General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
06/26/2025 07:01 PM UTC
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
07/01/2025 07:01 PM UTC
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP940361-Johnny Majors Practice Field-Turf Improvements
This project will prepare the northern portion of Johnny Majors Practice Field for a synthetic turf surface to be installed by others. The project consists of, but is not limited to, subdrain, granular subbase, nailer board, laser grading, electrical improvements and associated site upgrades adjacent to the practice field.
03/22/2022 07:01 PM UTC
CP921822-Utilities-Square Lid Vault Top-Replacements
The project consists of, but is not limited to, the replacement of eight (8) existing underground electrical and telecom vault top concrete slabs that have square manhole lids, with new concrete slabs with ISU standard round manhole lids. This project will involve excavating around the central campus electrical/telecom vaults, sidewalk removal and replacement, re-grading around vaults, concrete removal, and new cast-in-place concrete and rebar work.
03/03/2022 08:01 PM UTC
CP923004-Utilities-Pearson Substation-13.8kV Feeder Cable Replacement
The project consists of, but is not limited to, removal and replacement of 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations in above ground switchgear. Perform hi-pot cable tests on installed cable, splices, and terminations.
02/24/2022 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 4
The project consists of, but is not limited to, the replacement of two each 4160-volt Metal clad switchgears, installation of new medium voltage cables, expansion of an existing SCADA control system, installation of 480-volt panels, 120/208-volt panels, 125-volt DC Panels, transfer switches, 480:120/208-volt transformers and associated 600-volt class cables within the Iowa State University Power Plant. Additional work includes the demolition of 2 existing 4160-volt Metal clad switchgears, one 4160-volt metal enclosed switchgear, one 4160-volt Motor Control Center, one 480-volt Motor Control Center and multiple 480-volt and less power panels and associated equipment, raceways and cables. Architectural/Structural work includes, but is not limited to, the construction of two rooms, demolition of two rooms and the infill of a large opening on the first floor of the Power Plant. Mechanical work includes, but is not limited to, the relocation and installation of steam, condensate, chilled water, domestic water, fire protection, and demineralizer piping systems, relocation of steam supplied unit heaters, the replacement of one roof top HVAC unit and the installation of two new air handling units. All work will occur and be scheduled while keeping the Power Plant fully operational.
02/08/2022 08:01 PM UTC
CP002761-Veterinary Medicine-Room 1330-Remodel
This project will remodel an underutilized existing storage space into a kenneling room. This project includes, but is not limited to, reconfiguration of the room layout, finish updates, modification of mechanical equipment, piping, and ductwork, new light fixtures, receptacles, and fire alarm devices.
02/03/2022 08:01 PM UTC
CP002663-Farm House Lane-Reconstruction
The project consists of, but is not limited to, reconstruction and widening of Farm House Lane from Parking Lot 49 to Troxel Hall, storm sewer, lighting, bike parking and concrete sidewalks.
02/03/2022 08:01 PM UTC
CP002742-Parking Lots B1 and F-Resurfacing and Expansion
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement, structural demolition, new asphalt and concrete pavement with concrete curb and gutter, concrete sidewalks, storm sewer structures, piping and subsurface detention, parking lot lighting, pavement markings, concrete retaining wall, compactor enclosure and finish grading/topsoil.
02/01/2022 08:01 PM UTC
CP002736-Utilities-Applied Science Complex-Deaerator Installation
The project consists of, but is not limited to, removal of existing condensate tank, feed pumps, concrete bases and miscellaneous equipment, valves, piping, wiring, and conduit. Also includes installation of a new Owner-furnished deaerator tank and pump units, piping, and electrical work.
02/01/2022 08:01 PM UTC
CP907055-Durham Center-Clean Agent Fire Suppression System-Improvements
The project consists of, but is not limited to, installation of new clean agent fire suppression system to serve data center space. Project also includes limited modifications to double-interlock pre-action system serving space, installation of combination fire/smoke dampers in ductwork serving space, limited architectural modifications, etc. All work associated with fire alarm systems shall be included as part of Bid Alternate #2 or Bid Alternate #3. Refer to Bid Alternate descriptions and documents for additional information.
01/27/2022 08:01 PM UTC
CP002741-Parking Lot G7-RV Parking Construction
The project consists of, but is not limited to, removal of existing site features, erosion control, storm sewer and subdrain, new PCC and recycled asphalt pavement, lighting, RV power hookups, irrigation, electrical systems and equipment enclosure, finish grading/topsoil and sod.
01/25/2022 08:01 PM UTC
151 - 160 of 367 Solicitations
1 2 12 13 14 16 18 19 20 36 37