Upcoming Solicitations

Number Deadline
OSM 65(1750)101.1
Abandoned Mine Reclamation Project Peanut Derry Township, Westmoreland County Estimated Amount: $300,000.00 - $500,000.00 Term: 90 calendar days Bid Bond Required Principle Items of Work and Approximate Quantities: Mobilization and Demobilization, 1L.S. Office Facility, 1 L.S. Access Road - Surface, 1085 S.Y. Access Road - Culvert, 40L.F. Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (18” Diameter), 1.940 L.F. Clearing and Grubbing, 11 ACRE Demolition and Disposal of Coke Ovens,1 L.S. Selective Grading, 35,710 C.Y. Waterline Replacement, 900 L.F. Planting – Permanent Seed, 7 ACRE Planting – Wildlife Seed, 3 ACRE Planting – Tree, 1 ACRE
12/18/2025 07:00 PM UTC
OSM 26,65(2553,2758)102.1
Abandoned Mine Reclamation Project Belle Vernon Region (Phase 2) Rostraver Township, Westmoreland County Washington Township, Fayette County Estimated Amount: Greater than $5,000,000 Term: 900 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Overburden Drilling and Casing, Steel or PVC, 20,558 L.F. Four-Inch (4") Air Rotary Drilling, 74,489 L.F. Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 86,093 L.F. Supply and Delivery, Mixing and Injection of Grout Material - Cement, 9,624 TON Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 49,496 DRY TON Supply and Delivery, Mixing and Injection of Grout Material - Stone (AASHTO No. 8 Coarse Aggregate, 20 TON Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 42,152 DRY TON Injection Site Preparation and Site Restoration, 814 EACH
12/18/2025 07:00 PM UTC
OSM 11(0838)102.1
Abandoned Mine Reclamation Project Fox Run West Caroll Township, Cambria County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 2,950 L.F. Clearing and Grubbing, 11 ACRE Grading - Grading, 66,500 C.Y. Grading – Hummocky Piles, 2 ACRE Grading – Ripping, 2 ACRE Planting – Planting Preparation, 11 ACRE Planting – Tree Seedlings, 2,720 EACH
12/18/2025 07:00 PM UTC
OSM 03(1172)101.1
Abandoned Mine Reclamation Project Rupp Run South Manor Township, Armstrong County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 90 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (12” Diameter) - 50 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube – 20 L.F. Clearing and Grubbing, 0.1 Acre Planting – Planting Preparation, 0.2 Acre Channel Reconstruction – R-6 Riprap and Rock Energy Dissipaters, 200 L.F. Channel Reconstruction – SmartDitch, 175 L.F. Traffic Control, 1 L.S.
01/08/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSM 17(0111)101.1
Abandoned Mine Reclamation Project Madera North Side, Bigler Township, Clearfield County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Diversion and Care of Water, 1 L.S. Trench Excavation, 600 C.Y. Subsurface Drain – Pipe, 500 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 500 C.Y. Repaving – Base Course, 77 TON Repaving – Binder Course, 40 TON Traffic Control, 1 L.S. Office Facility, 1 L.S.
02/04/2021 07:00 PM UTC
OSM 11(2464)103.1
Abandoned Mine Reclamation Project Vintondale Refuse Pile Reclamation Vintondale Borough, Cambria County Estimated Amount: $1,000,000 to $5,000,000 Term: 910 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan and Highway Occupancy Permit, 1 L.S. Coal Refuse Removal and Grading - Coal Refuse Removal, 215,000 C.Y. Coal Refuse Removal and Grading - Coal Refuse Grading, 10 ACRE Equipment Storage Area, 278 S.Y. Seeding - Mulching, 10 ACRE READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. *Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
02/04/2021 07:00 PM UTC
OSM 40(0493,3724,3725)101.1
Abandoned Mine Reclamation Project Hollars Hill South AML - Cranberry Creek Gateway Project Hazle Township, Luzerne County Estimated Amount: Greater than $5,000,000 Term: 600 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Eight Inch (8") Ductile Iron Pipe Including Fittings - 1,015 L.F. Connection to Existing Water Main - 1 L.S. Drilling of Boreholes - 448 L.F. Furnishing and Installing Casing Pipe - 285 L.F. Fill Material Injection - Flowable Fill Material/Concrete Material - 200/200 C.Y. Removal and Disposal of Structures - 7 Grading, Hauling and Compaction - 742,666 C.Y. Disposal of Solid Waste - 10,000 Tons Drainage Excavation - 2,645 C.Y. Rock Lining - 4,099 S.Y. Seeding - 66 ACRE Addendum No. 1 was issued on December 1, 2020. Addendum No. 2 was issued on December 9, 2020. *Small Diverse Business and Veteran Business Enterprise Participation Goals: The Issuing Office and the Department of General Services’ Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) have not set Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals for this procurement. This procurement is either under the dollar threshold for setting SDB and VBE Participation goals, or the Issuing Office and BDISBO have determined that the SDB and/or VBE participation opportunities for the scope of work for this procurement are de minimis. There are no additional SDB, VBE or Small Business requirements for this procurement. However, SDB, VBE and Small Business utilization is encouraged when possible. Attachment A is not applicable under these circumstances.
