CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
06/26/2025 07:01 PM UTC
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
07/01/2025 07:01 PM UTC
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP942806-Jacobson Athletic Building-Room 2035-Remodel
The project consists of, but is not limited to, demolition of existing flooring, stairs, walls, and doors. Construction of new glass partition walls, raised floor platform, new doors, electrical and mechanical modifications to existing, and new lighting.
05/12/2022 07:01 PM UTC
CP002630-General Services Building-Sprinkler System Installation
The project consists of, but is not limited to, modifications to the water service entrance, new main sprinkler piping and valves, and updating the fire detection and alarm system.
05/12/2022 07:01 PM UTC
CP930220-Curtiss Hall-Room 0209C-Remodel
This project includes, but is not limited to, demolition of existing walls, finishes, furniture, and MEP equipment; installation of new walls, doors, frames, ceilings, and finishes for two to three offices; new MEP equipment and lighting to serve new office spaces; and installation of new furnishings.
05/10/2022 07:01 PM UTC
CP002749-Memorial Union-Roof Replacement
The project consists of, but is not limited to, full replacement of roof sections D, F, H, L, M, N, O, P, Q, R, S, T and U.
05/05/2022 07:01 PM UTC
CP002505-Sports Performance Center & Jack Trice Stadium Improvements North-Bergstrom Football Complex-Rooms 2050, 2054, and 2056
The project consists of, but is not limited to, interior demolition of existing metal stud walls and finishes. New construction to include new metal stud walls and finishes, ceilings, lighting, mechanical and new corridor carpeting.
05/05/2022 07:01 PM UTC
CP936596-Veterinary Medicine-Rooms 2401, 2402, 2403, and 2404-Remodel
The project consists of, but is not limited to, remodeling existing meeting rooms with new partition walls, carpet, ceiling tiles, windows, and doors. Also replacing light fixtures, receptacles, and furniture.
05/03/2022 07:01 PM UTC
CP002745-Stephens Auditorium-Roof Replacement-Section A
The project consists of, but is not limited to, installing new fully adhered 90 mil EPDM roof membrane and insulation system over the existing roof membrane and insulation. Provide and install new flashings and roof expansion covers.
04/28/2022 07:01 PM UTC
CP002758-Kildee Hall-Roof Replacement-Section A and B
The project consists of, but is not limited to, replacing the roof system with a more substantial replacement, increasing insulation to current energy codes, and adding the appropriate roof safety systems and equipment.
04/26/2022 07:01 PM UTC
CP919196-Fire Service Storage Building-Demolition
The project consists of, but is not limited to, demolition of selected site facilities and other structures and site restoration including grading and seeding.
04/14/2022 07:01 PM UTC
CP898870-Southeast Recreation Complex-Pavilions
The project consists of, but is not limited to, constructing a pavilion style shelter at the Southeast Recreation Complex. The pavilion will consist of a metal roof, concrete slab, metal columns, power, and data. This project will also relocate the weather detection system.