OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-190144, Airport - North Runway Rehabilitation Phase 2
OSU Airport: The scope of work for the Base Bid includes items to reconstruct Runway 9L and 27R ends. The work associated with this bid includes, but is not limited to unclassified excavation, placement of crushed aggregate base course, placement of plant mix bituminous pavement, bituminous pavement removal, bituminous surface removal, temporary soil erosion control, permanent erosion control, installation of drainage structures and pipe, and mulched seeding. The scope of work for Alternate Bid 1 includes items required to repair Taxiway G. The work associated with the bid includes but is not limited to microsurfacing of Taxiway G. The scope of work for Alternate Bid 2 includes items required to rehabilitate Taxiway F. The work associated with the bid includes but is not limited to bituminous surface removal, pavement crack repair, placement of plant mix bituminous pavement, temporary soil erosion control, and mulched seeding.
03/01/2019 07:00 PM UTC
OSU-160935, Jameson Crane-Surgical Skills Lab-REBID
REBID: The Surgical Skills Lab consists of fitting out existing shell spaces on the 3rd floor of the Jameson Crane Sports Medicine Institute, totaling approximately 5000 square feet, to accommodate a seven station surgical skills lab and a two station cadaver lab along with related support spaces including locker rooms, toilet rooms, instrument decontamination room, sterile storage and a cadaver storage area with a 20 body refrigerator and freezer.
02/26/2019 07:00 PM UTC
OSU-140056, Wooster Graduate House Phase 1
OSU Wooster: The Project consists of new construction of the Wooster Graduate House Phase 1. The building is two (2) stories above grade and a mechanical basement below grade. Site work and utilities to support the new construction are part of the project. The building consists of a ten (10) bedroom units, four (4) bathrooms, a laundry room, and common living space as well as the internal circulation needed to support the program.
02/22/2019 07:00 PM UTC
OSU-180070, 680 Ackerman - IHC/Histology Lab
Renovation of 680 Ackerman for the relocation of the OSU Wexner Medical Center IHC/Histology Lab.
02/20/2019 07:00 PM UTC
OSU-190049, Newark - Pavement Renovations
Newark Campus: Pavement renovations to include milling, resurface, reconstruction, restriping, and lot reconfigurations requiring new pavement of the Ohio State University and Central Ohio Technical College Newark Campus.
02/19/2019 07:00 PM UTC
OSU-130504, Ohio Union - Infrastructure Upgrades
Ohio Union Ballroom Floor renovation includes foundation modifications and new structural columns on the basement and ground floors respectively. Removal of existing acoustical and gypsum board soffits / ceilings including HVAC ductwork modifications, electrical rework, fire alarm and sprinkler piping modifications.
02/13/2019 07:00 PM UTC
OSU-180173 Building Envelope Renovation FY18
This project will replace or repair aging and/or failing elements of building envelope including windows, curtain walls, roofing, masonry, and water infiltration issues. Exact buildings will be determined during design.
01/22/2019 06:00 PM UTC
OSU-160935, Jameson Crane - Surgical Skills Lab
The Surgical Skills Lab consists of fitting out existing shell spaces on the 3rd floor of the Jameson Crane Sports Medicine Institute, totaling approximately 5000 square feet, to accommodate a seven station surgical skills lab and a two station cadaver lab along with related support spaces including locker rooms, toilet rooms, instrument decontamination room, sterile storage and a cadaver storage area with a 20 body refrigerator and freezer.
01/17/2019 07:00 PM UTC
OSU-170847 TNC Chiller Replacement
This project will replace the chiller.
01/10/2019 07:00 PM UTC
OSU-180524 Northwood & High Chiller Replacement BP 2
This project will install a new chiller on the roof.
01/10/2019 03:00 PM UTC