12/17/2020 07:00 PM UTC
OOGM 19-3
Cleaning Out and Plugging One (1) Abandoned Well Mill Creek Township, Lycoming County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 120 calendar days Bid Bond Not Required Principal Items of Work and Approximate Quantities: Prepare and restore well site. Mobilize and demobilize plugging equipment. Clean-out and plug one abandoned well, estimated to be up to 6,854 feet in depth, to Department specifications.
10/29/2020 06:00 PM UTC
OSM 17(6806)101.1
Abandoned Mine Reclamation Project Weber Run South Cooper Township, Clearfield County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 210 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 1 L.S. Grading, 80,100 C.Y. Seeding, 9.5 Acre
09/17/2020 06:00 PM UTC
OSM 24(3895)102.1
Abandoned Mine Reclamation Project Winslow Hill III (East) Benezette Township, Elk County Estimated Amount: $500,000 to $1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 1 L.S. Alkaline Addition, 4,608 Ton Subsurface Drain with Cleanout, 250 L.F. Grading, 524,000 C.Y. Erosion Matting, 1,950 S.Y. Rock Lining, 100 S.Y. Culvert Pipe - Eighteen Inch (18") Smooth-Interior Corrugated N-12 Pipe, 50 L.F. Culvert Pipe - Twelve Inch (12") Smooth-Interior Corrugated N-12 Pipe, 30 L.F. Seeding, 45 Acre Tree Planting, 260 Tree Stone Aggregate, AASHTO No. 1 Stone, 328 Ton Stone Aggregate, PA DOT No. 2A Stone, 192 Ton
09/10/2020 06:00 PM UTC
OSM 17(7087)101.1
Abandoned Mine Reclamation Project Morgan Run Recreational Facility – West Decatur PO Boggs Township, Clearfield County Estimated Amount: $300,000 to $500,000 Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Dewatering Impoundments, 1 L.S. Clearing and Grubbing, 1 L.S. Subsurface Drain with Cleanouts, 430 L.F. Grading, 73,600 C.Y. Parking Area Construction, 1 L.S. Recreational Trail - Construction, 1 L.S. Recreational Trail - Culvert Pipe, 40 L.F. Amphitheater Construction, 1 L.S. Erosion Matting, 1,485 S.Y. Stone Aggregate - AASHTO No. 1, 1,800 Ton Stone Aggregate - PA DOT No. 2A, 1,910 Ton Rock Lining, 35 S.Y. Seeding, 12.4 Acre
09/10/2020 06:00 PM UTC
OSM 33(6102)101.1
Abandoned Mine Reclamation Project, Saint Tobias Cemetery, Snyder Township, Jefferson County. Mandatory Pre-Bid Meeting: No; Estimated Amount: $1,000,000 to $5,000,000; Term: 420 calendar days; Bid Bond Required. Principal Items of Work and Approximate Quantities: Clearing and Grubbing 1 Lump Sum; Grading 162,500 C.Y.; Trench Drain (A) Excavation 20,900 C.Y.; (B) Filter Fabric 17,595 S.Y.; (C) R-4 Rock 12,900 TON; (D) R-6 Rock 22,100 TON; Rolled Erosion Control Products 28,900 S.Y.; Access Roadway Surface Material 905 S.Y.; Seeding 22 ACRE.
09/03/2020 06:00 PM UTC
OSM 02(1726,0385)102.1
Abandoned Mine Reclamation Project Penn Hills Penn Hills Township, Allegheny County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 270 Calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Removal and Disposal of Garage and Solid Waste Disposal, 10 Ton Diversion and Care of Water, 1 L.S. Boring, 250 L.F. Siphon Pipe and Siphoning Process, 400 L.F. Polyethylene Pipe, 200 L.F. Channel Excavation, 65 C.Y. Cement Concrete Floor and Driveway, 100 S.Y. Replacement of Garage, 1 L.S.
07/23/2020 06:00 PM UTC
DMO 032056160.1
SR 160 Culvert Replacement Project, No. 2 Hill Mine, Shade Township, Somerset County. Estimated Contract Amount: $0 to $100,000 (Small Business Only); Term: 60 calendar days; Bid Bond NOT Required. Principal Items of Work and Approximate Quantities: Maintain One Lane of Traffic Through Entire Project Duration; Remove 38’ 15” Concrete Culvert Pipe and Headwall; Install 36 L.F. 38” x 60” Elliptical Concrete Culvert Pipe; Install Headwall and Endwall, JOB; Relocate and Install 40 L.F. New 4” Pressure Sewer Line; Engineering Survey, JOB; Equipment and Materials, JOB; Install Outlet Basin, JOB; Install 60 L.F. Rip-Rap In Upstream Channel; Resurface State Route to PennDOT Specifications, JOB; Revegetate All Disturbed Area, JOB; Photographic Documentation, JOB. MANDATORY PRE-BID MEETING: June 23, 2020 at 10:00 A.M. Location: 5185 Dark Shade Drive, Cairnbrook PA 15924
07/16/2020 06:00 PM UTC