General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1289828-Communications Building-Rooms 1115 and 1154-Remodel
This project will remodel approximately 2,550 GSF in the Communications Building Suite 1115 and Room 1154. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, and lighting.
10/16/2025 07:01 PM UTC
CP1015970-Human Nutritional Sciences Building-Textiles Science Teaching Laboratory-Remodel
This project proposes to remodel rooms 2003, 2110, 2116, 2118, 2124, and 2126 of the Human Nutritional Sciences Building (HNSB) to accommodate a Textiles Science Teaching Laboratory. A future project will include a first-floor remodel of HNSB to accommodate a Tearoom/Student-Run Restaurant (SRR). This project proposed to remodel approximately 2,417 gross square feet of the second floor of HNSB to a Textiles Science Teaching Laboratory (TSL). The TSL, temporarily located in Bessey Hall due to the rebuild of LeBaron Hall, will relocate to the new space. Work consists of demolition of interior space including existing walls, casework, equipment, and finishes. New work will include new walls, casework, fume hoods, finishes, and updated mechanical and electrical work to support the remodel.
10/30/2025 07:01 PM UTC
CP1239249-Patterson Hall-Laboratory Speaker Strobe-Installation
This Project consists of replacement of fire alarm notification appliances throughout Area G first floor and second floor of the Patterson Hall Building.
11/04/2025 08:01 PM UTC
CP1290583-Patterson Hall-Rooms 1107, 1220, 1222F, 1222G and 1222H-Remodel
This project will remodel rooms 1107, 1220, 1222F, 1222G, and 1222H. The scope of work includes, but is not limited to: removing a wall; patch and painting all walls; new flooring; new lighting; installing new sinks; demolishing existing casework and installing new casework and benching; relocating electrical receptacles; and modifying HVAC ductwork.
11/06/2025 08:01 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
CP1000965-Surplus Warehouse
This project includes, but is not limited to, the construction of a new 6,600 sf warehouse, north of the existing Surplus Facility.
06/01/2023 07:01 PM UTC
CP1008443-Family Resource Center-Remodel
This project includes, but is not limited to, the replacement of heating and cooling units.
05/25/2023 07:01 PM UTC
CP1118018-Iowa School for the Deaf-Southeast Parking Lot-Expansion
The project consists of, but is not limited to, pavement removal, grading, subgrade prep, 6 inch PCC pavement, 5 inch PCC sidewalk, and site lighting at Iowa School for the Deaf in Council Bluffs, Iowa.
05/23/2023 07:01 PM UTC
CP942796-Beyer Hall-Room 2500-Remodel
The project consists of, but is not limited to, demolition of partial raised floor; installation of new raised floor, stairs, and ramp; new electrical; and renovation of existing mechanical duct system.
05/11/2023 07:01 PM UTC
CP002632-Kildee Hall-AHU2 and UVU4-Replacement
The project includes, but is not limited to, the replacement of Air Handling Unit (AHU) 2 and Unit Ventilator Unit (UVU) 4 with a semi-custom design unit to serve the west laboratory spaces in the building, new ductwork and pipe reconfiguration, along with improved access and relocation of the existing electrical transformer. Additionally, Mechanical Room M0026 will be prepared for future AHU replacements and improved maintenance access.
05/11/2023 07:01 PM UTC
CP942926-Science Hall-Rooms 0102 & 0152-Ventilation Improvements
The project consists of, but is not limited to, the replacement of two air handling units and the installation of two new energy recovery ventilators.
05/04/2023 07:01 PM UTC
CP002724-Friley Residence Hall-Bathroom Improvements-Locations 7 & 8
The project consists of, but is not limited to, remodel of bathrooms in Locations 7 and 8. The bathrooms will be converted from mass, shared bathrooms to private, accessible units. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
05/02/2023 07:01 PM UTC
CP964890-Sukup Basketball Complex-Rooms 1124 & 1125-Renovation
The project consists of, but is not limited to, demolition of existing finishes and walls; installation of new stud walls, flooring, finishes, and ceilings; new lighting; and modifications to existing mechanical system.
05/02/2023 07:01 PM UTC
CP964884-Hilton Coliseum-Rooms 0176, 0176A, 0188, and 0188A-Renovation
The project consists of, but is not limited to, demolition of existing finishes and walls; installation of new stud walls, flooring, finishes, and ceilings; new lighting; and modifications to existing mechanical system.
04/27/2023 07:01 PM UTC
CP002646-Beardshear Hall-Chilled Water Line Replacement-Phase 2
This project includes, but is not limited to, the replacement of the main chilled water lines in the basement, installation of additional gate valves to provide for improved zoning of the chilled water service, preparation for the replacement of the risers and returns for the next phase, and relocation of existing cable trays for better access.
04/27/2023 07:01 PM UTC
101 - 110 of 372 Solicitations
1 2 7 8 9 11 13 14 15 37 38