General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9593PlanHolders04012026.pdf (90 KB)
Contract 9593 - Pressure Zone 4 Crossing
9694PlanHolders04012026.pdf (90.3 KB)
Contract 9694 - Warner & Worthington Park Courts
9726PlanHolders04012026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9740PlanHolders04012026.pdf (96.7 KB)
Contract 9740 - Unit Well 12 Upgrade
9751PlanHolders04012026.pdf (86.4 KB)
Contract 9751 - 2026 Parking Garage Maintenance
9757PlanHolders04012026.pdf (88.3 KB)
Contract 9757 - Imagination Center Fiber
9766PlanHolders04012026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
8 Documents

Upcoming Solicitations

Number Deadline
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
04/02/2026 07:00 PM UTC
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
04/02/2026 07:00 PM UTC
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex. The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
04/02/2026 07:00 PM UTC
9757 - Imagination Center Fiber Connection
A new fiber connection between an existing splice point on corner of E Washington Ave and Thierer Rd, and the newly constructed Imagination Center at Reindahl Park facility at 1818 Portage Road. The new duct will be a single 3” duct with a single 48-strand fiber optic cable.
04/02/2026 07:00 PM UTC
9751 - 2026 Parking Garage Maintenance
This work covers repairs at the Capitol Square North (CSN), State Street Capitol (SSCo), South Livingston Street (SLS), and Wilson Street Garage (WSG) parking ramps in Madison, Wisconsin. Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
04/02/2026 07:00 PM UTC
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
8755 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 11) - 2024
The work includes horizontally sawcut/grinding sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
02/08/2024 08:00 PM UTC
8754 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 19) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the City of Madison), and associated work.
02/08/2024 08:00 PM UTC
9503 - Sycamore Singletrack Trail Improvements 2024
The work includes constructing up to 6538 linear feet of off-road, natural surface, bike optimized, single track trail in Sycamore Park
02/08/2024 08:00 PM UTC
9389 - Sycamore Singletrack Trail Improvements 2024
The work includes constructing up to 6538 linear feet of off-road, natural surface, bike optimized, single track trail in Sycamore Park. The trail consists of natural material constructed using a “lift and tilt” method to create a sustainable surface. A portion of the trail will be an all-weather feature trail using a chip seal product to allow all weather use. Technical trail features are added to both trail type to enhance riding experience. These features are constructed of native stone and imported stone where needed.
01/11/2024 08:00 PM UTC
9329 - Fire Station 14 Training Site Phase 1
The work includes the construction of private roadways to be located at the Madison Fire Station No. 14 Training Site, 3101 Dairy Drive. The private roadways, including water hydrants, paving, curb/gutter and stormwater management will be used by Madison Fire Department for operator training and access to future training apparatus.
01/11/2024 08:00 PM UTC
9390 - Lower Badger Mill Ponds Restoration
The work includes ecological restoration, including tree and shrub planting, invasive species removals, and native seeding at a City of Madison owned property.
12/21/2023 08:00 PM UTC
9289 - Unit Well 19 Treatment System Addition
A new addition to the existing Unit Well 19 building to house treatment equipment for removal of iron, manganese and radium. Site work includes grading, landscaping as well as on-site utility work.
12/14/2023 08:00 PM UTC
8693 - Sheboygan Ave and N. Segoe Rd Resurfacing with Utilities
This work includes replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk replacement, asphalt pavement, traffic signals, pavement marking and signing.
12/14/2023 08:00 PM UTC
8762 - Hammersley Road Resurfacing Assessment District - 2024
The work shall include, but is not limited to excavation, clearing & grubbing, replacement of sanitary sewer main & laterals, water main & services, storm sewer, asphalt pavement, roadway base course, curb & gutter, driveway aprons, sidewalk and ramps, ground restoration, and pavement markings.
11/30/2023 08:00 PM UTC
8711 - HARVEY STREET AND SCHMITT PLACE ASSESSMENT DISTRICT - 2023
Work includes, but is not limited to, replacing sanitary sewer, replacing water main, replacing and/or improving storm sewer, installation of concrete sidewalk and curb and gutter, replacement of asphalt pavement, and replacement of driveway aprons.
11/30/2023 08:00 PM UTC
131 - 140 of 1082 Solicitations