The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-170816, Campbell - Teaching Kitchen Fire Suppression
OSU Main Campus: The project is a general demolition of an existing 700 plus square foot space previously utilized as a home economics type cooking space. The existing cabinets, ovens, dishwashers, garbage disposals are to be demolished and removed. All existing finishes including ceiling, flooring and walls are to be removed and replaced. The space is to be re-constructed with new casework into a demonstration type teaching kitchen. A new exhaust hood with fire suppression system is to be installed along with new MEP systems in the room as well as new exhaust equipment on the roof. Existing shafts are to be re-used for the exhaust system in the neighboring classroom. Work in the neighboring classroom will need to be completed around the scheduled classroom activities. All new kitchen equipment is to be provided and installed as part of this contract.
| 04/03/2019 06:00 PM UTC |
|
OSU-160319, Rhodes - Bronchoscopy Procedure Rooms
RENOVATION OF 2,003 SF EXISTING 2ND FLOOR OF THE HOSPITAL. WORK INCLUDING DEMOLITION, FINISHES (FLOOR, ROOM BASE, PAINT, CEILINGS), RIGID PLASTIC WAINSCOT, CORNER GUARDS, STRUCTURAL AND RELATED MEP ITEMS. WORK ALSO INCLUDES NEW HVAC FOR BRONCH ROOMS.
| 03/28/2019 06:00 PM UTC |
|
OSU-190063 Arwell Chiller Replacement
The Project consists of replacement of a nominal 350 ton water-cooled centrifugal chiller with a new unit of the same capacity. Existing pumps and cooling tower to remain. The University has pre-purchased the chiller for installation by the contractor. Project includes enlarging an existing wall opening to get new chiller into the
Penthouse.
| 03/20/2019 06:00 PM UTC |
|
OSU-190194, Drinko - Saxbe Auditorium Renovation
OSU Main Campus: Interior renovation of the existing auditorium to meet the current needs of the college. New seating, accessibility modifications, and revised mechanical, electrical, and technology systems associated with the renovation.
| 03/14/2019 06:00 PM UTC |
|
OSU-180784, Lima - Campus Paving Improvements
OSU Lima: Replace Parking Lot C at OSU Lima Campus by process of reclaiming asphalt base. Alternate 1 will include full depth asphalt replacement in Parking Lot C in lieu of reclaiming asphalt base per base bid. Alternate 2 will include improvements to the Public Service Building Entry. Alternate 3 will include removal and replacement of the drive connecting Parking Lot C and Parking Lot A. Alternate 4 will include pavement repair in Parking Lot A.
| 03/05/2019 07:00 PM UTC |
|
OSU-190144, Airport - North Runway Rehabilitation Phase 2
OSU Airport: The scope of work for the Base Bid includes items to reconstruct Runway 9L and 27R ends. The work associated with this bid includes, but is not limited to unclassified excavation, placement of crushed aggregate base course, placement of plant mix bituminous pavement, bituminous pavement removal, bituminous surface removal, temporary soil erosion control, permanent erosion control, installation of drainage structures and pipe, and mulched seeding.
The scope of work for Alternate Bid 1 includes items required to repair Taxiway G. The work associated with the bid includes but is not limited to microsurfacing of Taxiway G.
The scope of work for Alternate Bid 2 includes items required to rehabilitate Taxiway F. The work associated with the bid includes but is not limited to bituminous surface removal, pavement crack repair, placement of plant mix bituminous pavement, temporary soil erosion control, and mulched seeding.
| 03/01/2019 07:00 PM UTC |
|
OSU-160935, Jameson Crane-Surgical Skills Lab-REBID
REBID: The Surgical Skills Lab consists of fitting out existing shell spaces on the 3rd floor of the Jameson Crane Sports Medicine Institute, totaling approximately 5000 square feet, to accommodate a seven station surgical skills lab and a two station cadaver lab along with related support spaces including locker rooms, toilet rooms, instrument decontamination room, sterile storage and a cadaver storage area with a 20 body refrigerator and freezer.
| 02/26/2019 07:00 PM UTC |
|
OSU-140056, Wooster Graduate House Phase 1
OSU Wooster: The Project consists of new construction of the Wooster Graduate House Phase 1. The building is two (2) stories above grade and a mechanical basement below grade. Site work and utilities to support the new construction are part of the project. The building consists of a ten (10) bedroom units, four (4) bathrooms, a laundry room, and common living space as well as the internal circulation needed to support the program.
| 02/22/2019 07:00 PM UTC |
|
OSU-180070, 680 Ackerman - IHC/Histology Lab
Renovation of 680 Ackerman for the relocation of the OSU Wexner Medical Center IHC/Histology Lab.
| 02/20/2019 07:00 PM UTC |
|
OSU-190049, Newark - Pavement Renovations
Newark Campus: Pavement renovations to include milling, resurface, reconstruction, restriping, and lot reconfigurations requiring new pavement of the Ohio State University and Central Ohio Technical College Newark Campus.
| 02/19/2019 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.