The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
| 04/06/2026 06:00 PM UTC |
|
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
| 04/08/2026 06:00 PM UTC |
|
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas
storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
| 04/10/2026 06:00 PM UTC |
|
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
| 04/16/2026 06:02 PM UTC |
|
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
| 04/23/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-160920, Kunz-Brundige Franklin County Extension Building
OSU Main Campus: The Kunz-Brundige Franklin County Extension Building will be a newly constructed single-story, 10,475 square foot building located on an agriculture site. It will house offices, a multipurpose room, a gardener’s lab, a demonstration kitchen, pantry, and support spaces. A sloped green roof with deep overhangs will direct storm water runoff to a landscaped basin adjacent to a partially paved parking lot.
| 04/24/2018 06:00 PM UTC |
|
OSU-170619 Dodd Elevator Upgrades
This project will modernize the machinery, controls and cabs for elevators #1, #2 and #3 in Dodd Hall.
| 04/17/2018 06:00 PM UTC |
|
OSU-160530, Rhodes - Fire Alarm
The scope of this project is to replace existing antiquated Autocall and Simplex Grinnell fire alarm system components serving Rhodes hall at the Ohio State University Wexner Medical Center. The primary fire alarm system serving Rhodes hall is a Simplex Grinnell 4100ES system. Existing antiquated system panels, initiating and notification devices connected will be replaced as identified on drawings.
| 04/05/2018 05:00 PM UTC |
|
OSU-180021, WHAC - Indoor Field Roof Replacement
Renovation of a portion of the existing facility roof (indoor practice football field). Renovations will include protection, selective demolition, and new construction including but not limited to roofing materials, gutters/downspouts, metal wall panels, thermal insulation, flashings and sealants, heat trace and lightning protection.
| 04/02/2018 06:00 PM UTC |
|
OSU-170459 Morehouse Tower Elevator Upgrades
This project will upgrade and replace elevator controls and cab interiors.
| 03/29/2018 07:00 PM UTC |
|
OSU-160467, Lincoln Tower - Low Rise Fire Alarm
Fire alarm system modifications and replacement.
| 03/29/2018 05:00 PM UTC |
|
OSU-150019, Wooster Farm Operations Improvements
Wooster Campus: Project includes new construction of the Centralized Farm Operations Facility and the Grace Drake Learning Laboratory Facility. New work includes new structures, slabs, roofs, exterior facades, interior work, mechanical, electric, pluming, and site. Refer to project narratives for further descriptions.
| 03/28/2018 06:00 PM UTC |
|
OSU-160340, Vet Hospital - Expand Oncology
Renovation of the existing Veterinary Oncology Suite on the ground floor of the OSU Veterinary Hospital. The project includes demolition of existing walls, ceilings and finishes; new walls, doors, millwork, ceilings, lighting, finishes, electrical and HVAC work.
| 03/27/2018 06:00 PM UTC |
|
OSU-170651, McPherson - Lecture Hall Renovations
Renovation of lecture halls 1000 & 1015 of McPherson Chemical Laboratory. Work includes selective demolition, new walls, concrete and steel structures, doors, frames, and door hardware, finishes (including flooring, room base, paint, acoustical wall panels and acoustical ceilings), millwork, miscellaneous metals, glazing, mechanical, electrical and technology.
| 03/26/2018 06:00 PM UTC |
|
OSU-160933, Newark - Campus Infrastructure
Newark Campus: Project consists of the replacement of existing HSP roadway, parking lot and sidewalk light fixtures with new LED fixtures. The project also includes scope to provide natural gas emergency generator for Reese Center.
| 03/23/2018 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.