General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-160010 - REBID Harding 5th Floor Renovations
The Ohio State University - Harding Hospital: This project will convert sapce on the fifth floor to private inpatient beds.
06/20/2018 06:00 PM UTC
OSU-180019, Nicklaus Museum - 2nd Floor Renovation
Nicklaus Museum 2nd Floor Renovation includes the alterations for new building entry door within an existing exterior egress door/stairway and the construction of new second floor offices, video studio, toilet and storage rooms.
06/14/2018 06:00 PM UTC
OSU-160982 Roof Repair and Replacements Ph 2
Roof repairs and replacements at (04) locations: • 1100 Kinnear • Service Building Annex CABS Bus Garage • Enarson Classroom Building • Central Service Building
06/14/2018 05:00 PM UTC
OSU-160340, Vet Hospital - Expand Oncology (REBID)
Renovation of the existing Veterinary Oncology Suite on the ground floor of the OSU Veterinary Hospital. The project includes demolition of existing walls, ceilings and finishes; new walls, doors, millwork, ceilings, lighting, finishes, electrical and HVAC work.
06/11/2018 06:00 PM UTC
OSU-150019, Wooster Farm Operations Improvements (REBID)
Wooster Campus: Project includes new construction of the Centralized Farm Operations Facility and the Grace Drake Learning Laboratory Facility. New work includes new structures, slabs, roofs, exterior facades, interior work, mechanical, electric, pluming, and site. Refer to project narratives for further descriptions.
06/05/2018 06:00 PM UTC
OSU-160793 Parks-Pharmacy Practice Lab
Renovation of labs 233, 233A, 233C, 233E, 241, 243, 243A, and 246 on the second floor of Parks Hall into Pharmacy Practice Labs, plus renovations of corridors X207C and X208C.
05/30/2018 06:00 PM UTC
OSU-170533, Lincoln Tower 14th Floor Renovation
Lincoln Tower 14th Floor Renovation 1800 Cannon Drive, Columbus, OH 43210 Complete renovation of the 14th floor of Lincoln Tower.
05/15/2018 06:00 PM UTC
OSU-180042 Atwell - Entrance & First Floor Renovation
This project will renovate the first floor entry, lobby, restrooms and corridors.
05/08/2018 06:00 PM UTC
OSU-180169, Newark - Campus Boiler Replacements
Newark Campus: Replace the two Kewanee heating hot water (HHW) boilers and make improvements to the HHW pumping and piping arrangement in the boiler room.
04/30/2018 06:00 PM UTC
OSU-170233 Riffe - First Floor Renovation
This project will build out shelled space on the 10th and 12th floors to create ICU beds.
04/25/2018 06:00 PM UTC
421 - 430 of 608 Solicitations
1 2 39 40 41 43 45 46 47 60 61