Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OOGM FS25-1
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells
Lancaster, Forward, and Connoquenessing Townships, Butler County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug fifteen (15) orphan gas wells, estimated to be 1,100 to 3,500 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 15, 2025 at 9:00 a.m.
Department representatives will meet contractors at: Pavillion #6 at Moraine State Park, 40.9667, -80.1238.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 10/30/2025 06:00 PM UTC |
|
OSM 17(7183)101.1
Abandoned Mine Reclamation Project
Goshen West
Goshen Township, Clearfield County
Estimated Amount: $500,000-$1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 4,480 L.F.
Clearing and Grubbing, 27.8 Acre
Grading - Grading, 216,478 C.Y.
Grading – Hummocky Piles, 14.3 Acre
Grading – Ripping, 13.5 Acre
Planting – Planting Preparation, 27.8 Acre
Planting – Tree Seedlings, 18.904 Each
| 11/06/2025 07:00 PM UTC |
|
OOGM 25-1
Cleaning Out and Plugging Forty-Four (44) Abandoned/Orphaned Wells Permitted Oil/Gas Wells
Highland Township, Elk County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug forty-four (44) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 22nd through October 23rd, 2025, at 9:00 a.m.
Department representatives will meet contractors at:
Lamont Tool Shop
Warehouse Rd (FR 337)
41.5347, -78.9143
To access the well locations, it is advised the contractors bring an ATV/UTV to commute between wells. The ATV trail access is between 7 and 8 miles of wooded terrain not accessible by car or truck. No pickup trucks or other vehicles other than ATV’s/UTV’s are permitted on the standalone ATV trail network. The USFS will allow the use of an ATV/UTV under 70” width at the pre-bid. The ride will be at your own risk and all safety equipment should be worn while driving. Although bringing an ATV/UTV is a recommended option, all potential bidders will have the opportunity to view all wells, regardless of if they bring an ATV/UTV to the meeting.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 11/06/2025 07:00 PM UTC |
|
OSM 17(4543)101.1
Abandoned Mine Reclamation Project
Alder Run
Morris Township, Clearfield County
Estimated Amount: $300,000-$500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12” Diameter) - 930 L.F.
Clearing and Grubbing, 21.7 ACRE
Grading - Grading, 149,622 C.Y.
Grading - Ripping, 0.6 ACRE
Planting - Planting Preparation, 21.7 ACRE
Planting - Tree Seedlings, 408 EACH
Dewatering Impoundments, 1 L.S.
Sediment Basin and Vernal Pool Construction, 1 L.S.
| 11/06/2025 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 65(1963)101.1
Abandoned Mine Reclamation Project
Boxcartown North
Murrysville Borough, Westmoreland County
Estimated Amount: $300,000-$500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 2,802 L.F.
Clearing and Grubbing, 11.7 ACRE
Grading, 83,489 C.Y.
Planting – Tree Seedlings, 5,848 EACH
Access Road, 1 EACH
Gas Line Crossings, 1 L.S.
| 10/23/2025 06:00 PM UTC |
|
OSM 17(7105)101.1
Abandoned Mine Reclamation Project
Eagle Eye School (Thomas)
Boggs and Decatur Townships, Clearfield County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 6,000 L.F.
Clearing and Grubbing, 58 ACRE
Brush Barriers, 5,000 L.F.
Grading – Grading Area 1, 399,819 C.Y.
Grading – Grading Area 2, 178,893 C.Y.
Planting – Tree Seedlings, 36,095 EACH
Gas Line Crossings, 1 L.S.
Infiltration Trench, 1,016 L.F.
| 10/16/2025 06:00 PM UTC |
|
OSM 26(1269)101.1
Abandoned Mine Reclamation Project
Roundtop Southwest
Lower Tyrone Township, Fayette County
Estimated Amount: $1,000,000 to $5,000,000
Term: 730 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 3 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 9,625 L.F.
Clearing and Grubbing, 51.7 ACRE
Grading, 386,057 C.Y.
Channel Excavation, 81 C.Y.
Planting – Planting Preparation, 51.7 ACRE
Subsurface Drains, 900 L.F.
Gas Line Relocation – Grading Area 1, 1 INVOICE
Fence – Temporary Field Fence, 3,332 L.F.
Fence – Permanent Field Fence, 3,820 L.F.
| 10/09/2025 06:00 PM UTC |
|
OSM 32(4601)101.1
Abandoned Mine Reclamation Project
Middle Dixon Creek
East Mahoning Township, Indiana County
Estimated Amount: $300,000-$500,000
Term: 120 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 2,186 L.F.
Clearing and Grubbing, 18.1 Acre
Grading - Grading, 179,064 C.Y.
