City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 9593PlanHolders04012026.pdf (90 KB) |
Contract 9593 - Pressure Zone 4 Crossing
| |
| 9694PlanHolders04012026.pdf (90.3 KB) |
Contract 9694 - Warner & Worthington Park Courts
| |
| 9726PlanHolders04012026.pdf (97.4 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9740PlanHolders04012026.pdf (96.7 KB) |
Contract 9740 - Unit Well 12 Upgrade
| |
| 9751PlanHolders04012026.pdf (86.4 KB) |
Contract 9751 - 2026 Parking Garage Maintenance
| |
| 9757PlanHolders04012026.pdf (88.3 KB) |
Contract 9757 - Imagination Center Fiber
| |
| 9766PlanHolders04012026.pdf (88.9 KB) |
Contract 9766 - Metro Transit Kennedy Bus Charger
| |
| Number | Deadline |
|---|---|
|
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
| 04/02/2026 07:00 PM UTC |
|
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
| 04/02/2026 07:00 PM UTC |
|
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex.
The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
| 04/02/2026 07:00 PM UTC |
|
9757 - Imagination Center Fiber Connection
A new fiber connection between an existing splice point on corner of E Washington Ave and Thierer Rd, and the newly constructed Imagination Center at Reindahl Park facility at 1818 Portage Road. The new duct will be a single 3” duct with a single 48-strand fiber optic cable.
| 04/02/2026 07:00 PM UTC |
|
9751 - 2026 Parking Garage Maintenance
This work covers repairs at the Capitol Square North (CSN), State Street Capitol (SSCo), South Livingston Street (SLS), and Wilson Street Garage (WSG) parking ramps in Madison, Wisconsin. Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
| 04/02/2026 07:00 PM UTC |
|
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 04/23/2026 07:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 05/21/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
9485 - Rennebohm Park Shelter Restroom Renovation
The work includes, but is not limited to, removal and replacement of mechanical, electrical, and plumbing systems, removal and construction of some exterior walls, removal and replacement of slabs on grade, and interior renovations to create 4 individual use restrooms, a warming room, and a utility room within the existing enclosed area of the park shelter.
| 03/07/2024 08:00 PM UTC |
|
8737 - Resurfacing 2024 - Asphalt Pavement Pulverizing, Milling & Paving
The work includes pulverizing, milling, and paving various streets that are included with the resurfacing program. This contract also includes concrete pavement removal, placing crushed aggregate base course and paving on Old Sauk Rd.
| 03/07/2024 08:00 PM UTC |
|
8738 - Resurfacing 2024 - Asphalt Base Patching and Base Patch Grinding
The work includes asphalt base patching, patch by grind (mill/overlay) citywide, and infrared patching. Contractor may be required to replace temporary patches with permanent HMA patches. On streets that have a pavement rating greater than 6 and on collector and arterial streets patches shall then have the limit extended by mill and overlay per the established patching criteria.
| 03/07/2024 08:00 PM UTC |
|
8736 - Resurfacing 2024 - Curb & Gutter and Castings
The work includes replacement of curb and gutter, drive aprons, sidewalk ramps including truncated domes (supplied by City of Madison), adjusting inlets and castings (castings supplied by City of Madison), and installation of new storm sewer in advance of pavement pulverizing/milling and paving.
| 03/07/2024 08:00 PM UTC |
|
8756 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 19) - 2024
The Contractor shall perform repair work primarily throughout the 19th Aldermanic District. A list of approved repair locations and an area map of Aldermanic District 19 has been provided within these Special Provisions for reference. The list, however, is not a final list. Additional locations may be added. Horizontal sawcut/grind locations have been marked in the field with a pink line and a white “C”. The Contractor shall horizontally sawcut/grind sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
| 02/22/2024 08:00 PM UTC |
|
8743 - Lake Mendota Drive Assessment District - 2024
The work includes replacement and installation of new storm sewer pipes and structures, installation of concrete sidewalk and curb and gutter, replacement of asphalt pavement, and replacement of driveway aprons.
| 02/22/2024 08:00 PM UTC |
|
9342 - Unit Well 15 PFAS Treatment Facility
The work includes two GAC vessels, two ion exchange vessels, roof movement to accommodate vessels, treated water reservoir separation to create a filter-to-waste tank, chemical feed location changes, acid feed system changes, general HVAC, electrical, and architectural improvements, and driveway resurfacing
| 02/08/2024 08:00 PM UTC |
|
8696 - Bikeways 2023
The work includes but is not limited to replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking, and signing.
| 02/08/2024 08:00 PM UTC |
|
8717 - Mineral Point Road Widen Sidewalk
The work under this contract shall include, but is not limited to, construction of HMA pavement, concrete pavement, pavement resurfacing, curb and gutter, sidewalk, curb ramps, modular landscaping walls, grading, landscaping, storm sewer, water, fiber optic, lighting, traffic signals, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 02/08/2024 08:00 PM UTC |
|
9495 - 2024 Semi-Permanent Epoxy Pavement Markings
Furnishing and application or removal of epoxy pavement markings at locations throughout the City of Madison and per City of Madison Standard Pavement Marking Details or as shown
on the plans provided by the City of Madison.
| 02/08/2024 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.