The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/14/2025 06:00 PM UTC |
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
| 05/20/2025 06:00 PM UTC |
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001
Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
| 05/21/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-150661 Bolz-Central Svc-Window Replacement BP3 Converse Hall
OSU-150661 - Bolz-Central Svc-Window Replacement
Bid Package No.3 Converse Hall
The demolition and hazardous material abatement of the original steel and plate glass window system and wood window units on three levels.
The replacement of windows units. System consists of clear glazing sections with single-hung vinyl windows.
The temporary removal and reattachment of existing window treatments including blinds and shades.
The patching of interior finishes adjacent the replacement window units including painting touch-up, aluminum break metal trim where applicable.
Replacement of existing AC window Units with a standardized unit.
Replacement of gutters and downspouts storm water drainage systems.
Patching and painting of exterior parged concrete, CMU walls, hollow metal doors and frames, and woodwork.
| 02/21/2018 06:00 PM UTC |
OSU-160890, Marion - Electrical, Lighting and HVAC Upgrades (Bid Package #2)
Marion Campus: This project consists of upgrading existing roadway, parking lot, walkway, building mounted, and landscape lighting on the OSU Marion / Marion Technical College Campus to new LED fixtures. This upgrade includes replacing some of the associated light poles as well as controlling all of the new pole mounted lights with the campus's existing lighting control system. The rest of the project scope includes the replacement of a boiler system at the Alber Student Center and the addition of a new air terminal unit (VAV box) at Bryson Hall, Room 199A.
| 02/14/2018 07:00 PM UTC |
OSU-160889, Marion - Asphalt Repair and Replacement
Marion Campus: Repair and replacement of asphalt drives and parking areas throughout the Marion Campus. Alternate 1 will construct a bike path near University Drive and SR 95. Alternate 2 will repair the existing staff parking lot 4. Alternate 3 will remove and replace a portion of the campus loop on the west side. Alternate 4 will remove and replace a portion of the campus loop on the east side. Alternate 5 will construct a pedestrian bridge in the northeastern corner of campus. Alternate 6 will provide unit pricing for a 10’ long 10’ wide bike path. Alternate 7 will expand parking lot 3.
| 02/13/2018 07:00 PM UTC |
OSU-170459 Morehouse Tower - Elevator Upgrades
This project will upgrade and replace elevator controls and cab interiors.
| 02/13/2018 07:00 PM UTC |
OSU-170459 Morehouse Tower - Elevator Upgrades
This project will upgrade and replace elevator controls and cab interiors.
| 02/13/2018 05:00 AM UTC |
OSU-170358, 2001 Polaris Parkway - Molecular Pathology
Build out of existing lab/support space for the 2 story property at 2001 Polaris Parkway, Columbus, OH 43240.
First floor scope: Renovation of approximately 17,000 sf including Molecular Pathology Lab, offices and support spaces. Also included are locker/change room, kitchen/break room and minor restroom/shower upgrades.
Second floor scope: Approximately 11,000 sf for a lactation room upgrade and new electrical drops for systems furniture to accommodate new workstations.
Exterior work is limited to a new egress door in an existing storefront system and associated concrete pad.
| 02/09/2018 06:00 PM UTC |
OSU-140075, Mansfield - Campus Roadway
OSU Mansfield Campus: Mansfield Campus Roadway including approximately 2328 LF of new entry drive, stormwater, shared use path, roadway lighting, traffic signal and other associated work.
| 02/08/2018 07:00 PM UTC |
OSU-150010 Fire System Replacements, Cockins Hall 4th FL Renovation REBID
REBID OSU-150010 - The Project consists of providing a new addressable, manual fire alarm system in Math Building and Cockins Hall, abatement of asbestos containing material and the replacement of those materials in the project buildings, and associated architectural patching and finish work, and the demolition of the existing fire alarm systems in the buildings. The project also includes a complete renovation of the 4th floor of Cockins Hall, including a new HVAC system, electrical upgrades, floor plan changes, and structural steel reinforcement for support of a new fire-rated ceiling.
| 02/08/2018 07:00 PM UTC |
OSU-170578, Mirror Lake Cafe Upgrades
Interior Renovations to the existing Mirror Lake Cafe located in Pomerene Hall: BLDG # 067, 1760 Neil Ave., Columbus, Ohio 43210. Work consists of removal and replacement of casework and misc. finishes, limited new lighting and power, limited plumbing and electrical improvements. Walk-Through cooler.
| 02/06/2018 07:00 PM UTC |
OSU-170872, Morehouse Pavilion-First Floor MRI
Project consists of providing all labor, materials, equipment, with all ways and means necessary to replace the existing MRI equipment with a new equipment manufactured by Siemens Medical Solutions. Work includes but is not limited to removal of existing equipment, removal of existing chiller and piping and installation of new chiller and piping, addition of quench vent cap, partial removal of existing abandoned quench vent, patch and repair as required including roof doghouse, new humidification system, modifications to mechanical and electrical as shown throughout the drawings and specifications.
| 02/01/2018 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.