General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/14/2025 06:00 PM UTC
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
05/20/2025 06:00 PM UTC
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001 Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
05/21/2025 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-170172 Morehouse Pavilion - 3rd Floor Neuro Clinic
This project will renovate space vacated by Sports Medicine on the third floor for the Neuro clinic, relocating from the seventh floor of the tower.
12/12/2017 07:00 PM UTC
OSU-160980 Plumbing System Replacement BP1 - Postle Hall REBID
REBID - The project consists of the investigation of approximately 88 existing sanitary stacks to determine condition of existing piping. The project includes recording the pipe interiors via video camera, with removal of existing blockages where found. At some locations containing multiple stacks, the stacks will be combined into a single branch to the main in the tunnel. Project includes hazardous materials abatement.
12/08/2017 06:00 PM UTC
OSU-160936, Mansfield - Conard 2nd Floor Renovation REBID
OSU Mansfield Campus: The work consists of the partial renovation of approximately 5,100 square feet of teaching and prep labs, including the addition of a new air handling unit serving these spaces and associated plumbing and electrical work
12/07/2017 07:00 PM UTC
OSU-170541, Enarson - 4th Floor Office
Enarson – 4th Floor Office. This project will renovate the office spaces of the 4th floor.
12/06/2017 06:00 PM UTC
OSU-170279, Baker Sys - AHU Replacement
Replacement of Air Handling Unit in Baker Systems Engineering Building.
11/29/2017 07:00 PM UTC
OSU-160245, Ross - ACC Exam Room Oxygen
OSU Ross Heart Hospital ACC Exam Room Oxygen Unit Interior Upgrades to plumbing med gas oxygen extensions as well as supportive work including: selective demolition, interior partition selective demolition, patch and repair, painting finishes, and electrical system limited outlets.
11/15/2017 06:00 PM UTC
OSU-160915, Wooster - Secrest Welcome Center
OSU Wooster Campus: The Project consists of an interior renovation and re-programming of the existing OARDC Operations and Maintenance Building into the Ohio State University Secrest Arboretum Welcome Center.
11/14/2017 07:00 PM UTC
OSU-160375, Doan - Room W293 Endoscopy Renovation
Renovation of existing Endoscopy Reprocessing Room to include replacement of existing pass throughs and scope cabinets, new equipment and sinks, new casework and finish upgrades. Wall modifications to the existing reprocessing Room and adjacent procedure rooms will be required. Modifications to multiple adjacent rooms adjacent to the Lab will be required to enable the renovation of the main endoscopy lab. The project will be constructed in multiple phases with an emphasis on sequence of events closely coordinated with hospital operation.
11/09/2017 07:00 PM UTC
OSU-150015 Plumbing Repair - RPAC Steam and Hot Water
Plumbing Repairs - RPAC Steam and Hot Water
11/01/2017 07:00 PM UTC
OSU-160911, CFAES Lab and Office Renovations (Rebid)
OSU Main Campus: Work includes renovation to the Agriculture Administration Building and to Howlett Hall. Work within the Agriculture Admin Building can be characterized best as “office” and work within Howlett can be characterized as “lab”.
11/01/2017 06:00 PM UTC
421 - 430 of 558 Solicitations
1 2 39 40 41 43 45 46 47 55 56