General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
10/01/2026 06:00 PM UTC
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
10/01/2026 06:00 PM UTC
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included. All noisy work is to occur after normal operating hours.
10/06/2026 06:00 PM UTC
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms 670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
10/08/2026 06:00 PM UTC
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
10/12/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-160980 Plumbing System Replacement BP 2
This project will replace deteriorating plumbing systems.
07/11/2019 05:00 PM UTC
OSU-180910, Child Care Center - Chiller Replacement
OSU Columbus Campus: Replace chiller, condenser, refrigerant piping and provide refrigerant alarm system and components.
06/06/2019 06:00 PM UTC
OSU-170318, Rhodes - ADA Restrooms
Renovation - 6 public / 12 patient restrooms and adjacent offices / storage spaces on Rhodes Hall floors 7, 9, 8, 10 and 11. Work is within The Ohio State University Wexner Medical Center.
06/04/2019 06:00 PM UTC
OSU-180168 - Ackerman Gateway
This project will establish upgrades to the intersection of Fred Taylor & Ackerman Rd.
05/16/2019 06:30 PM UTC
OSU-190183, Arps - Suite 172 Renovation
Columbus Campus: Work limited to suite entrances, four offices, conference room, reception, common area, copy room and storage areas on Arps Hall first floor. Work includes new partition walls, doors, ceilings, lighting and finishes.
05/08/2019 06:00 PM UTC
OSU-170840, Dodd - Hospitality Center
Renovation of a 1400 SF finishing kitchen including new finishes, new lighting, modifications to HVAC, Plumbing, and FA, FS. Electrical modifications to a swing space existing Kitchen to accommodate Owner Provided equipment.
04/30/2019 06:00 PM UTC
OSU-180252, Ross - Room H1146 MRI
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, wall demolition, new wall construction, mechanical, electrical, and plumbing work to accommodate new walls. Upgrade of the existing MRI, Primary MEP systems are existing to remain.
04/23/2019 06:00 PM UTC
OSU-170011, Fry Hall - Optometry Clinic Entrance - Bid Package #3
Interior renovation to the limited areas of six levels of an existing 6-story academic and office building. Renovations include reconfiguration of office, conference room, and classroom areas, addition and reconfiguration of toilet rooms, and finish improvements. HVAC, lighting, fire protection, and fire alarm upgrades and improvements are included in the areas of renovation. Project is to be completed in three phases with multiple turn over milestones.
04/16/2019 06:00 PM UTC
OSU-190132 Civic Space Improvements
This project will improve key gathering, social and study spaces
04/09/2019 06:00 PM UTC
OSU-180723, Bradley & Paterson - Entry Hardscape Improvements
This project removes existing improvements around the north entry for Bradley and Paterson Halls and installs new improvements including sidewalk, pavers, seating walls, stairs, seating, plantings, turf, drain basins, lighting modifications, and other restoration items required to complete the work.
04/04/2019 06:00 PM UTC
411 - 420 of 643 Solicitations
1 2 … 38 39 40 42 44 45 46 … 64 65