General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8733PlanHolders12122025.pdf (91.1 KB)
Contract 8733 - Hawthorne, Lake, W Dayton
2 Documents

Upcoming Solicitations

Number Deadline
8733 - Hawthorne Court Reconstruction Assessment District - 2023, Lake Street Sanitary Sewer Replacement Assessment District - 2025, West Dayton Street Sanitary Replacement Assessment District - 2025
This contract will include reconstruction of Hawthorne Ct between University Ave and State St. This contract will also include replacement and upsizing of the sanitary sewer along W. Dayton St (between N. Lake St & N. Frances St) and N. Lake St (between a tie-in point 370’ north of University Ave & State St).
12/18/2025 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
8737 - Resurfacing 2024 - Asphalt Pavement Pulverizing, Milling & Paving
The work includes pulverizing, milling, and paving various streets that are included with the resurfacing program. This contract also includes concrete pavement removal, placing crushed aggregate base course and paving on Old Sauk Rd.
03/07/2024 08:00 PM UTC
8738 - Resurfacing 2024 - Asphalt Base Patching and Base Patch Grinding
The work includes asphalt base patching, patch by grind (mill/overlay) citywide, and infrared patching. Contractor may be required to replace temporary patches with permanent HMA patches. On streets that have a pavement rating greater than 6 and on collector and arterial streets patches shall then have the limit extended by mill and overlay per the established patching criteria.
03/07/2024 08:00 PM UTC
8736 - Resurfacing 2024 - Curb & Gutter and Castings
The work includes replacement of curb and gutter, drive aprons, sidewalk ramps including truncated domes (supplied by City of Madison), adjusting inlets and castings (castings supplied by City of Madison), and installation of new storm sewer in advance of pavement pulverizing/milling and paving.
03/07/2024 08:00 PM UTC
8756 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 19) - 2024
The Contractor shall perform repair work primarily throughout the 19th Aldermanic District. A list of approved repair locations and an area map of Aldermanic District 19 has been provided within these Special Provisions for reference. The list, however, is not a final list. Additional locations may be added. Horizontal sawcut/grind locations have been marked in the field with a pink line and a white “C”. The Contractor shall horizontally sawcut/grind sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
02/22/2024 08:00 PM UTC
8743 - Lake Mendota Drive Assessment District - 2024
The work includes replacement and installation of new storm sewer pipes and structures, installation of concrete sidewalk and curb and gutter, replacement of asphalt pavement, and replacement of driveway aprons.
02/22/2024 08:00 PM UTC
9342 - Unit Well 15 PFAS Treatment Facility
The work includes two GAC vessels, two ion exchange vessels, roof movement to accommodate vessels, treated water reservoir separation to create a filter-to-waste tank, chemical feed location changes, acid feed system changes, general HVAC, electrical, and architectural improvements, and driveway resurfacing
02/08/2024 08:00 PM UTC
8696 - Bikeways 2023
The work includes but is not limited to replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking, and signing.
02/08/2024 08:00 PM UTC
8717 - Mineral Point Road Widen Sidewalk
The work under this contract shall include, but is not limited to, construction of HMA pavement, concrete pavement, pavement resurfacing, curb and gutter, sidewalk, curb ramps, modular landscaping walls, grading, landscaping, storm sewer, water, fiber optic, lighting, traffic signals, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
02/08/2024 08:00 PM UTC
9495 - 2024 Semi-Permanent Epoxy Pavement Markings
Furnishing and application or removal of epoxy pavement markings at locations throughout the City of Madison and per City of Madison Standard Pavement Marking Details or as shown on the plans provided by the City of Madison.
02/08/2024 08:00 PM UTC
8755 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 11) - 2024
The work includes horizontally sawcut/grinding sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
02/08/2024 08:00 PM UTC
111 - 120 of 1071 Solicitations
1 2 8 9 10 12 14 15 16 107 108