General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/14/2025 06:00 PM UTC
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
05/20/2025 06:00 PM UTC
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001 Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
05/21/2025 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-160980 Plumbing System Replacement
The project consists of the investigation of approximately 88 existing sanitary stacks to determine condition of existing piping. The project includes recording the pipe interiors via video camera, with removal of existing blockages where found. At some locations containing multiple stacks, the stacks will be combined into a single branch to the main in the tunnel. The project includes abatement of hazardous material
10/20/2017 05:00 PM UTC
OSU-160976 Elevator Safety Repairs and Replacements Phase 2
Elevator Modernization and related architectural and MEP scopes of work for a total of 8 elevators in 6 buildings on OSU’s Main Campus: Newton Hall Journalism Building 33 W. 11th Ave. Enarson Hall Arps Hall Drinko Hall
10/17/2017 06:00 PM UTC
OSU-160774 Drackett - Corridor Ceilings (RE-BID)
Installation of lay-in ceiling system and lights.
10/13/2017 06:00 PM UTC
OSU-160936, Mansfield - Conard 2nd Floor Renovation
OSU Mansfield Campus: The work consists of the renovation of approximately 7000 square feet of teaching lab, lab prep, lab storage, research lab and lounge areas in the second floor of Conard Hall.
10/02/2017 05:00 PM UTC
OSU-160929, Lima - Standby Generators
OSU Lima Campus: This project consists of providing new generators, associated automatic transfer switches, and life safety system upgrades for Galvin Hall and the Student Services building. The project will include all plumbing work required for the electrical scope to be completed.
09/28/2017 06:00 PM UTC
OSU-160240 Building Identification Sign Replacement BP2
Bid Package No.2 Replacement, refurbishment or new fabrication and installation of building identification free-standing signs, wall-mounted and vinyl-applied signs. Signs vary in scale, type and composition. Refer to Sign Types in Contract Documents. Restoration of landscaping elements surrounding new, replacement or refurbished signs including, but not limited to pavers, asphalt, mulch beds and grass. Demolition and proper disposal of signs, posts and concrete bases. If sign is not replaced, fill holes left by base removal and patch according to surrounding landscape
09/26/2017 06:30 PM UTC
OSU-160911, CFAES Lab and Office Renovations
OSU Main Campus: Work includes renovation to the Agriculture Administration Building and to Howlett Hall. Work within the Agriculture Admin Building can be characterized best as “office” and work within Howlett can be characterized as “lab”.
09/20/2017 06:00 PM UTC
OSU-160633 Taylor Tower - Boiler Replacements Bid Package 2
This project consists of the replacement of 2 domestic Hot Water Storage Tanks on the 14th floor of Jones Tower with 6 new tanks, and the installation of a new thermostatic mixing valve to limit domestic hot water supply temperature distributed to the building.
09/19/2017 06:00 PM UTC
OSU-160914, Wooster - Pounden FAHRP Discovery Theme Space
OSU-Wooster: The work includes but is not limited to the interior buildout of approximately 925 S.F. of existing shell space located in the first floor of Pounden hall into new research space. The project will include a larger lab and a smaller cell culture lab within the 925 S.F. space. The Work will include general trades, mechanical, electrical, plumbing, fire protection and communications work. The existing adjacent areas shall remain in operation throughout the Project.
09/13/2017 05:00 PM UTC
OSU-170173 1165 Kinnear - Staff Renovation
This project will relocate staff from the Laundry Building and Service Annex to 1165 Kinnear Rd.
09/07/2017 05:00 PM UTC
431 - 440 of 558 Solicitations
1 2 40 41 42 44 46 47 48 55 56