General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-160793 Parks-Pharmacy Practice Lab
Renovation of labs 233, 233A, 233C, 233E, 241, 243, 243A, and 246 on the second floor of Parks Hall into Pharmacy Practice Labs, plus renovations of corridors X207C and X208C.
05/30/2018 06:00 PM UTC
OSU-170533, Lincoln Tower 14th Floor Renovation
Lincoln Tower 14th Floor Renovation 1800 Cannon Drive, Columbus, OH 43210 Complete renovation of the 14th floor of Lincoln Tower.
05/15/2018 06:00 PM UTC
OSU-180042 Atwell - Entrance & First Floor Renovation
This project will renovate the first floor entry, lobby, restrooms and corridors.
05/08/2018 06:00 PM UTC
OSU-180169, Newark - Campus Boiler Replacements
Newark Campus: Replace the two Kewanee heating hot water (HHW) boilers and make improvements to the HHW pumping and piping arrangement in the boiler room.
04/30/2018 06:00 PM UTC
OSU-170233 Riffe - First Floor Renovation
This project will build out shelled space on the 10th and 12th floors to create ICU beds.
04/25/2018 06:00 PM UTC
OSU-160920, Kunz-Brundige Franklin County Extension Building
OSU Main Campus: The Kunz-Brundige Franklin County Extension Building will be a newly constructed single-story, 10,475 square foot building located on an agriculture site. It will house offices, a multipurpose room, a gardener’s lab, a demonstration kitchen, pantry, and support spaces. A sloped green roof with deep overhangs will direct storm water runoff to a landscaped basin adjacent to a partially paved parking lot.
04/24/2018 06:00 PM UTC
OSU-170619 Dodd Elevator Upgrades
This project will modernize the machinery, controls and cabs for elevators #1, #2 and #3 in Dodd Hall.
04/17/2018 06:00 PM UTC
OSU-160530, Rhodes - Fire Alarm
The scope of this project is to replace existing antiquated Autocall and Simplex Grinnell fire alarm system components serving Rhodes hall at the Ohio State University Wexner Medical Center. The primary fire alarm system serving Rhodes hall is a Simplex Grinnell 4100ES system. Existing antiquated system panels, initiating and notification devices connected will be replaced as identified on drawings.
04/05/2018 05:00 PM UTC
OSU-180021, WHAC - Indoor Field Roof Replacement
Renovation of a portion of the existing facility roof (indoor practice football field). Renovations will include protection, selective demolition, and new construction including but not limited to roofing materials, gutters/downspouts, metal wall panels, thermal insulation, flashings and sealants, heat trace and lightning protection.
04/02/2018 06:00 PM UTC
OSU-170459 Morehouse Tower Elevator Upgrades
This project will upgrade and replace elevator controls and cab interiors.
03/29/2018 07:00 PM UTC
411 - 420 of 593 Solicitations
1 2 38 39 40 42 44 45 46 59 60