| 8829PlanHolders05222026.pdf (84 KB) |
Contract 8829 - Sidewalk Curb & Gutter 2026
| |
| 8830PlanHolders05222026.pdf (88.2 KB) |
Contract 8830 - Bridge Repairs - 2026
| |
| 9787PlanHolders05222026.pdf (85.9 KB) |
Contract 9787 - Newville Park Redevelopment
| |
| Number | Deadline |
|---|---|
|
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
| 06/04/2026 07:00 PM UTC |
|
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
| 06/04/2026 07:00 PM UTC |
|
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
| 06/11/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
9582 - LED Street Lights
This project generally consists of removal and replacement of old streetlight fixtures with new LED fixtures Citywide.
| 10/17/2024 07:00 PM UTC |
|
8770 - West Towne Path - Phase 2A
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, block retaining wall, lighting conduit and base/poles, pavement markings, and ground restoration.
| 09/26/2024 07:00 PM UTC |
|
9486 - Commercial Avenue Sanitary Sewer Reconstruction
The work under this contract shall include, but is not limited to, installation of sanitary sewer main (open trench and bore & jack methods), lateral reconnections, and asphalt pavement patching.
| 09/12/2024 07:00 PM UTC |
|
9536 - CIPP Lining Rehabilitation - Blair Street Sanitary Sewer Siphon & CIPP Lining Rehabilitation - North Mills Street Sanitary Sewer Siphon
The work includes the trenchless rehabilitation of an approximately 79 feet linear feet of 8” ductile iron sanitary sewer mains using thermal cure CIPP methods (two mains total).
| 09/12/2024 07:00 PM UTC |
|
8767 - Door Creek Park Connection
The work under this contract shall include, but is not limited to, installing new conduit and fiber optic between an existing splice point at the intersection of Milwaukee Street and Sprecher Road and a new shelter being built at Door Creek Park.
| 08/29/2024 07:00 PM UTC |
|
9561 - S. Paterson Street Sanitary Sewer Replacement Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of sanitary sewer main, lateral reconnection, bore and jacking of casing pipe, and asphalt pavement patching.
| 08/29/2024 07:00 PM UTC |
|
9238 - Burr Jones Shoreline Repair
The work includes removing two existing metal seawalls, placing riprap protection along the bank, asphalt path construction, incorporating a stone step area to the water from the edge of path, grading, erosion control, soil matting, and restoration.
| 08/15/2024 07:00 PM UTC |
|
9174 - McPike Park - Building Demolition and Site Restoration
The work includes the demolition and removal of structures, site features and asphalt paving located at 202-212 S. Baldwin Street, Madison, WI.
| 08/15/2024 07:00 PM UTC |
|
9489 - 3400 Block E Washington Ave Sanitary Sewer Replacement
This project generally consists of replacement and installation of sanitary sewer pipes and structures, abandoning existing sanitary sewer, and replacement of concrete pavement.
| 07/18/2024 07:00 PM UTC |
|
8742 Rutledge Street Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, sanitary laterals, water main, and storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, rain gardens, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking and signing.
| 07/18/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.