Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
| 06/26/2025 07:01 PM UTC |
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
| 07/01/2025 07:01 PM UTC |
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
| 07/08/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP002741-Parking Lot G7-RV Parking Construction-Worle Creek Bridge
The project consists of, but is not limited to, removal of existing trees, erosion control, PCC sidewalks, lighting, pre-engineered steel truss recreational trail bridge, stream channel modifications, and finish grading.
| 01/25/2022 08:01 PM UTC |
CP002724-Friley Residence Hall-Bathroom Improvements-Phase 1
The project consists of, but is not limited to, remodel of bathrooms in stacks G and H. The bathrooms will be converted to private, accessible spaces. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
| 01/20/2022 08:01 PM UTC |
CP002490-Poultry Farm-Teaching and Research Facilities-Turkey Facility-Phase 2
The project consists of, but is not limited to, materials and labor to build-out a 3920 square foot work area. This area has all of the under floor utilities installed, has a concrete floor, is in an insulated building enclosure, has drywall ceiling and perimeter walls. The ceiling and walls are not taped or finished. The project shall include constructing interior walls, electrical, mechanical, and plumbing.
| 01/13/2022 08:01 PM UTC |
CP002589-Union Drive Community Center-Union Drive Marketplace-Renovation-Venues and Seating
The project consists of, but is not limited to, renovation of interior finishes and equipment in seating area and three foodservice venues in the Union Drive Community Center. Upgrades include polishing of existing concrete flooring, wall and ceiling finishes, replacement of existing doors, new cooking and foodservice equipment, plumbing improvements, electrical power improvements, and installation of new lighting.
| 01/06/2022 08:01 PM UTC |
CP913244-Institutional Roads 2022-Pavement Preservation-Union Drive
The project consists of, but is not limited to, removal and replacement of concrete pavement, concrete sidewalks, reconstruction of storm sewer structure, new and relocated roadway and sidewalk lighting, pavement markings and finish grading.
| 12/16/2021 08:01 PM UTC |
CP002650-Carver Hall-Room 0101-Renovation
The project consists of, but is not limited to, removal and replacement of flooring and seating, painting, lighting, acoustical wall panel installation, handrails and minor electrical work.
| 12/14/2021 08:01 PM UTC |
CP002669-College of Design-Room 0101-Renovation
The project consists of, but is not limited to, demolition of framed walls and concrete risers; construction of new pipe enclosure walls; removal and replacement of flooring, seating, and rubber stair tread/risers; painting; drop ceiling tile replacement; and minor electrical work.
| 12/09/2021 08:01 PM UTC |
CP002747-Memorial Union-Soults Family Visitor Center-Remodel
This project will expand and remodel the existing Soults Family Visitor Center to improve the campus visitor experience. The project consists of, but is not limited to, expanded office spaces; updated finishes; new technology, equipment, and furniture; and restroom modernization.
| 11/18/2021 08:01 PM UTC |
CP002720-College of Design-Window Replacement
The project consists of, but is not limited to, cleaning the existing exterior concrete building surface, removing and replacing existing sealant joints at exterior concrete walls, removing and replacing existing ribbon window units, and replacing identified damaged interior wall assembly and finishes.
| 10/28/2021 07:01 PM UTC |
CP002756-Student Services Building-Common Area Improvements
This project will improve the overall first impressions and circulation of the Student Services building common areas. This project includes, but is not limited to, space reconfiguration, updating finishes, new furniture, and new technology.
| 10/26/2021 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.