Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9668PlanHolders08212026.pdf (94.4 KB)
Contract 9668 - Mayflower Lift Station Replacement
9782PlanHolders08212026.pdf (97.6 KB)
Contract 9782 - South Point Public Works Facility
9806PlanHolders08212026.pdf (83.7 KB)
Contract 9806 - 2026 Playgrounds -- Set 2
9818PlanHolders08212026.pdf (86 KB)
Contract 9818 - Cypress Spray Park Redevelopment
5 Documents

Upcoming Solicitations

Number Deadline
9668 - Mayflower Lift Station Replacement
The work under this contract shall include, but is not limited to, the removal and replacement of the existing Mayflower sanitary sewer lift station, replacement of the existing force main, replacement of gravity sanitary sewer mains and structures, installation of an emergency generator, installation of a telemetry antenna tower, installation of a new site access drive, grading of the site, and restoration of the site.
08/27/2026 07:00 PM UTC
9782 - South Point Public Works Facility
This single contract is for the installation of a new Streets Division Operations Building and the remodeling of an existing warm storage building for Parks Division West Maintenance Operations.
09/10/2026 07:00 PM UTC
9818 - Cypress Spray Park Redevelopment
This contract consists of installation of a Splash Pad and Playground at Cypress Spray Park (902 Magnolia Ln.). The Contractor shall view the site prior to bidding to become familiar with the existing conditions. The Contractor shall work with the existing utilities to resolve conflicts during the construction process.
09/10/2026 07:00 PM UTC
9806 - 2026 Playgrounds -- Set 2
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at five (5) City of Madison park locations including James Madison Park, Marshall Park, Eastmorland Park, Orton Park, and Heifetz Park.
09/10/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
9535 - CIPP UV Lining Rehabilitation of Sewers Phase 2 - 2024
The work includes the trenchless rehabilitation of approximately 5,382 linear feet of sanitary sewer pipelines ranging in size from 8” to 15” diameter using an Ultraviolet light cure CIPP system.
11/21/2024 08:00 PM UTC
9517 - Pheasant Branch Greenway Enhancement
Work shall include, but is not limited to; clearing & grubbing, tree removal, channel excavation and riprap placement, base course, installation of box culvert crossings, installation of storm pipe and structures, installation of water main and appurtenances, installation of sanitary sewer main and structures, installation of pedestrian bridge, grading, road reconstruction, pavement marking and restoration including the removal of invasive species, seeding and planting operations, and maintenance of plantings. This project has received FEMA funding and is subject to all federal, state and local regulations and requirements as provided in these contract documents.
11/14/2024 08:00 PM UTC
9605 - Prairie Hills Detention Basin Improvements
The work includes but is not limited to removing the existing sediment buildup from the bottom of the Prairie Hills Detention Basin and grading the pond closer to original design elevations. Along with removing sediment, constructing a maintenance access drive off of Dorchester Way, constructing four 6’x6’ Storm Access Structures with 6’ sumps connected to existing stormsewer, removal of two inlets, D-2 clearing and grubbing, grading, street restoration and site restoration.
11/14/2024 08:00 PM UTC
9572 - N Lake Street Boat Ramp
This contract and associated plan set describes the work necessary to install a new 26’x20’ concrete slab at the existing boat launch located within the right-of-way of North Lake Street located in Madison, Wisconsin. This works includes but is not limited to excavation cut, placing concrete, and lake control.
11/07/2024 08:00 PM UTC
9582 - LED Street Lights
This project generally consists of removal and replacement of old streetlight fixtures with new LED fixtures Citywide.
10/17/2024 07:00 PM UTC
8770 - West Towne Path - Phase 2A
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, block retaining wall, lighting conduit and base/poles, pavement markings, and ground restoration.
09/26/2024 07:00 PM UTC
9486 - Commercial Avenue Sanitary Sewer Reconstruction
The work under this contract shall include, but is not limited to, installation of sanitary sewer main (open trench and bore & jack methods), lateral reconnections, and asphalt pavement patching.
09/12/2024 07:00 PM UTC
9536 - CIPP Lining Rehabilitation - Blair Street Sanitary Sewer Siphon & CIPP Lining Rehabilitation - North Mills Street Sanitary Sewer Siphon
The work includes the trenchless rehabilitation of an approximately 79 feet linear feet of 8” ductile iron sanitary sewer mains using thermal cure CIPP methods (two mains total).
09/12/2024 07:00 PM UTC
8767 - Door Creek Park Connection
The work under this contract shall include, but is not limited to, installing new conduit and fiber optic between an existing splice point at the intersection of Milwaukee Street and Sprecher Road and a new shelter being built at Door Creek Park.
08/29/2024 07:00 PM UTC
9561 - S. Paterson Street Sanitary Sewer Replacement Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of sanitary sewer main, lateral reconnection, bore and jacking of casing pipe, and asphalt pavement patching.
08/29/2024 07:00 PM UTC
111 - 120 of 1121 Solicitations