General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02112026.pdf (91 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02112026.pdf (92.3 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02112026.pdf (84.3 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02112026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
9361 - STATE STREET CAMPUS GARAGE MIXED-USE PROJECT
A new public and private development opportunity that includes the demolition and replacement of the existing State Street Campus Garage (SSCG) at 415 North Lake Street. The proposed building project will be completed in two construction phases. Phase 1 –the Public Works project titled State Street Campus Garage Mixed-Use Project - includes demolition of the existing SSCG and proposed construction will include an intercity bus terminal, public parking structure, and “gray box” spaces for final build out by a private Developer (i.e. Mortenson Development, Inc.). Phase 2 –constructed by the Developer and not included in the scope of this contract- will include private housing components built on top and within the Phase 1 construction.
11/09/2023 08:00 PM UTC
9334 - Robin Greenway Restoration
Ecological restoration, including tree removals, tree and shrub planting, invasive species removals, and native seeding at a City of Madison owned property.
11/09/2023 08:00 PM UTC
9377 University Avenue Box Repair - 2023
Work includes repairing the walls, roof, floor and utility connections. The project will take place within a 15'x6' and 12x6' reinforced concrete box culvert within University Ave. The project limits are University Ave., from Grand Ave. to Schmidt Pl.
11/09/2023 08:00 PM UTC
9304 - Northport Drive - School Road Traffic Signal Assessment District 2023
Removal and construction of signal conduit, concrete bases pavement markings, and sidewalks at the intersection of Northport Drive & School Road in the City of Madison.
11/09/2023 08:00 PM UTC
9086 - Metro Transit Hanson Rd. Bus Facility Remodel
Remodel existing buildings, including site improvements, for the Metro Transit Hanson Road Satellite Bus Facility, located at 3829 and 3901 Hanson Road in Madison, WI. This remodel will provide bus storage and bus maintenance for 60ft electric articulated buses for the Metro Bus Rapid Transit (BRT) system. The facility was previously a FedEx distribution center.
10/26/2023 07:00 PM UTC
9108 - Parkside Drive Sanitary Sewer Replacement
Cleaning, grubbing, replacement of sanitary sewer, installation of a gravel access path for maintenance equipment, pipe culvert removal, and restoration with topsoil, seed and matting.
10/05/2023 07:00 PM UTC
9336 - Felland Reservoir Booster Pump Install Milky Way Reservoir Valve Install
This project is located on the east side of Madison and will consist of installing a booster pump and associated piping in the existing control building at Felland Road reservoir.
09/21/2023 07:00 PM UTC
8710 - S. Owen Drive Assessment District - 2023
Replacement of sanitary sewer main and laterals, replacement of storm sewer structures and pipes, excavation, base preparation, asphalt pavement, curb and gutter, sidewalk, driveway aprons, terrace rain gardens, and pavement markings.
09/21/2023 07:00 PM UTC
9365 - Railroad Arch Culvert Repair at Southwest Bike Path
Reconstructing historic stone retaining wall located at 600 Glenway Street in Madison, WI. The Contractor or Contractor's subcontractor must be prequalifed in Historic Masonry prior to construction.
09/21/2023 07:00 PM UTC
8595 - Madison Public Market
This contract is for the selective demolition and construction of the future Madison Public Market site and facility located at 202 N First St, Madison WI. The work includes, but is not limited to, general site and building construction including civil, landscape, architectural, mechanical, electrical, plumbing, fire suppression, fire alarm, technology, and site utilities.
09/14/2023 07:00 PM UTC
131 - 140 of 1072 Solicitations