General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-160805 Mendenhall-Indoor Air Quality Improvement
The project consists of the replacement of 27 existing fume hood exhaust fans with 6 new fume hood exhaust fans with high velocity discharge. Existing ductwork will be connected in manifolds to new fans. Existing motor starters will be replaced with new motor starters fed from existing electrical panels.
03/13/2018 05:00 PM UTC
OSU-160420, WMC East - West 4th Fl Renovation (REBID 2)
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain. Specific Project Experience Requirement: All bidders are required to have previous experience with ICU renovations. All contractors and sub-contractors shall be required to be fully badged prior to commencement of any work. All contractors are subject to rules and regulations set forth by the Wexner Medical Center Standards found in Division 1 of the project manual.
03/08/2018 06:00 PM UTC
OSU-160162, Evans - Polymer Synthesis Facility
Main Campus: This project will convert Room 4073 of Evans Laboratory into a Polymer Synthesis Lab.
03/07/2018 07:00 PM UTC
OSU-170502 Arnoff - Hotwater Heater Replacement
Base Bid Work consists of replacement of two steam-fired domestic hot water heaters with two gas-fired domestic hot water heaters. This work shall be done without interrupting supply of domestic hot water to the building. Alternate 1 Work consists of providing a desuperheater system to cool superheated steam to saturated temperature for use in autoclaves and condensate pumps. This work shall be done with minimal interruption of steam supply.
03/01/2018 06:00 PM UTC
OSU-180054 Curl Hall - Patio Upgrades
The construction of an outdoor kitchen facility, overhead canopy and Food Service equipment.
02/23/2018 03:00 PM UTC
OSU-150661 Bolz-Central Svc-Window Replacement BP3 Converse Hall
OSU-150661 - Bolz-Central Svc-Window Replacement Bid Package No.3 Converse Hall The demolition and hazardous material abatement of the original steel and plate glass window system and wood window units on three levels. The replacement of windows units. System consists of clear glazing sections with single-hung vinyl windows. The temporary removal and reattachment of existing window treatments including blinds and shades. The patching of interior finishes adjacent the replacement window units including painting touch-up, aluminum break metal trim where applicable. Replacement of existing AC window Units with a standardized unit. Replacement of gutters and downspouts storm water drainage systems. Patching and painting of exterior parged concrete, CMU walls, hollow metal doors and frames, and woodwork.
02/21/2018 06:00 PM UTC
OSU-160890, Marion - Electrical, Lighting and HVAC Upgrades (Bid Package #2)
Marion Campus: This project consists of upgrading existing roadway, parking lot, walkway, building mounted, and landscape lighting on the OSU Marion / Marion Technical College Campus to new LED fixtures. This upgrade includes replacing some of the associated light poles as well as controlling all of the new pole mounted lights with the campus's existing lighting control system. The rest of the project scope includes the replacement of a boiler system at the Alber Student Center and the addition of a new air terminal unit (VAV box) at Bryson Hall, Room 199A.
02/14/2018 07:00 PM UTC
OSU-160889, Marion - Asphalt Repair and Replacement
Marion Campus: Repair and replacement of asphalt drives and parking areas throughout the Marion Campus. Alternate 1 will construct a bike path near University Drive and SR 95. Alternate 2 will repair the existing staff parking lot 4. Alternate 3 will remove and replace a portion of the campus loop on the west side. Alternate 4 will remove and replace a portion of the campus loop on the east side. Alternate 5 will construct a pedestrian bridge in the northeastern corner of campus. Alternate 6 will provide unit pricing for a 10’ long 10’ wide bike path. Alternate 7 will expand parking lot 3.
02/13/2018 07:00 PM UTC
OSU-170459 Morehouse Tower - Elevator Upgrades
This project will upgrade and replace elevator controls and cab interiors.
02/13/2018 07:00 PM UTC
OSU-170459 Morehouse Tower - Elevator Upgrades
This project will upgrade and replace elevator controls and cab interiors.
02/13/2018 05:00 AM UTC
431 - 440 of 593 Solicitations
1 2 40 41 42 44 46 47 48 59 60