The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-180910, Child Care Center - Chiller Replacement
OSU Columbus Campus: Replace chiller, condenser, refrigerant piping and provide refrigerant alarm system and components.
| 06/06/2019 06:00 PM UTC |
|
OSU-170318, Rhodes - ADA Restrooms
Renovation - 6 public / 12 patient restrooms and adjacent offices / storage spaces on Rhodes Hall floors 7, 9, 8, 10 and 11. Work is within The Ohio State University Wexner Medical Center.
| 06/04/2019 06:00 PM UTC |
|
OSU-180168 - Ackerman Gateway
This project will establish upgrades to the intersection of Fred Taylor & Ackerman Rd.
| 05/16/2019 06:30 PM UTC |
|
OSU-190183, Arps - Suite 172 Renovation
Columbus Campus: Work limited to suite entrances, four offices, conference room, reception, common area, copy room and storage areas on Arps Hall first floor. Work includes new partition walls, doors, ceilings, lighting and finishes.
| 05/08/2019 06:00 PM UTC |
|
OSU-170840, Dodd - Hospitality Center
Renovation of a 1400 SF finishing kitchen including new finishes, new lighting, modifications to HVAC, Plumbing, and FA, FS. Electrical modifications to a swing space existing Kitchen to accommodate Owner Provided equipment.
| 04/30/2019 06:00 PM UTC |
|
OSU-180252, Ross - Room H1146 MRI
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, wall demolition, new wall construction, mechanical, electrical, and plumbing work to accommodate new walls. Upgrade of the existing MRI, Primary MEP systems are existing to remain.
| 04/23/2019 06:00 PM UTC |
|
OSU-170011, Fry Hall - Optometry Clinic Entrance - Bid Package #3
Interior renovation to the limited areas of six levels of an existing 6-story academic and office building. Renovations include reconfiguration of office, conference room, and classroom areas, addition and reconfiguration of toilet rooms, and finish improvements. HVAC, lighting, fire protection, and fire alarm upgrades and improvements are included in the areas of renovation. Project is to be completed in three phases with multiple turn over milestones.
| 04/16/2019 06:00 PM UTC |
|
OSU-190132 Civic Space Improvements
This project will improve key gathering, social and study spaces
| 04/09/2019 06:00 PM UTC |
|
OSU-180723, Bradley & Paterson - Entry Hardscape Improvements
This project removes existing improvements around the north entry for Bradley and Paterson Halls and installs new improvements including sidewalk, pavers, seating walls, stairs, seating, plantings, turf, drain basins, lighting modifications, and other restoration items required to complete the work.
| 04/04/2019 06:00 PM UTC |
|
OSU-170816, Campbell - Teaching Kitchen Fire Suppression
OSU Main Campus: The project is a general demolition of an existing 700 plus square foot space previously utilized as a home economics type cooking space. The existing cabinets, ovens, dishwashers, garbage disposals are to be demolished and removed. All existing finishes including ceiling, flooring and walls are to be removed and replaced. The space is to be re-constructed with new casework into a demonstration type teaching kitchen. A new exhaust hood with fire suppression system is to be installed along with new MEP systems in the room as well as new exhaust equipment on the roof. Existing shafts are to be re-used for the exhaust system in the neighboring classroom. Work in the neighboring classroom will need to be completed around the scheduled classroom activities. All new kitchen equipment is to be provided and installed as part of this contract.
| 04/03/2019 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.