CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
| 05/13/2025 07:01 PM UTC |
CP1259884-Stephens Auditorium-Utility Lines-Repair
This project will make corrections to certain sanitary drains currently tied-in to the storm sewer system. The scope of work includes, but is not limited to, permanently sealing or rerouting drains from an electrical room, two mechanical rooms, and one air handling unit.
| 05/22/2025 07:01 PM UTC |
CP1119832-Beardshear Hall-Window Repairs-Phases 1 and 2-Phase 2
This project includes, but is not limited to, the restoration of existing wood windows and door frames at Beardshear Hall. All loose paint will be scraped off and any holes, splits, and damage to the existing wood frames will be patched and repaired to match existing shapes and sizes. The restoration includes professional repainting with premium exterior wood primer and paint. The existing original paint on the frames contains lead so all contractors working on this project will be required to adhere to the EPA Renovation, Repair, and Painting rule, which requires Lead Safe Work Practices.
| 05/22/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP1004288-CYTown-Parking and Infrastructure Improvements
The project consists of, but is not limited to, demolition of existing parking lots A3, A4, B5, B6, C5, C6, D1, D2, D3 and D4 and adjacent drives, soil import, grading, installation of underground utilities (including sanitary sewer, storm sewer, water main, electric and communications), subgrade preparation, PCC paving, HMA paving, parking lot lighting and surface restoration.
| 01/24/2023 08:01 PM UTC |
CP898870-Southeast Recreation Complex-Pavilion
The project consists of, but is not limited to, constructing a pavilion style shelter at the Southeast Recreation Complex. The pavilion will consist of a metal roof, concrete slab, metal columns, power, and data.
| 12/20/2022 08:01 PM UTC |
CP1001237-Forestry Greenhouse-Demolition
The project consists of, but is not limited to, demolition of the remaining Greenhouse structure and selected site facilities. Final site to be restored including grading and seeding. The abatement of all asbestos containing pipe-fitting insulation, glazing/glazing compound, transite wall paneling, and all associated sealants will be complete prior to building demolition.
| 12/20/2022 08:01 PM UTC |
CP941036-Agronomy Hall-Common Area Improvements
The project consists of, but is not limited to, remodeling three primary corridor spaces. Improvements include removing and replacing old ceiling systems with new lay-in and decorative ceilings, new lighting, new paint finishes on walls and any exposed ceiling, and new floor base. The common student hub area will be updated to receive new carpet and a coffee bar. A new rated glass door will be installed to improve visibility and to better welcome students into the space.
| 12/15/2022 08:01 PM UTC |
CP905958-Cyclone Sports Complex-Soccer Field-Replacement
The project consists of, but is not limited to, demolition and disposal of the existing synthetic turf field, rock subbase and drainage system. Proposed improvements also include grading, import of proposed pea gravel, sand, subdrain system, irrigation system, PCC curb, installation of sod that is provided by owner, and miscellaneous associated work necessary to complete the project.
| 12/15/2022 08:01 PM UTC |
CP1006655-Science Hall-AHU 3-Replacement
The project consists of, but is not limited to, the removal and replacement of Air Handling Unit 3 in Room 0074A of Science Hall. This work includes minor demolition of a masonry wall for a new door opening, demolition of existing piping, and demolition of existing ductwork associated with the demolition of the existing Air Handling Unit 3. Work also includes installing a new door and frame, insulating an existing wall, and installing a new air handling unit, ductwork, controls and associated piping with the installation of the unit.
| 12/08/2022 08:01 PM UTC |
CP002538-Friley Residence Hall-Roof Replacement-Dock Roof
The project consists of, but is not limited to, metal coping, roof hatch, roof membrane, and roof insulation replacement at the Friley Hall dock roof.
| 12/08/2022 08:01 PM UTC |
CP1006645-Science Hall-AHU 2-Replacement
The project consists of, but is not limited to, the replacement of AHU 2, in Room 061, minor demolition of existing plaster bulkheads, repair and replacement of existing acoustical tile ceilings, in corridors C0101, C0155, C0255, and C0355 and electrical work associated with AHU 2 and ceilings in corridors C0101, C0155, C0255, and C0355.
| 12/01/2022 08:01 PM UTC |
CP002641-Agronomy Hall-Masonry Repairs-Phase 1
The project consists of, but is not limited to, tuckpointing of exterior masonry, re-caulking of control joints and around windows, cleaning of exterior masonry and windows, and replacement of a metal frame skylight window system.
| 12/01/2022 08:01 PM UTC |
CP1000419-Physics Hall-Accessibility Improvements 2022
The project consists of, but is not limited to, modifications to the interior and exterior accessible ramps at the lower level of Physics Hall to provide compliant access into and throughout the lower level. The project also includes replacement of various sections of guardrail, handrail, and doors along the accessible routes undergoing modifications.
| 11/10/2022 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.