OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190371, MMPP - 3rd Floor Lobby and Clinical Spaces
Remodel 5,783 SF of existing interior space of the 32,820 SF existing 3rd Floor in the Martha Morehouse Pavilion building: Including the renovation of existing areas to create new office space, reception, and waiting area near elevator lobby. Work to include walls, doors, ceilings, finishes and related MEP items. A suite belonging to The Ohio State University.
| 08/26/2019 06:00 PM UTC |
|
OSU-190572, Case Road Animal Facility Relocation
Renovation and improvements of an existing metal storage building structure to house sheep and goats. Renovations include improvements to the existing building, a new Lab and Restroom. There is an alternate for a 1,650 SF mezzanine structure. There are allowances and unit pricing for limited existing metal roof and wall repairs. Existing gutters and downspouts will be removed and replaced. There is limited site and building plumbing work, limited HVAC and electrical work.
| 08/26/2019 06:00 PM UTC |
|
OSU-190513, Vet Med Center - ER Expansion (REBID)
The renovation of two small animal holding wards approximately 680 sf into a new emergency treatment and triage room. Project will install a new entry sliding door and door to dog run, new metal casework, and built ins for owner supplied equipment. New finishes include furred walls, soffits, resinous floor with integrated base and suspended ceiling. Building system alterations include lighting, new plumbing and modifications to the HVAC and medical air.
| 08/23/2019 06:00 PM UTC |
|
201860.00, 1003 Kinnear Road - Roof Replacement
Replacement of existing built up roof with insulated EPDM membrane, including minor metal deck repair, roof top upgrades, & abandoned equipment removal.
| 08/21/2019 06:00 PM UTC |
|
OSU-190078, Central Service - Lock & Key Relocation
Development Lock Shop from the McCracken Power Plant to the basement of the Central Service Building 3,000 GSF. This move will include preparing the Central Service Building basement and first floor rooms 164, 164B, and 164C to be modified to accommodate the FOD Lock Shop’s user needs.
| 08/20/2019 06:00 PM UTC |
|
OSU-160319, Rhodes - Bronchoscopy Procedure Rooms (REBID)
Renovation of 2,003 SF existing 2nd floor of the hospital. Work including demolition, finishes (floor, room base, paint, ceilings), rigid plastic wainscot, corner guards, structural and related MEP items. Work also includes new HVAC for bronch rooms.
| 08/08/2019 06:00 PM UTC |
|
OSU-170509, Doan - Neurodiagnostics Renovation
Renovation of approximately 1,715 SF of office/exam area on the 8th Floor of Doan Hall located at 410 W 10th Avenue, in Columbus, Ohio. The project scope includes corridor X805C, Rooms 802, 804, 805, 806, 807 and 808, 808A, 810, and 810A. The new Office/Exam will contain the following areas: 3 Large Exam Rooms, 1 Small Treatment Room, Staff Area for 7 (to include small kitchenette, team space), Large Storage Room and Work Room (to store office supplies).
| 08/08/2019 06:00 PM UTC |
|
OSU-180809, Doan - 6th and 7th Floor NICU
Doan - 6th & 7th Floor NICU
Renovation of 7,150 square feet of the 54,297 square foot existing 6th Floor, and 3,170 square feet of the 30,465 square foot existing 7th Floor, of Doan Hall on The Ohio State University Medical Center Campus, including walls, doors, ceilings finishes, fire protection, plumbing, mechanical, electrical, data, and security work.
| 08/02/2019 06:00 PM UTC |
|
OSU-190513, Vet Med Center - ER Expansion
The renovation of two small animal holding wards approximately 680 sf into a new emergency treatment and triage room. Project will install a new entry sliding door and door to dog run, new metal casework, and built ins for owner supplied equipment. New finishes include furred walls, soffits, resinous floor with integrated base and suspended ceiling. Building system alterations include lighting, new plumbing and modifications to the HVAC and medical air.
| 08/01/2019 06:00 PM UTC |
|
OSU-190337, Wooster - Campus Parking Improvements
OSU Wooster Campus: Wooster Campus parking improvements project includes 3 priorities, or alternates. Priority #1 is the installation of a new 150 space parking lot and detention basin located just south of Fisher Auditorium. Priority #2 is to mill and fill the existing parking lot north of Fisher Auditorium between Campus Drive and Gerlaugh Drive. Priority #3 is the installation of a concrete sidewalk from the OARDC Administration building down to the intersection of SR 83 and Madison Ave.
| 07/23/2019 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.