General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OOGM FS25-1
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells Lancaster, Forward, and Connoquenessing Townships, Butler County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug fifteen (15) orphan gas wells, estimated to be 1,100 to 3,500 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 15, 2025 at 9:00 a.m. Department representatives will meet contractors at: Pavillion #6 at Moraine State Park, 40.9667, -80.1238. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
10/30/2025 06:00 PM UTC
OSM 17(7183)101.1
Abandoned Mine Reclamation Project Goshen West Goshen Township, Clearfield County Estimated Amount: $500,000-$1,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 4,480 L.F. Clearing and Grubbing, 27.8 Acre Grading - Grading, 216,478 C.Y. Grading – Hummocky Piles, 14.3 Acre Grading – Ripping, 13.5 Acre Planting – Planting Preparation, 27.8 Acre Planting – Tree Seedlings, 18.904 Each
11/06/2025 07:00 PM UTC
OOGM 25-1
Cleaning Out and Plugging Forty-Four (44) Abandoned/Orphaned Wells Permitted Oil/Gas Wells Highland Township, Elk County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug forty-four (44) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 22nd through October 23rd, 2025, at 9:00 a.m. Department representatives will meet contractors at: Lamont Tool Shop Warehouse Rd (FR 337) 41.5347, -78.9143 To access the well locations, it is advised the contractors bring an ATV/UTV to commute between wells. The ATV trail access is between 7 and 8 miles of wooded terrain not accessible by car or truck. No pickup trucks or other vehicles other than ATV’s/UTV’s are permitted on the standalone ATV trail network. The USFS will allow the use of an ATV/UTV under 70” width at the pre-bid. The ride will be at your own risk and all safety equipment should be worn while driving. Although bringing an ATV/UTV is a recommended option, all potential bidders will have the opportunity to view all wells, regardless of if they bring an ATV/UTV to the meeting. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/06/2025 07:00 PM UTC
OSM 17(4543)101.1
Abandoned Mine Reclamation Project Alder Run Morris Township, Clearfield County Estimated Amount: $300,000-$500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12” Diameter) - 930 L.F. Clearing and Grubbing, 21.7 ACRE Grading - Grading, 149,622 C.Y. Grading - Ripping, 0.6 ACRE Planting - Planting Preparation, 21.7 ACRE Planting - Tree Seedlings, 408 EACH Dewatering Impoundments, 1 L.S. Sediment Basin and Vernal Pool Construction, 1 L.S.
11/06/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSM 65(1963)101.1
Abandoned Mine Reclamation Project Boxcartown North Murrysville Borough, Westmoreland County Estimated Amount: $300,000-$500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 2,802 L.F. Clearing and Grubbing, 11.7 ACRE Grading, 83,489 C.Y. Planting – Tree Seedlings, 5,848 EACH Access Road, 1 EACH Gas Line Crossings, 1 L.S.
10/23/2025 06:00 PM UTC
OSM 17(7105)101.1
Abandoned Mine Reclamation Project Eagle Eye School (Thomas) Boggs and Decatur Townships, Clearfield County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 6,000 L.F. Clearing and Grubbing, 58 ACRE Brush Barriers, 5,000 L.F. Grading – Grading Area 1, 399,819 C.Y. Grading – Grading Area 2, 178,893 C.Y. Planting – Tree Seedlings, 36,095 EACH Gas Line Crossings, 1 L.S. Infiltration Trench, 1,016 L.F.
10/16/2025 06:00 PM UTC
OSM 26(1269)101.1
Abandoned Mine Reclamation Project Roundtop Southwest Lower Tyrone Township, Fayette County Estimated Amount: $1,000,000 to $5,000,000 Term: 730 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 3 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 9,625 L.F. Clearing and Grubbing, 51.7 ACRE Grading, 386,057 C.Y. Channel Excavation, 81 C.Y. Planting – Planting Preparation, 51.7 ACRE Subsurface Drains, 900 L.F. Gas Line Relocation – Grading Area 1, 1 INVOICE Fence – Temporary Field Fence, 3,332 L.F. Fence – Permanent Field Fence, 3,820 L.F.
10/09/2025 06:00 PM UTC
OSM 32(4601)101.1
Abandoned Mine Reclamation Project Middle Dixon Creek East Mahoning Township, Indiana County Estimated Amount: $300,000-$500,000 Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 2,186 L.F. Clearing and Grubbing, 18.1 Acre Grading - Grading, 179,064 C.Y. Grading – Ripping, 3.2 Acre Planting – Planting Preparation, 18.1 Acre Permanent Channel Excavation, 26 C.Y. Access Road, 1,145 L.F.
