General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OOGM FS25-6
Cleaning Out and Plugging Six (6) Orphan Gas Wells Center Township, Butler County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug six (6) orphan gas wells, estimated to be 1700 to 2200 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: February 4, 2026, at 10:00 a.m. Department representatives will meet contractors at: Adelman Fields 299 Old Plank Road Butler, PA Meet in parking lot of baseball field. 40.824529, -79.909805 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
02/26/2026 07:00 PM UTC
OOGM FS25-4
Cleaning Out and Plugging Three (3) Orphan Gas Wells Allegheny Township, Westmoreland County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug three (3) orphan gas wells, estimated to be 3500-4000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: February 18, 2026, at 10:00 a.m. Department representatives will meet contractors at: Baseball Field #4, 236 Air Shaft Road, Apollo, PA 15613, 40.580182, -79.620358. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
03/26/2026 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSM 16(3571)101.1
Abandoned Mine Reclamation Project Arthurs Southeast Paint Township, Clarion County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 210 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 1 L.S. Grading, 50,300 C.Y. Seeding, 7.7 Acre Tree Planting, 1,480 Tree
09/09/2021 06:00 PM UTC
OSM 02(0835)102.1
Abandoned Mine Reclamation Project Eastmont Swim Club Wilkins Township, Allegheny County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Trench Excavation 400 C.Y. Subsurface Drain – Eight-Inch (8”) Nominal Diameter PVC SDR-35 Pipe, 450 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 400 C.Y. Segmented Retaining Wall with Geogrid Reinforcement, 400 S.F. Patio Replacement, 20 S.Y.
09/09/2021 06:00 PM UTC
OSM 26(4702)101.1
Abandoned Mine Reclamation Project, Full Gospel Church, Stewart Township, Fayette County. Estimated Amount: $500,000 to $1,000,000 Term: 360 calendar days Bid Bond Required NO GOALS WERE DETERMINED FOR THIS PROJECT. ATTACHMENT A HAS BEEN OMITTED. Principal Items of Work and Approximate Quantities: Clearing and Grubbing 1 Lump Sum; Grading (A) Grading Area A 135,900 C.Y. (B) Grading Area B 44,900 C.Y.; Access Roadway and Parking Lot (A) Roadway Surface Material 925 S.Y. (B) Utility Pole Parking Stop 48 L.F.; Tree Planting 13,260 EACH; Furrow Ripping 10 ACRE; Deer Fencing 6,000 L.F.; Seeding 1 ACRE; ARRI Seeding 19.5 ACRE.
07/22/2021 06:00 PM UTC
OSM 11(3266)102.1
Abandoned Mine Reclamation Project, Cymbria II, Susquehanna Township, Cambria County. Estimated Amount: $300,000 to $500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 20.2 Acre; Permanent Swales with R-4 Rock Check Dams, 1,070 L.F.; Grading, 169,119 C.Y.; Tree Planting, 11,450 Tree. *There are no goal requirements for this project. Please note: Contract Drawing 5 of 6 for the Permanent Swales W/ Rock Check Dams should read “ To be lined with erosion matting which shall be Curlex II as manufactured by American Excelsior Company, 850 Avenue H East Arlington, TX 76011 or approved equivalent . Telephone 817-385-3500”.
07/08/2021 06:00 PM UTC
OSM 02(1726,0385)103.1
Abandoned Mine Reclamation Project, Penn Hills, Municipality of Penn Hills, Allegheny County. Estimated Amount: $300,000 to $500,000 Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Trench Excavation, 1,165 C.Y.; Smooth Interior Corrugated Polyethylene Pipe, 300 L.F.; Smooth Interior Corrugated Polyethylene Pipe Junction, 12 Each; Rock Lining with Geotextile, 415 Ton; Precast Concrete Inlet Box, 1 Each; PA DOT 2A Stone, 100 C.Y.; Boring - Twenty-four-inch (24”) Steel Casing, 275 L.F.; Subsurface Drain - Twelve-inch (12”) Polyvinyl Chloride (PVC) Pipe, 310 L.F.; Subsurface Drain - Eight-inch (8”) Polyvinyl Chloride (PVC) Pipe, 975 L.F.; Subsurface Drain - AASHTO No. 1 Coarse Aggregate, 860 C.Y. *There are no goal requirements for this project.
07/08/2021 06:00 PM UTC
OSM 32(3246)101.1
Abandoned Mine Reclamation Project Upper Two Lick West White Township, Indiana County Estimated Amount: $500,000 to $1,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Eight-Inch (8”) PVC Pipe Including Fittings – 1,250 LF Eight-Inch (8”) Ductile Iron Pipe Including Fittings – 2,900 LF Six-Inch (6”) Ductile Iron Pipe Including Fittings – 2,075 LF Service Lateral Connections - Three-Quarter Inch (3/4") Service – 22 Each Gas Line Crossing – 150 LF Stream Crossing – 120 LF Two-Inch (2”) Automatic Air Release Valve – 3 Each Typical Above Ground Blow-Off Assembly – 3 Each READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. *Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
06/03/2021 06:00 PM UTC
OSM 17(0846)101.1
Abandoned Mine Reclamation Project Waltzvale West Gulich and Bigler Townships, Clearfield County Estimated Amount: $500,000 to $1,000,000 Term: 360 calendar days Bid Bond Required NO GOALS WERE DETERMINED FOR THIS PROJECT. ATTACHMENT A HAS BEEN OMITTED. Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 5,000 L.F. Subsurface Drains with Cleanouts, 350 L.F. Grading, 220,000 C.Y. Channel Excavation, 1,400 C.Y. Rock Lining with Filter Blanket, 650 S.Y. Seeding – Seed Bed Preparation, 29 Acres Seeding - Tree Seedlings (25 acres), 17,010 Each
05/27/2021 06:00 PM UTC
OOGM 20-3
Cleaning Out and Plugging Six Abandoned Wells Sugarcreek Borough, Venango County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 180 calendar days Bid Bond NOT Required Principal Items of Work and Approximate Quantities: Clean out and plug six (6) abandoned wells, estimated to be up to 1,000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY PRE-BID CONFERENCE: May 13, 2021 at 9am Sugar Valley Lodge 323 Causeway Drive Franklin, PA 16323 FAILURE TO ATTEND THE PRE-BID CONFERENCE WILL BE CAUSE FOR REJECTION OF THE BID.
05/27/2021 06:00 PM UTC
OOGM 20-2
Cleaning Out and Plugging One Abandoned Well in Ross Township, Allegheny County. MANDATORY PRE-BID MEETING SCHEDULED FOR MARCH 25, 2021 AT 10:00 AM. MEET DEP REP AT 129 MAYER DRIVE IN PITTSBURGH, PA 15237. Estimated Amount of Project: $200,000 to $299,999 (Small Business Only); Term: 120 calendar days; Bid Bond NOT Required. Principal Items of Work: Clean out and plug one (1) abandoned well, estimated to be up to 3,000 feet in depth, to Department specifications; prepare and restore well site; mobilize and demobilize plugging equipment.
04/15/2021 06:00 PM UTC
OSM 32(4806)102.1
Abandoned Mine Reclamation Project, Canoe Ridge South, Canoe Township, Indiana County. Estimated Amount: $100,000 to $200,000 (Small Business Only). Term 360 calendar days. Bid Bond Required. Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S.; Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (Eighteen-Inch [18"] Diameter), 2,000 L.F.; Grading, 48,000 C.Y.; Seeding, 9 Acres.
03/25/2021 06:00 PM UTC
101 - 110 of 195 Solicitations
1 2 7 8 9 11 13 14 15 19 20