The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-170533, Lincoln Tower 14th Floor Renovation
Lincoln Tower 14th Floor Renovation
1800 Cannon Drive, Columbus, OH 43210
Complete renovation of the 14th floor of Lincoln Tower.
| 05/15/2018 06:00 PM UTC |
|
OSU-180042 Atwell - Entrance & First Floor Renovation
This project will renovate the first floor entry, lobby, restrooms and corridors.
| 05/08/2018 06:00 PM UTC |
|
OSU-180169, Newark - Campus Boiler Replacements
Newark Campus: Replace the two Kewanee heating hot water (HHW) boilers and make improvements to the HHW pumping and piping arrangement in the boiler room.
| 04/30/2018 06:00 PM UTC |
|
OSU-170233 Riffe - First Floor Renovation
This project will build out shelled space on the 10th and 12th floors to create ICU beds.
| 04/25/2018 06:00 PM UTC |
|
OSU-160920, Kunz-Brundige Franklin County Extension Building
OSU Main Campus: The Kunz-Brundige Franklin County Extension Building will be a newly constructed single-story, 10,475 square foot building located on an agriculture site. It will house offices, a multipurpose room, a gardener’s lab, a demonstration kitchen, pantry, and support spaces. A sloped green roof with deep overhangs will direct storm water runoff to a landscaped basin adjacent to a partially paved parking lot.
| 04/24/2018 06:00 PM UTC |
|
OSU-170619 Dodd Elevator Upgrades
This project will modernize the machinery, controls and cabs for elevators #1, #2 and #3 in Dodd Hall.
| 04/17/2018 06:00 PM UTC |
|
OSU-160530, Rhodes - Fire Alarm
The scope of this project is to replace existing antiquated Autocall and Simplex Grinnell fire alarm system components serving Rhodes hall at the Ohio State University Wexner Medical Center. The primary fire alarm system serving Rhodes hall is a Simplex Grinnell 4100ES system. Existing antiquated system panels, initiating and notification devices connected will be replaced as identified on drawings.
| 04/05/2018 05:00 PM UTC |
|
OSU-180021, WHAC - Indoor Field Roof Replacement
Renovation of a portion of the existing facility roof (indoor practice football field). Renovations will include protection, selective demolition, and new construction including but not limited to roofing materials, gutters/downspouts, metal wall panels, thermal insulation, flashings and sealants, heat trace and lightning protection.
| 04/02/2018 06:00 PM UTC |
|
OSU-170459 Morehouse Tower Elevator Upgrades
This project will upgrade and replace elevator controls and cab interiors.
| 03/29/2018 07:00 PM UTC |
|
OSU-160467, Lincoln Tower - Low Rise Fire Alarm
Fire alarm system modifications and replacement.
| 03/29/2018 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.