areas of six levels of an existing 6-story academic and office building. Renovations include reconfiguration of office, conference room, and classroom areas, addition and reconfiguration of toilet rooms, and finish improvements. HVAC, lighting, fire protection, and fire alarm upgrades and improvements are included in the areas of renovation. Project is to be completed in three phases with multiple turn over milestones.
| 04/16/2019 06:00 PM UTC |
|
OSU-190132 Civic Space Improvements
This project will improve key gathering, social and study spaces
| 04/09/2019 06:00 PM UTC |
|
OSU-180723, Bradley & Paterson - Entry Hardscape Improvements
This project removes existing improvements around the north entry for Bradley and Paterson Halls and installs new improvements including sidewalk, pavers, seating walls, stairs, seating, plantings, turf, drain basins, lighting modifications, and other restoration items required to complete the work.
| 04/04/2019 06:00 PM UTC |
|
OSU-170816, Campbell - Teaching Kitchen Fire Suppression
OSU Main Campus: The project is a general demolition of an existing 700 plus square foot space previously utilized as a home economics type cooking space. The existing cabinets, ovens, dishwashers, garbage disposals are to be demolished and removed. All existing finishes including ceiling, flooring and walls are to be removed and replaced. The space is to be re-constructed with new casework into a demonstration type teaching kitchen. A new exhaust hood with fire suppression system is to be installed along with new MEP systems in the room as well as new exhaust equipment on the roof. Existing shafts are to be re-used for the exhaust system in the neighboring classroom. Work in the neighboring classroom will need to be completed around the scheduled classroom activities. All new kitchen equipment is to be provided and installed as part of this contract.
| 04/03/2019 06:00 PM UTC |
|
OSU-160319, Rhodes - Bronchoscopy Procedure Rooms
RENOVATION OF 2,003 SF EXISTING 2ND FLOOR OF THE HOSPITAL. WORK INCLUDING DEMOLITION, FINISHES (FLOOR, ROOM BASE, PAINT, CEILINGS), RIGID PLASTIC WAINSCOT, CORNER GUARDS, STRUCTURAL AND RELATED MEP ITEMS. WORK ALSO INCLUDES NEW HVAC FOR BRONCH ROOMS.
| 03/28/2019 06:00 PM UTC |
|
OSU-190063 Arwell Chiller Replacement
The Project consists of replacement of a nominal 350 ton water-cooled centrifugal chiller with a new unit of the same capacity. Existing pumps and cooling tower to remain. The University has pre-purchased the chiller for installation by the contractor. Project includes enlarging an existing wall opening to get new chiller into the
Penthouse.
| 03/20/2019 06:00 PM UTC |
|
OSU-190194, Drinko - Saxbe Auditorium Renovation
OSU Main Campus: Interior renovation of the existing auditorium to meet the current needs of the college. New seating, accessibility modifications, and revised mechanical, electrical, and technology systems associated with the renovation.
| 03/14/2019 06:00 PM UTC |
|
OSU-180784, Lima - Campus Paving Improvements
OSU Lima: Replace Parking Lot C at OSU Lima Campus by process of reclaiming asphalt base. Alternate 1 will include full depth asphalt replacement in Parking Lot C in lieu of reclaiming asphalt base per base bid. Alternate 2 will include improvements to the Public Service Building Entry. Alternate 3 will include removal and replacement of the drive connecting Parking Lot C and Parking Lot A. Alternate 4 will include pavement repair in Parking Lot A.
| 03/05/2019 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.