Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1289828-Communications Building-Rooms 1115 and 1154-Remodel
This project will remodel approximately 2,550 GSF in the Communications Building Suite 1115 and Room 1154. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, and lighting.
| 10/16/2025 07:01 PM UTC |
CP1015970-Human Nutritional Sciences Building-Textiles Science Teaching Laboratory-Remodel
This project proposes to remodel rooms 2003, 2110, 2116, 2118, 2124, and 2126 of the Human Nutritional Sciences Building (HNSB) to accommodate a Textiles Science Teaching Laboratory. A future project will include a first-floor remodel of HNSB to accommodate a Tearoom/Student-Run Restaurant (SRR). This project proposed to remodel approximately 2,417 gross square feet of the second floor of HNSB to a Textiles Science Teaching Laboratory (TSL). The TSL, temporarily located in Bessey Hall due to the rebuild of LeBaron Hall, will relocate to the new space. Work consists of demolition of interior space including existing walls, casework, equipment, and finishes. New work will include new walls, casework, fume hoods, finishes, and updated mechanical and electrical work to support the remodel.
| 10/30/2025 07:01 PM UTC |
CP1239249-Patterson Hall-Laboratory Speaker Strobe-Installation
This Project consists of replacement of fire alarm notification appliances throughout Area G first floor and second floor of the Patterson Hall Building.
| 11/04/2025 08:01 PM UTC |
CP1290583-Patterson Hall-Rooms 1107, 1220, 1222F, 1222G and 1222H-Remodel
This project will remodel rooms 1107, 1220, 1222F, 1222G, and 1222H. The scope of work includes, but is not limited to: removing a wall; patch and painting all walls; new flooring; new lighting; installing new sinks; demolishing existing casework and installing new casework and benching; relocating electrical receptacles; and modifying HVAC ductwork.
| 11/06/2025 08:01 PM UTC |
Number | Deadline |
---|---|
CP1017470-Memorial Union-Fountain of the Four Seasons-Renovation
The project consists of, but is not limited to, the renovation of the Memorial Union Fountain of the Four Seasons. Salvage and reinstallation of paving system and limestone units, select limestone unit replacements, select plumbing salvage, demolition and reconstruction of concrete structures, mechanical, electrical, and waterproofing systems. Coordination with Owners representative of installation of limestone sculptures and terra cotta units by others.
| 04/20/2023 07:01 PM UTC |
CP1094910-Buchanan Residence Hall-Water Service Piping-Replacement
The project consists of, but is not limited to, new 8 inch Ductile Iron water pipe, remove abandoned utilities, remove and replace PCC sidewalk, and grading with topsoil.
| 04/13/2023 07:01 PM UTC |
CP1088360-Beyer Hall-Swimming Pool-Repairs
The project consists of, but is not limited to, replacement of existing pool steam-to-water heat exchanger and associated piping and controls. Replacement of several manual isolation valves and pipe couplings. Project must be completed by 6:00 a.m. on August 20, 2023.
| 04/11/2023 07:01 PM UTC |
CP1001602-Roberts Residence Hall-Patio Repairs-West
The project consists of, but is not limited to, the repair and replacement of the patio structure, surface, stairs, and railings on the west exterior patio at Roberts Residence Hall. Interior patio walls below the surface will be repointed and waterproofed. The current patio crawlspace will be regraded, filled with geofoam, and topped with a new concrete base and patio surface. New subdrainage, downspouts, and patio surface drains will be connected to the existing storm drain.
| 03/28/2023 07:01 PM UTC |
CP002509-Curtiss Farm-Feed Mill and Grain Science Complex-Sanitary Sewer Extension
The project consists of, but is not limited to, the installation of approximately 2500 feet of sanitary sewer line along State Ave. Work includes a combination of trenchless and trenched installation. Work also includes supplying and installing several manholes.
| 03/09/2023 08:01 PM UTC |
CP1088271-EHSSB-Interior Improvements
This project includes, but is not limited to, architectural, electrical, and interior design work required to replace the existing raised floor system. The existing system furniture will be removed, prior to the new raised floor installation, and reinstalled at completion. New carpet tiles and floor base will also be installed.
| 03/09/2023 08:01 PM UTC |
CP002619-Therkildsen Industrial Engineering Building-Parking Lot 10 Expansion
The project consists of, but is not limited to, expansion of Parking Lot 10, located west of Town Engineering Building. The project includes pavement removal, grading, storm drainage utilities, underground storm detention, asphalt paving, asphalt mill and overlay, concrete curb and gutter, sidewalks and lighting.
| 03/07/2023 08:01 PM UTC |
CP930111-Veterinary Medicine-Room 1351-Remodel
This project includes, but is not limited to the demolition of the existing interior horse stalls, new LED lighting and electrical outlets, new finishes, including impervious surfaces, floor, walls, and ceiling in specified areas, mechanical upgrades to maintain a minimum required air changes, and biosafety Level 2 Lab requirement in a small portion of the lab.
| 02/23/2023 08:01 PM UTC |
CP986875-Frederiksen Court-Building 31-Fire Alarm System Upgrade
The project consists of, but is not limited to, fire alarm system upgrade including replacement of panel and all wiring according to Department of Residence standards and replacement of the apartment devices with addressable devices.
| 02/16/2023 08:01 PM UTC |
CP002589-Union Drive Community Center-Union Drive Marketplace-Renovation-Venues
The project consists of, but is not limited to, renovation of interior finishes and equipment in seating area and foodservice venues in the Union Drive Community Center. Upgrades include polishing of existing concrete flooring, wall and ceiling finishes, replacement of existing doors, new cooking and foodservice equipment, plumbing improvements, electrical power improvements, and installation of new lighting.
| 02/07/2023 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.