General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02112026.pdf (91 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02112026.pdf (92.3 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02112026.pdf (84.3 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02112026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
8752 - Repairing and Sealing Pavement Cracks - Major Streets 2024
The work includes routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
04/04/2024 07:00 PM UTC
9508 - CIPP Water Main Rehabilitation 2024
The work includes mobilization, shoring and maintaining water main access pits. Installing, disinfecting, protecting, and maintaining temporary water service. Traffic control and work site protection. Cleaning, televising, and recording the existing and new water mains. Furnishing and installing a structural CIPP water main liner. Internally reinstating service laterals. Field and laboratory documentation/testing. Site restoration (NOT to include pavement restoration). Delivering submittals and obtaining approvals (both Madison Water Utility and WI-Dept. of Natural Resources) as specified in these Contract documents.
04/04/2024 07:00 PM UTC
8758 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2024
The work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the City of Madison) and associated work.
04/04/2024 07:00 PM UTC
9501 Lake Street Sanitary Sewer Replacement
The work includes removal and installation of sanitary sewer pipes and structures, reconnection of sanitary laterals, trench dewatering, and trench patching of the affect streets.
04/04/2024 07:00 PM UTC
8712 Lowell Street Assessment District 2024
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, water main and services, and replacement of storm sewer main and storm sewer structures, rain garden, storm sewer treatment system, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking, and signing.
03/28/2024 07:00 PM UTC
8746 - West Washington Avenue and Henry Street Resurfacing Assessment District - 2024
The work includes, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk replacement, pulverize and shape, asphalt pavement, traffic signals, pavement marking and signing.
03/28/2024 07:00 PM UTC
9359 - Country Grove Park Shelter
The work includes furnishing all labor, materials, equipment and tools for general construction of a new Country Grove Park Shelter located at 7353 East Pass, Madison, WI, including but is not limited to, mechanical, electrical, plumbing, site and utility work including connections from the new building to water and sewer lines. Additional site work includes a new parking lot, paths, bio-retention basins and new sport courts.
03/21/2024 07:00 PM UTC
9493 - 2024 Parking Garage Maintenance
The work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components, installation of new or replacement concrete connections/anchors, and welding of steel.
03/21/2024 07:00 PM UTC
8753 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 11) by the Common Council
The work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the City of Madison), and associated work.
03/21/2024 07:00 PM UTC
9362 - Ohmeda Drive Assessment District - 2022
The work includes, but is not limited to, tree removal, street lighting removal, existing site removals, sanitary sewer main, sanitary sewer laterals, water main, water services, storm sewer main, storm sewer structures, fiber line conduit adjustment, excavation, base preparation, curb and gutter, driveway aprons, concrete sidewalk, asphalt pavement, and pavement marking.
03/21/2024 07:00 PM UTC
101 - 110 of 1072 Solicitations
1 2 7 8 9 11 13 14 15 107 108