General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1303338-Howe Hall-Room 1200 Remodel
****THIS BID HAS BEEN CANCELLED**** This project will remodel room 1200 in Howe Hall. Work includes, but is not limited to: demolition of existing cubicles; construction of two offices and a front reception space; associated mechanical and electrical improvements; painting; carpeting; and lighting.
04/02/2026 07:01 PM UTC
CP1300765-Town Engineering Building-Rooms 142, 148 and 156 Remodel
This project includes interior renovations to two existing lab spaces (Rooms 142 and 148) and one storage room (Room 156) at the west end of Town Engineering along the existing loading dock, totaling 3,000 square feet. The existing labs will be renovated to better support existing space uses and the existing storage room will be renovated into a cleaning and storage space. Demolition work includes but is not limited to; demolition of two existing concrete masonry walls, concrete slab, casework, and exterior access doors. New work includes but is not limited to: exterior wall patching and finishes. Mechanical scope includes but is not limited to: demolition of existing gas lines, new dust collection system, and replacement of existing grilles and diffusers. Electrical scope includes but is not limited to: renovations to power and lighting systems.
04/07/2026 07:01 PM UTC
CP1295340-Institutional Roads 2026-Pavement Preservation
Planned work includes, but is not limited to, asphalt and concrete improvements on various Institutional Roads segments across campus.
04/14/2026 07:01 PM UTC
CP1248808-Lake LaVerne-Improvements
The project consists of, but is not limited to, dewatering, excavation and disposal of lakebed sediment from Lake LaVerne as well as pavement removal, regrading of the lakebed, reshaping the lake edge, bank stabilization, placement of limestone outcropping and fieldstone along the lake edge, cut limestone walls, extending lake overflow channel, PCC sidewalks, railing replacement, site lighting, and seeding.
04/16/2026 07:01 PM UTC
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1 This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
04/21/2026 07:01 PM UTC
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
04/23/2026 07:01 PM UTC
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
04/28/2026 07:01 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
CP1006645-Science Hall-AHU 2-Replacement
The project consists of, but is not limited to, the replacement of AHU 2, in Room 061, minor demolition of existing plaster bulkheads, repair and replacement of existing acoustical tile ceilings, in corridors C0101, C0155, C0255, and C0355 and electrical work associated with AHU 2 and ceilings in corridors C0101, C0155, C0255, and C0355.
12/01/2022 08:01 PM UTC
CP002641-Agronomy Hall-Masonry Repairs-Phase 1
The project consists of, but is not limited to, tuckpointing of exterior masonry, re-caulking of control joints and around windows, cleaning of exterior masonry and windows, and replacement of a metal frame skylight window system.
12/01/2022 08:01 PM UTC
CP1000419-Physics Hall-Accessibility Improvements 2022
The project consists of, but is not limited to, modifications to the interior and exterior accessible ramps at the lower level of Physics Hall to provide compliant access into and throughout the lower level. The project also includes replacement of various sections of guardrail, handrail, and doors along the accessible routes undergoing modifications.
11/10/2022 08:01 PM UTC
CP988030-ROTC Obstacle Course
The project consists of, but is not limited to, site grading, obstacle course equipment and footings, mulch, drainage, fencing, finish grading and topsoil.
11/03/2022 07:01 PM UTC
CP987945-Veterinary Medicine-Core Lab-Remodel
The project consists of, but is not limited to, the remodeling of existing laboratory and office space, into a Core Laboratory. This project includes minor demolition, new walls, new doors, finishes and equipment to create the new Core laboratory.
10/27/2022 07:01 PM UTC
CP002724-Friley Residence Hall-Bathroom Improvements-Stack G
The project consists of, but is not limited to, remodel of bathrooms in Stack G. The bathrooms will be converted from mass, shared bathrooms to private, accessible units. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
10/18/2022 07:01 PM UTC
CP1001298-Helser Residence Hall-Laundry Improvements
The project consists of, but is not limited to, remodel of an existing first floor bathroom into new resident laundry area. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
10/04/2022 07:01 PM UTC
CO002724-Friley Residence Hall-Bathroom Improvements-Stack H
The project consists of, but is not limited to, remodel of bathrooms in Stack H. The bathrooms will be converted from mass, shared bathrooms to private, accessible units. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
09/13/2022 07:01 PM UTC
CP002619-Therkildsen Industrial Engineering Building-Parking Lot 1 Expansion
This project will construct an addition to Parking Lot 1, west of Friley Hall and south of Martin Residence Hall and realign Sheldon Avenue Extension, west of Town Engineering and Lot 10. The project consists of, but is not limited to, pavement removal, grading, storm drainage, underground and surface detention, PCC paving, communication utilities and lighting.
09/08/2022 07:01 PM UTC
CP002623-Curtiss Hall-Exterior Masonry Repair
The project consists of, but is not limited to, stone repair, stone mortar repointing, joint sealant replacement and masonry cleaning.
08/30/2022 07:01 PM UTC
151 - 160 of 395 Solicitations
1 2 12 13 14 16 18 19 20 39 40