General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
9500 - 2024 Rennebohn Park East Tennis Courts
The work includes installing asphalt pavement, including base course for asphalt path and pickleball/tennis courts, installing footings/bases and electrical supply for the court lighting system, installing fencing, gates, net posts, net tie downs and sport court finishing and striping to construct a three (3) court (pickleball and tennis) complex at Rennebohm Park.
04/04/2024 07:00 PM UTC
9506 Warner Park Dog Park Lot Resurfacing
The work includes removing the existing curb and gutter, pulverizing the existing asphalt, installing new concrete curb and gutter, and installing a new layer of asphalt pavement.
04/04/2024 07:00 PM UTC
9509 - 2024 Sport Court Resurfacing
The work includes resurfacing and/or power washing existing basketball and tennis courts including crack sealing, seal coating, and court line painting at three (3) City of Madison project sites including Goodman, Huegel and Quann Parks.
04/04/2024 07:00 PM UTC
8750 - Chip Sealing 2024 - East
The work includes street sweeping and cleaning of all loose material, vegetation and other objectionable material, the protection of inlets and castings and chip sealing.
04/04/2024 07:00 PM UTC
8751 - Repairing and Sealing Pavement Cracks - Local Streets 2024
The work includes routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
04/04/2024 07:00 PM UTC
8752 - Repairing and Sealing Pavement Cracks - Major Streets 2024
The work includes routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
04/04/2024 07:00 PM UTC
9508 - CIPP Water Main Rehabilitation 2024
The work includes mobilization, shoring and maintaining water main access pits. Installing, disinfecting, protecting, and maintaining temporary water service. Traffic control and work site protection. Cleaning, televising, and recording the existing and new water mains. Furnishing and installing a structural CIPP water main liner. Internally reinstating service laterals. Field and laboratory documentation/testing. Site restoration (NOT to include pavement restoration). Delivering submittals and obtaining approvals (both Madison Water Utility and WI-Dept. of Natural Resources) as specified in these Contract documents.
04/04/2024 07:00 PM UTC
8758 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2024
The work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the City of Madison) and associated work.
04/04/2024 07:00 PM UTC
9501 Lake Street Sanitary Sewer Replacement
The work includes removal and installation of sanitary sewer pipes and structures, reconnection of sanitary laterals, trench dewatering, and trench patching of the affect streets.
04/04/2024 07:00 PM UTC
8712 Lowell Street Assessment District 2024
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, water main and services, and replacement of storm sewer main and storm sewer structures, rain garden, storm sewer treatment system, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking, and signing.
03/28/2024 07:00 PM UTC
131 - 140 of 1107 Solicitations
1 2 10 11 12 14 16 17 18 110 111