CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
| 06/26/2025 07:01 PM UTC |
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
| 07/01/2025 07:01 PM UTC |
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
| 07/08/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP942926-Science Hall-Rooms 0102 & 0152-Ventilation Improvements
The project consists of, but is not limited to, the replacement of two air handling units and the installation of two new energy recovery ventilators.
| 05/04/2023 07:01 PM UTC |
CP002724-Friley Residence Hall-Bathroom Improvements-Locations 7 & 8
The project consists of, but is not limited to, remodel of bathrooms in Locations 7 and 8. The bathrooms will be converted from mass, shared bathrooms to private, accessible units. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
| 05/02/2023 07:01 PM UTC |
CP964890-Sukup Basketball Complex-Rooms 1124 & 1125-Renovation
The project consists of, but is not limited to, demolition of existing finishes and walls; installation of new stud walls, flooring, finishes, and ceilings; new lighting; and modifications to existing mechanical system.
| 05/02/2023 07:01 PM UTC |
CP964884-Hilton Coliseum-Rooms 0176, 0176A, 0188, and 0188A-Renovation
The project consists of, but is not limited to, demolition of existing finishes and walls; installation of new stud walls, flooring, finishes, and ceilings; new lighting; and modifications to existing mechanical system.
| 04/27/2023 07:01 PM UTC |
CP002646-Beardshear Hall-Chilled Water Line Replacement-Phase 2
This project includes, but is not limited to, the replacement of the main chilled water lines in the basement, installation of additional gate valves to provide for improved zoning of the chilled water service, preparation for the replacement of the risers and returns for the next phase, and relocation of existing cable trays for better access.
| 04/27/2023 07:01 PM UTC |
CP1017470-Memorial Union-Fountain of the Four Seasons-Renovation
The project consists of, but is not limited to, the renovation of the Memorial Union Fountain of the Four Seasons. Salvage and reinstallation of paving system and limestone units, select limestone unit replacements, select plumbing salvage, demolition and reconstruction of concrete structures, mechanical, electrical, and waterproofing systems. Coordination with Owners representative of installation of limestone sculptures and terra cotta units by others.
| 04/20/2023 07:01 PM UTC |
CP1094910-Buchanan Residence Hall-Water Service Piping-Replacement
The project consists of, but is not limited to, new 8 inch Ductile Iron water pipe, remove abandoned utilities, remove and replace PCC sidewalk, and grading with topsoil.
| 04/13/2023 07:01 PM UTC |
CP1088360-Beyer Hall-Swimming Pool-Repairs
The project consists of, but is not limited to, replacement of existing pool steam-to-water heat exchanger and associated piping and controls. Replacement of several manual isolation valves and pipe couplings. Project must be completed by 6:00 a.m. on August 20, 2023.
| 04/11/2023 07:01 PM UTC |
CP1001602-Roberts Residence Hall-Patio Repairs-West
The project consists of, but is not limited to, the repair and replacement of the patio structure, surface, stairs, and railings on the west exterior patio at Roberts Residence Hall. Interior patio walls below the surface will be repointed and waterproofed. The current patio crawlspace will be regraded, filled with geofoam, and topped with a new concrete base and patio surface. New subdrainage, downspouts, and patio surface drains will be connected to the existing storm drain.
| 03/28/2023 07:01 PM UTC |
CP002509-Curtiss Farm-Feed Mill and Grain Science Complex-Sanitary Sewer Extension
The project consists of, but is not limited to, the installation of approximately 2500 feet of sanitary sewer line along State Ave. Work includes a combination of trenchless and trenched installation. Work also includes supplying and installing several manholes.
| 03/09/2023 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.