The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
| 12/17/2025 07:00 PM UTC |
|
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
| 12/19/2025 07:00 PM UTC |
|
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
| 12/22/2025 07:00 PM UTC |
|
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
| 01/05/2026 07:00 PM UTC |
|
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
| 01/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-170358, 2001 Polaris Parkway - Molecular Pathology
Build out of existing lab/support space for the 2 story property at 2001 Polaris Parkway, Columbus, OH 43240.
First floor scope: Renovation of approximately 17,000 sf including Molecular Pathology Lab, offices and support spaces. Also included are locker/change room, kitchen/break room and minor restroom/shower upgrades.
Second floor scope: Approximately 11,000 sf for a lactation room upgrade and new electrical drops for systems furniture to accommodate new workstations.
Exterior work is limited to a new egress door in an existing storefront system and associated concrete pad.
| 02/09/2018 06:00 PM UTC |
|
OSU-140075, Mansfield - Campus Roadway
OSU Mansfield Campus: Mansfield Campus Roadway including approximately 2328 LF of new entry drive, stormwater, shared use path, roadway lighting, traffic signal and other associated work.
| 02/08/2018 07:00 PM UTC |
|
OSU-150010 Fire System Replacements, Cockins Hall 4th FL Renovation REBID
REBID OSU-150010 - The Project consists of providing a new addressable, manual fire alarm system in Math Building and Cockins Hall, abatement of asbestos containing material and the replacement of those materials in the project buildings, and associated architectural patching and finish work, and the demolition of the existing fire alarm systems in the buildings. The project also includes a complete renovation of the 4th floor of Cockins Hall, including a new HVAC system, electrical upgrades, floor plan changes, and structural steel reinforcement for support of a new fire-rated ceiling.
| 02/08/2018 07:00 PM UTC |
|
OSU-170578, Mirror Lake Cafe Upgrades
Interior Renovations to the existing Mirror Lake Cafe located in Pomerene Hall: BLDG # 067, 1760 Neil Ave., Columbus, Ohio 43210. Work consists of removal and replacement of casework and misc. finishes, limited new lighting and power, limited plumbing and electrical improvements. Walk-Through cooler.
| 02/06/2018 07:00 PM UTC |
|
OSU-170872, Morehouse Pavilion-First Floor MRI
Project consists of providing all labor, materials, equipment, with all ways and means necessary to replace the existing MRI equipment with a new equipment manufactured by Siemens Medical Solutions. Work includes but is not limited to removal of existing equipment, removal of existing chiller and piping and installation of new chiller and piping, addition of quench vent cap, partial removal of existing abandoned quench vent, patch and repair as required including roof doghouse, new humidification system, modifications to mechanical and electrical as shown throughout the drawings and specifications.
| 02/01/2018 07:00 PM UTC |
|
OSU-160420, WMC East - West 4th Fl Renovation (REBID)
This project is a Re-Bid. Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
| 02/01/2018 06:00 PM UTC |
|
OSU-160892, Marion - Morrill Hall 3rd Floor Renovation
OSU Marion Campus: The project scope includes the renovation of the third floor of Marion-Morrill Hall. The peroject will renovate 19,100 SF for new faculty offices, classroom spaces, and student spaces. Existing partitions, doors, finishes, ceilings, and MEP systems will be removed.
| 01/31/2018 07:00 PM UTC |
|
OSU-170647, Rhodes - Room M212E Modifications
Renovation of existing MRI room. Project includes replacing existing MRI equipment with new through a removable access panel in the existing exterior wall, room finish upgrades, and repair/modifications to the existing RF shielding to coordinate with new equipment.
| 01/18/2018 07:00 PM UTC |
|
OSU-160147 James Door Operators
This project will reconfigure approximately 50 door operators that continue to function when the fire alarm system is activated.
| 01/16/2018 06:00 PM UTC |
|
OSU-170391 Transportation Plan Implementation BP6
This project installs a concrete entry drive connector from John H. Herrick Drive to the loading dock of Biomedical Research Tower. Concrete curb, pavement striping, partial free standing wall removal, modifications to wall face brick, tree relocation, turf restoration, and other restoration items are part of the work.
| 01/10/2018 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.