The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
| 12/17/2025 07:00 PM UTC |
|
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
| 12/19/2025 07:00 PM UTC |
|
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
| 12/22/2025 07:00 PM UTC |
|
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
| 01/05/2026 07:00 PM UTC |
|
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
| 01/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-160467, Lincoln Tower - Low Rise Fire Alarm
Fire alarm system modifications and replacement.
| 03/29/2018 05:00 PM UTC |
|
OSU-150019, Wooster Farm Operations Improvements
Wooster Campus: Project includes new construction of the Centralized Farm Operations Facility and the Grace Drake Learning Laboratory Facility. New work includes new structures, slabs, roofs, exterior facades, interior work, mechanical, electric, pluming, and site. Refer to project narratives for further descriptions.
| 03/28/2018 06:00 PM UTC |
|
OSU-160340, Vet Hospital - Expand Oncology
Renovation of the existing Veterinary Oncology Suite on the ground floor of the OSU Veterinary Hospital. The project includes demolition of existing walls, ceilings and finishes; new walls, doors, millwork, ceilings, lighting, finishes, electrical and HVAC work.
| 03/27/2018 06:00 PM UTC |
|
OSU-170651, McPherson - Lecture Hall Renovations
Renovation of lecture halls 1000 & 1015 of McPherson Chemical Laboratory. Work includes selective demolition, new walls, concrete and steel structures, doors, frames, and door hardware, finishes (including flooring, room base, paint, acoustical wall panels and acoustical ceilings), millwork, miscellaneous metals, glazing, mechanical, electrical and technology.
| 03/26/2018 06:00 PM UTC |
|
OSU-160933, Newark - Campus Infrastructure
Newark Campus: Project consists of the replacement of existing HSP roadway, parking lot and sidewalk light fixtures with new LED fixtures. The project also includes scope to provide natural gas emergency generator for Reese Center.
| 03/23/2018 06:00 PM UTC |
|
OSU-170882 Bevis - Boiler Replacement Phase 2
Bevis Hall Boiler Replacement Phase 2
| 03/23/2018 05:00 PM UTC |
|
OSU-170314, Faculty Club - Patio Restoration
Main Campus: Restore the Faculty Club patio with new concrete pavement, stone curb, lighting, fire pits, and landscaping. Alternate 1 will replace deteriorating stone steps and add a new handrail for the steps.
| 03/20/2018 06:00 PM UTC |
|
OSU-170534, Lincoln - Exterior Repairs
Exterior Concrete repairs; removal and replacement of existing concrete coating; removal and replacement of existing joint sealants; spot tuckpointing/repairs to masonry.
| 03/20/2018 02:00 PM UTC |
|
OSU-170752, WHAC - East Wing Renovation
Renovation of a portion of the existing building, construction of an addition, and expansion of the mezzanine into existing high volume spaces. Renovations will include protection, selective demolition, and new construction including but not limited to new structure, roof, walls, doors, finishes, casework, countertops, kitchen equipment, fire suppression, plumbing, fixtures, HVAC, exhaust, lighting, electrical, fire alarm, security and data.
| 03/14/2018 05:00 PM UTC |
|
OSU-170872, Morehouse Pavilion - First Floor MRI (REBID)
Project consists of providing all labor, materials, equipment, with all ways and means necessary to replace the existing MRI equipment with a new equipment manufactured by Siemens Medical Solutions. Work includes but is not limited to removal of existing equipment, removal of existing chiller and piping and installation of new chiller and piping, addition of quench vent cap, partial removal of existing abandoned quench vent, patch and repair as required including roof doghouse, new humidification system, modifications to mechanical and electrical as shown throughout the drawings and specifications.
| 03/13/2018 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.