Number Deadline
8733 - Hawthorne Court Reconstruction Assessment District - 2023, Lake Street Sanitary Sewer Replacement Assessment District - 2025, West Dayton Street Sanitary Replacement Assessment District - 2025
This contract will include reconstruction of Hawthorne Ct between University Ave and State St. This contract will also include replacement and upsizing of the sanitary sewer along W. Dayton St (between N. Lake St & N. Frances St) and N. Lake St (between a tie-in point 370’ north of University Ave & State St).
12/18/2025 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
9508 - CIPP Water Main Rehabilitation 2024
The work includes mobilization, shoring and maintaining water main access pits. Installing, disinfecting, protecting, and maintaining temporary water service. Traffic control and work site protection. Cleaning, televising, and recording the existing and new water mains. Furnishing and installing a structural CIPP water main liner. Internally reinstating service laterals. Field and laboratory documentation/testing. Site restoration (NOT to include pavement restoration). Delivering submittals and obtaining approvals (both Madison Water Utility and WI-Dept. of Natural Resources) as specified in these Contract documents.
04/04/2024 07:00 PM UTC
8758 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2024
The work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the City of Madison) and associated work.
04/04/2024 07:00 PM UTC
9501 Lake Street Sanitary Sewer Replacement
The work includes removal and installation of sanitary sewer pipes and structures, reconnection of sanitary laterals, trench dewatering, and trench patching of the affect streets.
04/04/2024 07:00 PM UTC
8712 Lowell Street Assessment District 2024
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, water main and services, and replacement of storm sewer main and storm sewer structures, rain garden, storm sewer treatment system, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking, and signing.
03/28/2024 07:00 PM UTC
8746 - West Washington Avenue and Henry Street Resurfacing Assessment District - 2024
The work includes, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk replacement, pulverize and shape, asphalt pavement, traffic signals, pavement marking and signing.
03/28/2024 07:00 PM UTC
9359 - Country Grove Park Shelter
The work includes furnishing all labor, materials, equipment and tools for general construction of a new Country Grove Park Shelter located at 7353 East Pass, Madison, WI, including but is not limited to, mechanical, electrical, plumbing, site and utility work including connections from the new building to water and sewer lines. Additional site work includes a new parking lot, paths, bio-retention basins and new sport courts.
03/21/2024 07:00 PM UTC
9493 - 2024 Parking Garage Maintenance
The work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components, installation of new or replacement concrete connections/anchors, and welding of steel.
03/21/2024 07:00 PM UTC
8753 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 11) by the Common Council
The work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the City of Madison), and associated work.
03/21/2024 07:00 PM UTC
9362 - Ohmeda Drive Assessment District - 2022
The work includes, but is not limited to, tree removal, street lighting removal, existing site removals, sanitary sewer main, sanitary sewer laterals, water main, water services, storm sewer main, storm sewer structures, fiber line conduit adjustment, excavation, base preparation, curb and gutter, driveway aprons, concrete sidewalk, asphalt pavement, and pavement marking.
03/21/2024 07:00 PM UTC
9485 - Rennebohm Park Shelter Restroom Renovation
The work includes, but is not limited to, removal and replacement of mechanical, electrical, and plumbing systems, removal and construction of some exterior walls, removal and replacement of slabs on grade, and interior renovations to create 4 individual use restrooms, a warming room, and a utility room within the existing enclosed area of the park shelter.