General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8801PlanHolders09052025.pdf (86.7 KB)
Contract 8801 - Troy Drive Green Ave
9674PlanHolders09052025.pdf (89.4 KB)
Contract 9674 - 346 E. Lakeside Demolition
9679PlanHolders09052025.pdf (87.7 KB)
Contract 9679 - Olin Park Bridge Replacement
9681PlanHolders09052025.pdf (88.6 KB)
Contract 9681 - Dairy Drive Campground
9687PlanHolders09052025.pdf (86 KB)
Contract 9687 - Country Grove Singletrack Trail
6 Documents

Upcoming Solicitations

Number Deadline
9674 - 346 E. Lakeside Demolition
This project includes the demolition of the house at 346 E. Lakeside Street and the restoration of the site to turf and a gravel path. The house is located on Lake Monona between another residential property and existing park property. Major features to be removed include: the house, garage, deck, fence lines, concrete path, asphalt drive, and existing vegetation.
09/18/2025 07:00 PM UTC
9687 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
09/18/2025 07:00 PM UTC
9679 - Olin Park Pedestrian Bridge Replacement
This project consists of the replacement of a pedestrian bridge at Olin Park in Madison, WI including but not limited to the following: • Removal of existing bridge • Bridge fabrication, delivery and installation of new bridge on existing abutments
09/18/2025 07:00 PM UTC
8801 - Troy Drive Green Avenue Sanitary Sewer with Resurfacing Knutson Drive and Green Avenue Assessment District - 2024
The work under this contract shall include, but is not limited to, installation sanitary sewer main and laterals, adjustment of water valves, and storm inlets, pulverize and shape the existing asphalt pavement, full width grinding of the existing pavement, bus pad installation, and spot replacement of curb and gutter and sidewalks, and new pavement marking.
09/18/2025 07:00 PM UTC
9681-Dairy Drive Campground Demo and Site Restoration
This contract is for the demolition of structures, site features and asphalt and/or concrete paving located 3202 Dairy Dr.
09/25/2025 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
9235 - Railroad Arch Culvert Repair at Southwest Bike Path
Reconstructing historic stone retaining wall located at 600 Glenway Street in Madison, WI. The Contractor or Contractor's subcontractor must be prequalifed in Historic Masonry prior to construction.
09/07/2023 07:00 PM UTC
9357 - IT Fiber Install - 2023 N. Charter to W. Washington Connection
Install new fiber optic through the combination of new and existing conduit between the existing splice points at the intersection of North Charter Street & Spring Street and an existing splice point outside 625 West Washington Ave. The project is approximately 3,500 feet in length.
09/07/2023 07:00 PM UTC
9322 - Fire Station 2 Lighting Retrofit
Replacement of all lighting fixtures and controls at Fire Station 2, located at 421 Grand Canyon Dr. in Madison, WI.
08/24/2023 07:00 PM UTC
9346 - 2023 Parking Garage Maintenance
Work covers repairs at seven City of Madison Parking Garages. Work includes, but is not limited to, concrete repair of slabs, columns, beams and stairs, joint repairs. See contract specifications for scope of work.
08/10/2023 07:00 PM UTC
9335 - CIPP UV Lining Rehabilitation of Sanitary Sewers Phase 2 - 2023
Work shall include the trenchless rehabilitation of approximately 15,649 linear feet of sanitary sewer pipelines ranging in size from 8” to 12” and approximately 345 linear feet of 24”storm sewer pipelines diameter using an Ultraviolet light cure CIPP system.
08/10/2023 07:00 PM UTC
8587 - Tenney Park Beach Shelter
8587 - Tenney Park Beach Shelter
07/13/2023 07:00 PM UTC
8876 - Wexford Pond Dredging
This project is located on the parcel at 1005 N. High Point Rd., Madison, WI.
07/13/2023 07:00 PM UTC
8659 - Hudson Ave., Miller Ave., Willard Ave., Center Ave., and Sommers Ave. Assessment District - 2023
Work shall include, but is not limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, and replacement of storm sewer main and storm sewer structures, excavation, base preparation. curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
07/13/2023 07:00 PM UTC
9333 - Robin Greenway Storm and Grading
9333 - Robin Greenway Storm and Grading
07/13/2023 07:00 PM UTC
9297 - Goodman Library Lighting Upgrade
Complete installation of all building components; the accepted testing, and commissioning of all systems; and the completion, and turn-in of all deliverables as outlined in the plans and specifications.
07/06/2023 07:00 PM UTC