Grading – Ripping, 3.2 Acre
Planting – Planting Preparation, 18.1 Acre
Permanent Channel Excavation, 26 C.Y.
Access Road, 1,145 L.F.
| 10/09/2025 06:00 PM UTC |
|
OOGM FS24-3
Cleaning Out and Plugging Seven (7) Orphan Gas Wells
Smith, North Strabane, North Franklin, and Canton Townships, Washington County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug seven (7) orphan gas wells, estimated to be 1,000 to 3,400 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: August 27, 2025, at 10:00 a.m.
Department representatives will meet contractors at:
40.1584, -80.2789 (Parking Lot)
Washington Crown Center
1500 West Chestnut Street
Washington, PA 15301
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 09/18/2025 06:00 PM UTC |
|
OSM 11(2713)102.1
Abandoned Mine Reclamation Project
Ingleside Northeast
Richland Township, Cambria County
Estimated Amount: $1,000,000 to $5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 7,800 L.F.
Clearing and Grubbing, 44 ACRE
Grading – Grading Area 1A, 54,000 C.Y.
Grading – Grading Area 1B, 56,658 C.Y.
Grading – Grading Area 2, 53,867 C.Y.
Grading – Grading Area 3, 304,510 C.Y.
Planting – Planting Preparation, 44 ACRE
Planting – Tree Seedlings, 27,880 EACH
Subsurface Drain, 930 L.F.
Rock Lined Channel, 506.1 S.Y.
Grass Lined Channel, 373.3 C.Y.
Type 2 Right-of-Way Fence, 1,350 L.F.
| 09/11/2025 06:00 PM UTC |
|
OSM 63(0962)102.1
Abandoned Mine Reclamation Project
Muse Coal Refuse Pile
Cecil Township, Washington County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 1,600 L.F.
Clearing and Grubbing, 10.8 ACRE
Grading, 54,000 C.Y.
Planting – Planting Preparation, 11.8 ACRE
Subsurface Drains, 900 L.F.
Grass Lined Ditches, 1,000 L.F.
Culvert – Culvert C-1, 60 L.F.
Culvert – Headwall, 1 EACH
Demolition and Disposal of Mine Facilities, 5 EACH
Gate, 1 EACH
Alkaline Addition, 3,500 TON
MANDATORY Pre-Bid Training will be held on: August 19, 2025 at 2:00 p.m. FAILURE TO ATTEND THE PRE-BID TRAINING WILL BE CAUSE FOR REJECTION OF THE BID.
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 09/04/2025 06:00 PM UTC |
|
OOGM FS24-5
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells
East Keating Township, Clinton County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug fifteen (15) orphan gas wells, estimated to be 825 to 4,200 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: June 26, 2025, at 10:00 a.m.
Department representatives will meet contractors at: 41.261528, -77.913032.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 07/17/2025 06:00 PM UTC |
|
OSM 40(1381)103.1
Abandoned Mine Reclamation Project
Freeland South
Hazle Township, Luzerne County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 90 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Demolition of Structures
Grading -15,435 C.Y.
Sealing Boreholes– 3
Seeding – 3.3 Acres
| 07/03/2025 06:00 PM UTC |
|
OSM 11(0826)104.1
Abandoned Mine Reclamation Project
Spangler Athletic Field
Northern Cambria Borough, Cambria County
Mandatory Pre-Bid Meeting: No
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12”
Diameter), 300 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Inlet Filter Bag, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Pumped Water Filter Bag, 5 EACH
Clearing and Grubbing, 1 L.S.
Diversion and Care of Water, 1 L.S.
Road and Sidewalk Replacement – Roadway Restoration, 5 S.Y.
Road and Sidewalk Replacement – Temporary Paving, 11 S.Y.
Road and Sidewalk Replacement – Concrete Sidewalk Restoration, 5 S.Y.
Road and Sidewalk Replacement – Gravel Driveway/Sidewalk Restoration, 10 S.Y.
Traffic Control, 1 L.S.
Subsurface Drain – Twelve-Inch (12”) Polyvinyl Chloride (PVC) Pipe, 360 L.F.
Subsurface Drain – Cleanouts, 3 EACH
Subsurface Drain – Connection to Mine Drift, 1 L.S.
Subsurface Drain – Connection to Existing Storm Inlet, 1 L.S.
Subsurface Drain – Reconnection of Existing Mine Drain to New Drain, 1 L.S.
Subsurface Drain – Reconnection of Existing Homeowner Drain, 2 EACH
Seeding – Seeding, 1 L.S.
Seeding – Additional Topsoil, 10 TON
| 07/03/2025 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.