General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8763PlanHolders06182025.pdf (89.9 KB)
Contract 8763 - Badger Rusk Path
8784PlanHolders06182025.pdf (91.4 KB)
Contract 8784 - E Main S Hancock
9612PlanHolders06182025.pdf (108 KB)
Contract 9612 - CIPP UVLining - Phase 1 2025
9626PlanHolders06182025.pdf (110 KB)
Contract 9626 - Mid Town Hydraulic Improvements
9654PlanHolders06182025.pdf (106 KB)
Contract 9654 - CIPP Thermal Lining - Phase 1
6 Documents

Upcoming Solicitations

Number Deadline
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
9390 - Lower Badger Mill Ponds Restoration
The work includes ecological restoration, including tree and shrub planting, invasive species removals, and native seeding at a City of Madison owned property.
12/21/2023 08:00 PM UTC
9289 - Unit Well 19 Treatment System Addition
A new addition to the existing Unit Well 19 building to house treatment equipment for removal of iron, manganese and radium. Site work includes grading, landscaping as well as on-site utility work.
12/14/2023 08:00 PM UTC
8693 - Sheboygan Ave and N. Segoe Rd Resurfacing with Utilities
This work includes replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk replacement, asphalt pavement, traffic signals, pavement marking and signing.
12/14/2023 08:00 PM UTC
8762 - Hammersley Road Resurfacing Assessment District - 2024
The work shall include, but is not limited to excavation, clearing & grubbing, replacement of sanitary sewer main & laterals, water main & services, storm sewer, asphalt pavement, roadway base course, curb & gutter, driveway aprons, sidewalk and ramps, ground restoration, and pavement markings.
11/30/2023 08:00 PM UTC
8711 - HARVEY STREET AND SCHMITT PLACE ASSESSMENT DISTRICT - 2023
Work includes, but is not limited to, replacing sanitary sewer, replacing water main, replacing and/or improving storm sewer, installation of concrete sidewalk and curb and gutter, replacement of asphalt pavement, and replacement of driveway aprons.
11/30/2023 08:00 PM UTC
9361 - STATE STREET CAMPUS GARAGE MIXED-USE PROJECT
A new public and private development opportunity that includes the demolition and replacement of the existing State Street Campus Garage (SSCG) at 415 North Lake Street. The proposed building project will be completed in two construction phases. Phase 1 –the Public Works project titled State Street Campus Garage Mixed-Use Project - includes demolition of the existing SSCG and proposed construction will include an intercity bus terminal, public parking structure, and “gray box” spaces for final build out by a private Developer (i.e. Mortenson Development, Inc.). Phase 2 –constructed by the Developer and not included in the scope of this contract- will include private housing components built on top and within the Phase 1 construction.
11/09/2023 08:00 PM UTC
9334 - Robin Greenway Restoration
Ecological restoration, including tree removals, tree and shrub planting, invasive species removals, and native seeding at a City of Madison owned property.
11/09/2023 08:00 PM UTC
9377 University Avenue Box Repair - 2023
Work includes repairing the walls, roof, floor and utility connections. The project will take place within a 15'x6' and 12x6' reinforced concrete box culvert within University Ave. The project limits are University Ave., from Grand Ave. to Schmidt Pl.
11/09/2023 08:00 PM UTC
9304 - Northport Drive - School Road Traffic Signal Assessment District 2023
Removal and construction of signal conduit, concrete bases pavement markings, and sidewalks at the intersection of Northport Drive & School Road in the City of Madison.
11/09/2023 08:00 PM UTC
9086 - Metro Transit Hanson Rd. Bus Facility Remodel
Remodel existing buildings, including site improvements, for the Metro Transit Hanson Road Satellite Bus Facility, located at 3829 and 3901 Hanson Road in Madison, WI. This remodel will provide bus storage and bus maintenance for 60ft electric articulated buses for the Metro Bus Rapid Transit (BRT) system. The facility was previously a FedEx distribution center.
10/26/2023 07:00 PM UTC
101 - 110 of 1047 Solicitations
1 2 7 8 9 11 13 14 15 104 105