The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-150403
University Hospital - Relocate Surgical Pathology Phase II
| 07/18/2018 05:30 PM UTC |
|
OSU-150572 Psychology - Envelope Repair
1835 Neil Avenue, Columbus
Restore the original design intent of the exterior envelope of the Psychology Building by removing and reinstalling the existing Centria Insulated Metal Panel cladding. Prior to reinstalling, additional measures including, but not limited to, roofing termination repairs, firestopping repairs, and flashing and substrate modifications will be implemented to maintain the air and watertightness of the exterior envelope.
| 07/18/2018 05:00 PM UTC |
|
OSU-170535, Mansfield - Molyet Village Comm Bldg
One story wood frame 7,583 SF community building located near Molyet Village on the Mansfield campus of The Ohio State University. The project scope includes adjacent site area improvements, foundation and framing and exterior envelope, mechanical, electrical, technology and plumbing systems, fire alarm and fire protection systems, casework, finishes.
| 07/11/2018 06:00 PM UTC |
|
OSU-170533, Lincoln Tower 14th Floor Renovation (REBID)
Lincoln Tower 14th Floor Renovation REBID
1800 Cannon Drive, Columbus, OH 43210
Complete renovation of the 14th floor of Lincoln Tower.
| 06/29/2018 06:00 PM UTC |
|
OSU-160010 - REBID Harding 5th Floor Renovations
The Ohio State University - Harding Hospital: This project will convert sapce on the fifth floor to private inpatient beds.
| 06/20/2018 06:00 PM UTC |
|
OSU-180019, Nicklaus Museum - 2nd Floor Renovation
Nicklaus Museum 2nd Floor Renovation includes the alterations for new building entry door within an existing exterior egress door/stairway and the construction of new second floor offices, video studio, toilet and storage rooms.
| 06/14/2018 06:00 PM UTC |
|
OSU-160982 Roof Repair and Replacements Ph 2
Roof repairs and replacements at (04) locations:
• 1100 Kinnear
• Service Building Annex CABS Bus Garage
• Enarson Classroom Building
• Central Service Building
| 06/14/2018 05:00 PM UTC |
|
OSU-160340, Vet Hospital - Expand Oncology (REBID)
Renovation of the existing Veterinary Oncology Suite on the ground floor of the OSU Veterinary Hospital. The project includes demolition of existing walls, ceilings and finishes; new walls, doors, millwork, ceilings, lighting, finishes, electrical and HVAC work.
| 06/11/2018 06:00 PM UTC |
|
OSU-150019, Wooster Farm Operations Improvements (REBID)
Wooster Campus: Project includes new construction of the Centralized Farm Operations Facility and the Grace Drake Learning Laboratory Facility. New work includes new structures, slabs, roofs, exterior facades, interior work, mechanical, electric, pluming, and site. Refer to project narratives for further descriptions.
| 06/05/2018 06:00 PM UTC |
|
OSU-160793 Parks-Pharmacy Practice Lab
Renovation of labs 233, 233A, 233C, 233E, 241, 243, 243A, and 246 on the second floor of Parks Hall into Pharmacy Practice Labs, plus renovations of corridors X207C and X208C.
| 05/30/2018 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.