Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1271054-Ringgenberg Farm-Storm Water Improvements
The scope of work includes, but is not limited to, the construction of a grassed waterway, storm sewer connections, and miscellaneous drainage improvements for the Ringgenberg Farm.
| 12/16/2025 08:01 PM UTC |
| Number | Deadline |
|---|---|
|
CO002724-Friley Residence Hall-Bathroom Improvements-Stack H
The project consists of, but is not limited to, remodel of bathrooms in Stack H. The bathrooms will be converted from mass, shared bathrooms to private, accessible units. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
| 09/13/2022 07:01 PM UTC |
|
CP002619-Therkildsen Industrial Engineering Building-Parking Lot 1 Expansion
This project will construct an addition to Parking Lot 1, west of Friley Hall and south of Martin Residence Hall and realign Sheldon Avenue Extension, west of Town Engineering and Lot 10. The project consists of, but is not limited to, pavement removal, grading, storm drainage, underground and surface detention, PCC paving, communication utilities and lighting.
| 09/08/2022 07:01 PM UTC |
|
CP002623-Curtiss Hall-Exterior Masonry Repair
The project consists of, but is not limited to, stone repair, stone mortar repointing, joint sealant replacement and masonry cleaning.
| 08/30/2022 07:01 PM UTC |
|
CP1000416-LIDIF-Boiler System-Replacement
The project consists of, but is not limited to, the replacement of the existing boiler system in the Livestock Infectious Disease Isolation Facility. Work includes replacement of the three existing 1997 boilers, piping installation, combustion air supply, electrical power connections, control wiring connections, and necessary inspections. Boilers are OFCI.
| 08/30/2022 07:01 PM UTC |
|
CP917722-Dairy Farm-Cow Bedding System Conversion
The project consists of, but is not limited to, the materials and labor to remove the concrete in the lactating cow free stall pens and replacing with new concrete designed for the use of sand bedding.
| 08/23/2022 07:01 PM UTC |
|
CP923004-Utilities-Pearson Substation-13.8kV Feeder Cable Replacement
The project consists of, but is not limited to, removal and replacement of 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations in above ground switchgear. Perform hi-pot cable tests on installed cable, splices, and terminations.
| 07/19/2022 07:01 PM UTC |
|
CP002672-Gilman Hall-Accessible Restroom Improvements
The project consists of, but is not limited to, the renovation of existing space on level 1 in Gilman Hall into a new mens restroom including plumbing improvements, electrical improvements and the installation of new lighting.
| 07/14/2022 07:01 PM UTC |
|
CP941665-Molecular Biology Building-Room 0121-Remodel
The project consists of, but is not limited to, remodeling an existing animal holding room into a laboratory. The project includes replacement of interior finishes, lighting and controls, mechanical system components, plumbing lines, fixed casework, and the addition of a fume hood.
| 06/28/2022 07:01 PM UTC |
|
CP002721-Administrative Services Building-HVAC System Conversion
The project consists of, but is not limited to, the replacement of the building roof and removal of the underperforming HVAC system from the roof, replacing it with a new mechanical room building, new energy efficient air handling system, and connection to the adjacent campus chilled water system. This project includes removal of the existing HVAC system, connection to the campus chilled water loop, construction of a new two-story mechanical room on the west side of the building, installation of new air handling equipment, cooling coils and associated components, replacement of the existing ASB roof system, relocation of the existing emergency generator. All the work associated with this will require a phased approach and the new system must be operational prior to the removal of the existing HVAC systems.
| 06/23/2022 07:01 PM UTC |
|
CP2762-Horticulture Research Station-AVES Building
The project consists of, but is not limited to, the materials and labor to construct a wood frame building with metal siding and roofing. The building will be approximately 2240 square feet. The project will include site work and footings excavation. The building will have concrete foundations, a partial concrete floor, metal exterior doors and frames, and eight interior metal doors and frames.
| 06/21/2022 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.