Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1303338-Howe Hall-Room 1200 Remodel
****THIS BID HAS BEEN CANCELLED****
This project will remodel room 1200 in Howe Hall. Work includes, but is not limited to: demolition of existing cubicles; construction of two offices and a front reception space; associated mechanical and electrical improvements; painting; carpeting; and lighting.
| 04/02/2026 07:01 PM UTC |
|
CP1300765-Town Engineering Building-Rooms 142, 148 and 156 Remodel
This project includes interior renovations to two existing lab spaces (Rooms 142 and 148) and one storage room (Room 156) at the west end of Town Engineering along the existing loading dock, totaling 3,000 square feet. The existing labs will be renovated to better support existing space uses and the existing storage room will be renovated into a cleaning and storage space. Demolition work includes but is not limited to; demolition of two existing concrete masonry walls, concrete slab, casework, and exterior access doors. New work includes but is not limited to: exterior wall patching and finishes. Mechanical scope includes but is not limited to: demolition of existing gas lines, new dust collection system, and replacement of existing grilles and diffusers. Electrical scope includes but is not limited to: renovations to power and lighting systems.
| 04/07/2026 07:01 PM UTC |
|
CP1295340-Institutional Roads 2026-Pavement Preservation
Planned work includes, but is not limited to, asphalt and concrete improvements on various Institutional Roads segments across campus.
| 04/14/2026 07:01 PM UTC |
|
CP1248808-Lake LaVerne-Improvements
The project consists of, but is not limited to, dewatering, excavation and disposal of lakebed sediment from Lake LaVerne as well as pavement removal, regrading of the lakebed, reshaping the lake edge, bank stabilization, placement of limestone outcropping and fieldstone along the lake edge, cut limestone walls, extending lake overflow channel, PCC sidewalks, railing replacement, site lighting, and seeding.
| 04/16/2026 07:01 PM UTC |
|
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1
This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
| 04/21/2026 07:01 PM UTC |
|
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
| 04/23/2026 07:01 PM UTC |
|
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
| 04/28/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP930111-Veterinary Medicine-Room 1351-Remodel
This project includes, but is not limited to the demolition of the existing interior horse stalls, new LED lighting and electrical outlets, new finishes, including impervious surfaces, floor, walls, and ceiling in specified areas, mechanical upgrades to maintain a minimum required air changes, and biosafety Level 2 Lab requirement in a small portion of the lab.
| 02/23/2023 08:01 PM UTC |
|
CP986875-Frederiksen Court-Building 31-Fire Alarm System Upgrade
The project consists of, but is not limited to, fire alarm system upgrade including replacement of panel and all wiring according to Department of Residence standards and replacement of the apartment devices with addressable devices.
| 02/16/2023 08:01 PM UTC |
|
CP002589-Union Drive Community Center-Union Drive Marketplace-Renovation-Venues
The project consists of, but is not limited to, renovation of interior finishes and equipment in seating area and foodservice venues in the Union Drive Community Center. Upgrades include polishing of existing concrete flooring, wall and ceiling finishes, replacement of existing doors, new cooking and foodservice equipment, plumbing improvements, electrical power improvements, and installation of new lighting.
| 02/07/2023 08:01 PM UTC |
|
CP1004288-CYTown-Parking and Infrastructure Improvements
The project consists of, but is not limited to, demolition of existing parking lots A3, A4, B5, B6, C5, C6, D1, D2, D3 and D4 and adjacent drives, soil import, grading, installation of underground utilities (including sanitary sewer, storm sewer, water main, electric and communications), subgrade preparation, PCC paving, HMA paving, parking lot lighting and surface restoration.
| 01/24/2023 08:01 PM UTC |
|
CP898870-Southeast Recreation Complex-Pavilion
The project consists of, but is not limited to, constructing a pavilion style shelter at the Southeast Recreation Complex. The pavilion will consist of a metal roof, concrete slab, metal columns, power, and data.
| 12/20/2022 08:01 PM UTC |
|
CP1001237-Forestry Greenhouse-Demolition
The project consists of, but is not limited to, demolition of the remaining Greenhouse structure and selected site facilities. Final site to be restored including grading and seeding. The abatement of all asbestos containing pipe-fitting insulation, glazing/glazing compound, transite wall paneling, and all associated sealants will be complete prior to building demolition.
| 12/20/2022 08:01 PM UTC |
|
CP941036-Agronomy Hall-Common Area Improvements
The project consists of, but is not limited to, remodeling three primary corridor spaces. Improvements include removing and replacing old ceiling systems with new lay-in and decorative ceilings, new lighting, new paint finishes on walls and any exposed ceiling, and new floor base. The common student hub area will be updated to receive new carpet and a coffee bar. A new rated glass door will be installed to improve visibility and to better welcome students into the space.
| 12/15/2022 08:01 PM UTC |
|
CP905958-Cyclone Sports Complex-Soccer Field-Replacement
The project consists of, but is not limited to, demolition and disposal of the existing synthetic turf field, rock subbase and drainage system. Proposed improvements also include grading, import of proposed pea gravel, sand, subdrain system, irrigation system, PCC curb, installation of sod that is provided by owner, and miscellaneous associated work necessary to complete the project.
| 12/15/2022 08:01 PM UTC |
|
CP1006655-Science Hall-AHU 3-Replacement
The project consists of, but is not limited to, the removal and replacement of Air Handling Unit 3 in Room 0074A of Science Hall. This work includes minor demolition of a masonry wall for a new door opening, demolition of existing piping, and demolition of existing ductwork associated with the demolition of the existing Air Handling Unit 3. Work also includes installing a new door and frame, insulating an existing wall, and installing a new air handling unit, ductwork, controls and associated piping with the installation of the unit.
| 12/08/2022 08:01 PM UTC |
|
CP002538-Friley Residence Hall-Roof Replacement-Dock Roof
The project consists of, but is not limited to, metal coping, roof hatch, roof membrane, and roof insulation replacement at the Friley Hall dock roof.
| 12/08/2022 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.