General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02112026.pdf (91 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02112026.pdf (92.3 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02112026.pdf (84.3 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02112026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
9485 - Rennebohm Park Shelter Restroom Renovation
The work includes, but is not limited to, removal and replacement of mechanical, electrical, and plumbing systems, removal and construction of some exterior walls, removal and replacement of slabs on grade, and interior renovations to create 4 individual use restrooms, a warming room, and a utility room within the existing enclosed area of the park shelter.
03/07/2024 08:00 PM UTC
8737 - Resurfacing 2024 - Asphalt Pavement Pulverizing, Milling & Paving
The work includes pulverizing, milling, and paving various streets that are included with the resurfacing program. This contract also includes concrete pavement removal, placing crushed aggregate base course and paving on Old Sauk Rd.
03/07/2024 08:00 PM UTC
8738 - Resurfacing 2024 - Asphalt Base Patching and Base Patch Grinding
The work includes asphalt base patching, patch by grind (mill/overlay) citywide, and infrared patching. Contractor may be required to replace temporary patches with permanent HMA patches. On streets that have a pavement rating greater than 6 and on collector and arterial streets patches shall then have the limit extended by mill and overlay per the established patching criteria.
03/07/2024 08:00 PM UTC
8736 - Resurfacing 2024 - Curb & Gutter and Castings
The work includes replacement of curb and gutter, drive aprons, sidewalk ramps including truncated domes (supplied by City of Madison), adjusting inlets and castings (castings supplied by City of Madison), and installation of new storm sewer in advance of pavement pulverizing/milling and paving.
03/07/2024 08:00 PM UTC
8756 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 19) - 2024
The Contractor shall perform repair work primarily throughout the 19th Aldermanic District. A list of approved repair locations and an area map of Aldermanic District 19 has been provided within these Special Provisions for reference. The list, however, is not a final list. Additional locations may be added. Horizontal sawcut/grind locations have been marked in the field with a pink line and a white “C”. The Contractor shall horizontally sawcut/grind sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
02/22/2024 08:00 PM UTC
8743 - Lake Mendota Drive Assessment District - 2024
The work includes replacement and installation of new storm sewer pipes and structures, installation of concrete sidewalk and curb and gutter, replacement of asphalt pavement, and replacement of driveway aprons.
02/22/2024 08:00 PM UTC
9342 - Unit Well 15 PFAS Treatment Facility
The work includes two GAC vessels, two ion exchange vessels, roof movement to accommodate vessels, treated water reservoir separation to create a filter-to-waste tank, chemical feed location changes, acid feed system changes, general HVAC, electrical, and architectural improvements, and driveway resurfacing
02/08/2024 08:00 PM UTC
8696 - Bikeways 2023
The work includes but is not limited to replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking, and signing.
02/08/2024 08:00 PM UTC
8717 - Mineral Point Road Widen Sidewalk
The work under this contract shall include, but is not limited to, construction of HMA pavement, concrete pavement, pavement resurfacing, curb and gutter, sidewalk, curb ramps, modular landscaping walls, grading, landscaping, storm sewer, water, fiber optic, lighting, traffic signals, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
02/08/2024 08:00 PM UTC
9495 - 2024 Semi-Permanent Epoxy Pavement Markings
Furnishing and application or removal of epoxy pavement markings at locations throughout the City of Madison and per City of Madison Standard Pavement Marking Details or as shown on the plans provided by the City of Madison.
02/08/2024 08:00 PM UTC
111 - 120 of 1072 Solicitations
1 2 8 9 10 12 14 15 16 107 108