The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
| 04/06/2026 06:00 PM UTC |
|
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
| 04/08/2026 06:00 PM UTC |
|
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas
storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
| 04/10/2026 06:00 PM UTC |
|
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
| 04/16/2026 06:02 PM UTC |
|
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
| 04/23/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-170882 Bevis - Boiler Replacement Phase 2
Bevis Hall Boiler Replacement Phase 2
| 03/23/2018 05:00 PM UTC |
|
OSU-170314, Faculty Club - Patio Restoration
Main Campus: Restore the Faculty Club patio with new concrete pavement, stone curb, lighting, fire pits, and landscaping. Alternate 1 will replace deteriorating stone steps and add a new handrail for the steps.
| 03/20/2018 06:00 PM UTC |
|
OSU-170534, Lincoln - Exterior Repairs
Exterior Concrete repairs; removal and replacement of existing concrete coating; removal and replacement of existing joint sealants; spot tuckpointing/repairs to masonry.
| 03/20/2018 02:00 PM UTC |
|
OSU-170752, WHAC - East Wing Renovation
Renovation of a portion of the existing building, construction of an addition, and expansion of the mezzanine into existing high volume spaces. Renovations will include protection, selective demolition, and new construction including but not limited to new structure, roof, walls, doors, finishes, casework, countertops, kitchen equipment, fire suppression, plumbing, fixtures, HVAC, exhaust, lighting, electrical, fire alarm, security and data.
| 03/14/2018 05:00 PM UTC |
|
OSU-170872, Morehouse Pavilion - First Floor MRI (REBID)
Project consists of providing all labor, materials, equipment, with all ways and means necessary to replace the existing MRI equipment with a new equipment manufactured by Siemens Medical Solutions. Work includes but is not limited to removal of existing equipment, removal of existing chiller and piping and installation of new chiller and piping, addition of quench vent cap, partial removal of existing abandoned quench vent, patch and repair as required including roof doghouse, new humidification system, modifications to mechanical and electrical as shown throughout the drawings and specifications.
| 03/13/2018 06:00 PM UTC |
|
OSU-160805 Mendenhall-Indoor Air Quality Improvement
The project consists of the replacement of 27 existing fume hood exhaust fans with 6 new fume hood exhaust fans with high velocity discharge. Existing ductwork will be connected in manifolds to new fans. Existing motor starters will be replaced with new motor starters fed from existing electrical panels.
| 03/13/2018 05:00 PM UTC |
|
OSU-160420, WMC East - West 4th Fl Renovation (REBID 2)
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
Specific Project Experience Requirement: All bidders are required to have previous experience with ICU renovations. All contractors and sub-contractors shall be required to be fully badged prior to commencement of any work. All contractors are subject to rules and regulations set forth by the Wexner Medical Center Standards found in Division 1 of the project manual.
| 03/08/2018 06:00 PM UTC |
|
OSU-160162, Evans - Polymer Synthesis Facility
Main Campus: This project will convert Room 4073 of Evans Laboratory into a Polymer Synthesis Lab.
| 03/07/2018 07:00 PM UTC |
|
OSU-170502 Arnoff - Hotwater Heater Replacement
Base Bid Work consists of replacement of two steam-fired domestic hot water heaters with two gas-fired domestic hot water heaters. This work shall be done without interrupting supply of domestic hot water to the building. Alternate 1 Work consists of providing a desuperheater system to cool superheated steam to saturated temperature for use in autoclaves and condensate pumps. This work
shall be done with minimal interruption of steam supply.
| 03/01/2018 06:00 PM UTC |
|
OSU-180054 Curl Hall - Patio Upgrades
The construction of an outdoor kitchen facility, overhead canopy and Food Service equipment.
| 02/23/2018 03:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.