City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 8733PlanHolders12122025.pdf (91.1 KB) |
Contract 8733 - Hawthorne, Lake, W Dayton
| |
| Number | Deadline |
|---|---|
|
8733 - Hawthorne Court Reconstruction Assessment District - 2023, Lake Street Sanitary Sewer Replacement Assessment District - 2025, West Dayton Street Sanitary Replacement Assessment District - 2025
This contract will include reconstruction of Hawthorne Ct between University Ave and State St. This contract will also include replacement and upsizing of the sanitary sewer along W. Dayton St (between N. Lake St & N. Frances St) and N. Lake St (between a tie-in point 370’ north of University Ave & State St).
| 12/18/2025 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
8754 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 19) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the City of Madison), and associated work.
| 02/08/2024 08:00 PM UTC |
|
9503 - Sycamore Singletrack Trail Improvements 2024
The work includes constructing up to 6538 linear feet of off-road, natural surface, bike optimized, single track trail in Sycamore Park
| 02/08/2024 08:00 PM UTC |
|
9389 - Sycamore Singletrack Trail Improvements 2024
The work includes constructing up to 6538 linear feet of off-road, natural surface, bike optimized, single track trail in Sycamore Park.
The trail consists of natural material constructed using a “lift and tilt” method to create a sustainable surface. A portion of the trail will be an all-weather feature trail using a chip seal product to allow all weather use. Technical trail features are added to both trail type to enhance riding experience. These features are constructed of native stone and imported stone where needed.
| 01/11/2024 08:00 PM UTC |
|
9329 - Fire Station 14 Training Site Phase 1
The work includes the construction of private roadways to be located at the Madison Fire Station No. 14 Training Site, 3101 Dairy Drive. The private roadways, including water hydrants, paving, curb/gutter and stormwater management will be used by Madison Fire Department for operator training and access to future training apparatus.
| 01/11/2024 08:00 PM UTC |
|
9390 - Lower Badger Mill Ponds Restoration
The work includes ecological restoration, including tree and shrub planting, invasive species removals, and native seeding at a City of Madison owned property.
| 12/21/2023 08:00 PM UTC |
|
9289 - Unit Well 19 Treatment System Addition
A new addition to the existing Unit Well 19 building to house treatment equipment for removal of iron, manganese and radium. Site work includes grading, landscaping as well as on-site utility work.
| 12/14/2023 08:00 PM UTC |
|
8693 - Sheboygan Ave and N. Segoe Rd Resurfacing with Utilities
This work includes replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk replacement, asphalt pavement, traffic signals, pavement marking and signing.
| 12/14/2023 08:00 PM UTC |
|
8762 - Hammersley Road Resurfacing Assessment District - 2024
The work shall include, but is not limited to excavation, clearing & grubbing, replacement of sanitary sewer main & laterals, water main & services, storm sewer, asphalt pavement, roadway base course, curb & gutter, driveway aprons, sidewalk and ramps, ground restoration, and
pavement markings.
| 11/30/2023 08:00 PM UTC |
|
8711 - HARVEY STREET AND SCHMITT PLACE ASSESSMENT DISTRICT - 2023
Work includes, but is not limited to, replacing sanitary sewer, replacing water main, replacing and/or improving storm sewer, installation of concrete sidewalk and curb and gutter, replacement of asphalt pavement, and replacement of driveway aprons.
| 11/30/2023 08:00 PM UTC |
|
9361 - STATE STREET CAMPUS GARAGE MIXED-USE PROJECT
A new public and private development opportunity that includes the demolition and replacement of the existing State Street Campus Garage (SSCG) at 415 North Lake Street. The proposed building project will be completed in two construction phases. Phase 1 –the Public Works project titled State Street Campus Garage Mixed-Use Project - includes demolition of the existing SSCG and proposed construction will include an intercity bus terminal, public parking structure, and “gray box” spaces for final build out by a private Developer (i.e. Mortenson Development, Inc.). Phase 2 –constructed by the Developer and not included in the scope of this contract- will include private housing components built on top and within the Phase 1 construction.
| 11/09/2023 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.