OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-180360 Vet Med Center Fire Alarm Panel
Replace the (2) existing fire alarm systems in the building with (1) fire alarm system. The existing fire alarm systems are by different manufacturers and cause confusion during alarm. The existing fire alarm systems will be replaced in a manner that minimizes coverage outages, however, fire watch will be required and provided by the University. Existing device locations will generally be reused, and additional devices will be provided to meet current University standards and codes.
01/10/2019 03:00 PM UTC
OSU-160916, Wooster - Selby Hall Cabling
OSU Wooster Campus: The work consists of the removal and replacement of existing teledata cabling in Selby Hall. Related work includes limited hazardous material abatement, a new telecom room, and replacement of ACT tiles in the areas of work. The new telecom room will include HVAC, plumbing, power and lighting modifications required for the construction of this space.
12/17/2018 07:00 PM UTC
OSU-170847 TNC Chiller Repalcement
This project will replace the chiller.
12/12/2018 06:00 PM UTC
OSU-170535, Mansfield - Molyet Village Comm Bldg
One story wood frame 7,383 SF community building located near Molyet Village on the Mansfield campus of the Ohio State University. The project scope includes adjacent site area improvements, foundation and framing and exterior envelope, mechanical, electrical, technology and plumbing systems, fire alarm and fire protection systems, casework, finishes.
12/07/2018 06:00 PM UTC
OSU-160302-BP2 Rhodes - Public Restroom Renovation
Rhodes - Public Restroom Renovation 450 W 10th Avenue, This project will renovate the restrooms in the lobby of Rhodes and the 5th floor atrium in Rhodes.
12/04/2018 07:00 PM UTC
OSU-180474, Rhodes-Doan, ORs and Scrub Rooms (REBID)
This project is a REBID. This project will update various operating rooms and adjacent scrub rooms with new scrub sinks, medical booms, HVAC duct sealing, and the addition of integrated AV equipment to a select group of ORs.
11/28/2018 06:00 PM UTC
OSU-180474 Rhodes-Doan ORs and Scrub Rooms
This project will update various operating rooms and adjacent scrub rooms with new scrub sinks, medical booms, HVAC duct sealing, and the addition of integrated AV equipment to a select group of ORs.
10/31/2018 05:00 PM UTC
OSU-180039, Ag Admin - Restroom Renovations (REBID)
Main Campus: The renovation of approximately 1,676 SF of Restroom space in the Agricultural Administrative Building located at 2120 Fyffe Road, in Columbus, Ohio. The project scope includes rooms 027T, 031T, 038T, 038A, 040T, 100T, 102T and 103T. The new restroom renovations will reconfigure the rooms identified above to include Group and Family Restrooms, and a Wellness Room.
10/30/2018 06:00 PM UTC
OSU-160975 Electrical System Renewal
Orton Hall: Project consists of replacing the existing service entrance switchboard with a new service entrance panelboard, replacing existing distribution panelboards and their feeders, and providing exterior egress lighting. Meiling Hall: Project consists of replacing the existing MCC with a new MCC of the same size, providing emergency egress lighting throughout the building via a new central battery inverter, and replacing existing exit signs and adding new exit signs.
10/11/2018 05:00 PM UTC
OSU-160418 Univeristy Hospital 4th Floor OR Upgrades
This Project will make various upgrades to the OR spaces on the 4th Floor including, repair at rated walls, new rated doors, replacement of ceilings, and sprinkler upgrades.
10/03/2018 05:00 PM UTC