10/09/2025 06:00 PM UTC
OOGM FS24-3
Cleaning Out and Plugging Seven (7) Orphan Gas Wells Smith, North Strabane, North Franklin, and Canton Townships, Washington County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug seven (7) orphan gas wells, estimated to be 1,000 to 3,400 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: August 27, 2025, at 10:00 a.m. Department representatives will meet contractors at: 40.1584, -80.2789 (Parking Lot) Washington Crown Center 1500 West Chestnut Street Washington, PA 15301 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
09/18/2025 06:00 PM UTC
OSM 11(2713)102.1
Abandoned Mine Reclamation Project Ingleside Northeast Richland Township, Cambria County Estimated Amount: $1,000,000 to $5,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 7,800 L.F. Clearing and Grubbing, 44 ACRE Grading – Grading Area 1A, 54,000 C.Y. Grading – Grading Area 1B, 56,658 C.Y. Grading – Grading Area 2, 53,867 C.Y. Grading – Grading Area 3, 304,510 C.Y. Planting – Planting Preparation, 44 ACRE Planting – Tree Seedlings, 27,880 EACH Subsurface Drain, 930 L.F. Rock Lined Channel, 506.1 S.Y. Grass Lined Channel, 373.3 C.Y. Type 2 Right-of-Way Fence, 1,350 L.F.
09/11/2025 06:00 PM UTC
OSM 63(0962)102.1
Abandoned Mine Reclamation Project Muse Coal Refuse Pile Cecil Township, Washington County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 1,600 L.F. Clearing and Grubbing, 10.8 ACRE Grading, 54,000 C.Y. Planting – Planting Preparation, 11.8 ACRE Subsurface Drains, 900 L.F. Grass Lined Ditches, 1,000 L.F. Culvert – Culvert C-1, 60 L.F. Culvert – Headwall, 1 EACH Demolition and Disposal of Mine Facilities, 5 EACH Gate, 1 EACH Alkaline Addition, 3,500 TON MANDATORY Pre-Bid Training will be held on: August 19, 2025 at 2:00 p.m. FAILURE TO ATTEND THE PRE-BID TRAINING WILL BE CAUSE FOR REJECTION OF THE BID. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
09/04/2025 06:00 PM UTC
OOGM FS24-5
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells East Keating Township, Clinton County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug fifteen (15) orphan gas wells, estimated to be 825 to 4,200 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: June 26, 2025, at 10:00 a.m. Department representatives will meet contractors at: 41.261528, -77.913032. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
07/17/2025 06:00 PM UTC
OSM 40(1381)103.1
Abandoned Mine Reclamation Project Freeland South Hazle Township, Luzerne County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 90 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Demolition of Structures Grading -15,435 C.Y. Sealing Boreholes– 3 Seeding – 3.3 Acres
07/03/2025 06:00 PM UTC
OSM 11(0826)104.1
Abandoned Mine Reclamation Project Spangler Athletic Field Northern Cambria Borough, Cambria County Mandatory Pre-Bid Meeting: No Estimated Amount: $100,000-$200,000 (Small Business Only) Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12” Diameter), 300 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Inlet Filter Bag, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Pumped Water Filter Bag, 5 EACH Clearing and Grubbing, 1 L.S. Diversion and Care of Water, 1 L.S. Road and Sidewalk Replacement – Roadway Restoration, 5 S.Y. Road and Sidewalk Replacement – Temporary Paving, 11 S.Y. Road and Sidewalk Replacement – Concrete Sidewalk Restoration, 5 S.Y. Road and Sidewalk Replacement – Gravel Driveway/Sidewalk Restoration, 10 S.Y. Traffic Control, 1 L.S. Subsurface Drain – Twelve-Inch (12”) Polyvinyl Chloride (PVC) Pipe, 360 L.F. Subsurface Drain – Cleanouts, 3 EACH Subsurface Drain – Connection to Mine Drift, 1 L.S. Subsurface Drain – Connection to Existing Storm Inlet, 1 L.S. Subsurface Drain – Reconnection of Existing Mine Drain to New Drain, 1 L.S. Subsurface Drain – Reconnection of Existing Homeowner Drain, 2 EACH Seeding – Seeding, 1 L.S. Seeding – Additional Topsoil, 10 TON
07/03/2025 06:00 PM UTC
1 - 10 of 178 Solicitations