General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-180173 Building Envelope Renovation FY18
This project will replace or repair aging and/or failing elements of building envelope including windows, curtain walls, roofing, masonry, and water infiltration issues. Exact buildings will be determined during design.
01/22/2019 06:00 PM UTC
OSU-160935, Jameson Crane - Surgical Skills Lab
The Surgical Skills Lab consists of fitting out existing shell spaces on the 3rd floor of the Jameson Crane Sports Medicine Institute, totaling approximately 5000 square feet, to accommodate a seven station surgical skills lab and a two station cadaver lab along with related support spaces including locker rooms, toilet rooms, instrument decontamination room, sterile storage and a cadaver storage area with a 20 body refrigerator and freezer.
01/17/2019 07:00 PM UTC
OSU-170847 TNC Chiller Replacement
This project will replace the chiller.
01/10/2019 07:00 PM UTC
OSU-180524 Northwood & High Chiller Replacement BP 2
This project will install a new chiller on the roof.
01/10/2019 03:00 PM UTC
OSU-180360 Vet Med Center Fire Alarm Panel
Replace the (2) existing fire alarm systems in the building with (1) fire alarm system. The existing fire alarm systems are by different manufacturers and cause confusion during alarm. The existing fire alarm systems will be replaced in a manner that minimizes coverage outages, however, fire watch will be required and provided by the University. Existing device locations will generally be reused, and additional devices will be provided to meet current University standards and codes.
01/10/2019 03:00 PM UTC
OSU-160916, Wooster - Selby Hall Cabling
OSU Wooster Campus: The work consists of the removal and replacement of existing teledata cabling in Selby Hall. Related work includes limited hazardous material abatement, a new telecom room, and replacement of ACT tiles in the areas of work. The new telecom room will include HVAC, plumbing, power and lighting modifications required for the construction of this space.
12/17/2018 07:00 PM UTC
OSU-170847 TNC Chiller Repalcement
This project will replace the chiller.
12/12/2018 06:00 PM UTC
OSU-170535, Mansfield - Molyet Village Comm Bldg
One story wood frame 7,383 SF community building located near Molyet Village on the Mansfield campus of the Ohio State University. The project scope includes adjacent site area improvements, foundation and framing and exterior envelope, mechanical, electrical, technology and plumbing systems, fire alarm and fire protection systems, casework, finishes.
12/07/2018 06:00 PM UTC
OSU-160302-BP2 Rhodes - Public Restroom Renovation
Rhodes - Public Restroom Renovation 450 W 10th Avenue, This project will renovate the restrooms in the lobby of Rhodes and the 5th floor atrium in Rhodes.
12/04/2018 07:00 PM UTC
OSU-180474, Rhodes-Doan, ORs and Scrub Rooms (REBID)
This project is a REBID. This project will update various operating rooms and adjacent scrub rooms with new scrub sinks, medical booms, HVAC duct sealing, and the addition of integrated AV equipment to a select group of ORs.
11/28/2018 06:00 PM UTC
411 - 420 of 622 Solicitations