General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana Project No. 2024-746 Capital Project No. 3502 Kirby and Hodges Street Sidewalk Repairs The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
07/01/2025 07:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Capital Project Number CP3367
City of Lake Charles Wastewater Treatment Plant A Basin A-08 Rehabilitation Capital Project Number CP3367 I. Scope of Services: The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. A. The Work includes, but is not necessarily limited to, the following: A. Base Bid: a. There is approximately 12,197 LF of 8-inch and 930 LF of 12-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, open cut replacement, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 229 active sewer service laterals. B. Alternate No. 1: a. There is approximately 1,916 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 33 active sewer service laterals. C. Alternate No. 2: a. There is approximately 2,105 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 38 active sewer service laterals. D. Alternate No. 3: a. There is approximately 2,695 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 49 active sewer service laterals.
07/19/2022 07:45 PM UTC
Capital Project Number CP3251
City of Lake Charles, Louisiana University Area Red Sub Basin Sewer Rehabilitation Capital Project Number CP3251 I. Scope of Services A. The University area is one of the oldest areas in the City of Lake Charles. Wastewater flow studies have indicated excessive inflow and infiltration during rain events, causing peak flows up to 14 times the average daily wastewater rate. B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed. C. This scope of work covers the repair of the collection system in the University – Red Sub-Basin Sewer Rehabilitation Project. The Work includes, but is not necessarily limited to, the following: a. Base Bid: i. There is approximately 8,418 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, open cut replacement, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 145 active sewer service laterals. b. Alternate No. 1: i. There is approximately 1,605 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 33 active sewer service laterals. c. Alternate No. 2: i. There is approximately 1,246 LF of 8-inch gravity sewer pipeline to be rehabilitated as part of this project. Rehabilitation methods include point repairs, pipe bursting, installation of new manholes, and manhole lining. Also included within this contract is the reinstating of approximately 12 active sewer service laterals.
07/19/2022 07:45 PM UTC
CP 3424
City of Lake Charles, Louisiana Water Billing Department Build Out at Transit Facility CP 3424 Interior buildout at existing tenant space. Work includes, wall framing, sheetrock, electrical, and window installation.
07/19/2022 07:45 PM UTC
CAPITAL PROJECT NO. HL-24, 25A, 29E, 29G, 29H, 32, 33, 81A, 81.D.1, 81M, 126E, 126C, 126D, 126J, 126K, 126F
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANTS MISCELLANEOUS BUILDING REPAIRS CAPITAL PROJECT NO. HL-24, 25A, 29E, 29G, 29H, 32, 33, 81A, 81.D.1, 81M, 126E, 126C, 126D, 126J, 126K, 126F I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred minimal to severe damages to multiple buildings located at Wastewater Treatment Plants A, B/C, and D. This project will serve to provide necessary repairs to reinstate building functionality to pre-storm conditions. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards. II. Scope of Services: Design and implementation of building repairs, in response to damages incurred as a result of Hurricane Laura (DR-4559-LA), to pre-storm conditions and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: Wastewater Treatment Plant A (128 W. Railroad Ave., Lake Charles, LA 70601) • Office/Administration/Blower Pump Room Building (Insurance SOV No. 081A) • Storage Building No.1 (Insurance SOV NO. 081.D.1) • Sludge Processing Building (Insurance SOV No. 081M) Wastewater Treatment Plant B/C (1132 W. 18th St., Lake Charles, LA 70601) • Equipment Building (Insurance SOV No. 024) • Portable Building (Insurance SOV NO. 25A) • RAS/WAS Pump Station (Insurance SOV No. 029E) • Motor Control Center No. 1 Building (Insurance SOV No. 029G) • Motor Control Center No. 2 Building (Insurance SOV No. 029H) • Electrical Storage Building (Insurance SOV No. 32) • Portable Building (Insurance SOV No. 33) Wastewater Treatment Plant D (3820 Tank Farm Rd., Lake Charles, LA 70601) • Press Building (Insurance SOV No. 126C) • Tertiary Filter Building (Insurance SOV No. 126D) • Maintenance Building (Insurance SOV No. 126E) • Control Room Building (Insurance SOV No. 126F) • MCC Building (Insurance SOV No. 126J) • MCC Building (Insurance SOV No. 126K) Design services shall be as per the City of Lake Charles A&E Manual.
07/19/2022 07:45 PM UTC
CAPITAL PROJECT NO. HL-83, HL-85, HL-86A, HL-86B, HL-88, HL-96, HL-101, HL-103, HL-110, HL-116
CITY OF LAKE CHARLES, LOUISIANA WATER TREATMENT PLANTS MISCELLANEOUS BUILDING REPAIRS CAPITAL PROJECT NO. HL-83, HL-85, HL-86A, HL-86B, HL-88, HL-96, HL-101, HL-103, HL-110, HL-116 I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred minimal to severe damages to multiple buildings located at the Southwest, George H. West, Center East, Center West, Chennault, and McNeese Water Treatment Plants. This project will serve to provide necessary repairs to reinstate building functionality to pre-storm conditions. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards. II. Scope of Services: Design and implementation of building repairs, in response to damages incurred as a result of Hurricane Laura (DR-4559-LA), to pre-storm conditions and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: Southwest Water Treatment Plant (4300 Alma Lane) • Pump/Administration Building (Insurance SOV No. 116) George H. West Water Treatment Plant (225 N. Ryan Street) • Distribution/Linemen Building (Insurance SOV No. 083) • Pump/Administration Building (Insurance SOV No. 085) • Chlorine Building (Insurance SOV No. 086A) • Chlorine Building (Insurance SOV No. 086B) • Utility Building (Insurance SOV No. 088) Center East Water Treatment Plant (3207 Center Street) • Main Building (Insurance SOV No. 101) Center West Water Treatment Plant (3208 Center Street) • Pump Building (Insurance SOV No. 103) Chennault Water Treatment Plant (1501 W. Main Street) • Chlorine Building (Insurance SOV No. 096) McNeese Water Treatment Plant (617 E. McNeese Street) • Pump Building (Insurance SOV No. 110) Design services shall be as per the City of Lake Charles A&E Manual.
07/19/2022 07:45 PM UTC
HL-53
City of Lake Charles, Louisiana City Hall Interior and Exterior Repairs #HL-53 Interior finish renovations, exterior waterproofing program, and an interior buildout renovation at first floor
07/19/2022 07:45 PM UTC
HL-11
City of Lake Charles, Louisiana O D Johnson Fencing and Lighting Repairs HL-11 Remove existing sports field lighting and poles and install new sports field lighting and poles. New poles and lights to match existing damaged system that will be removed. Remove existing damaged fencing, backstops and foul poles and install new. Alternate 1 to provide new metal poles for sports field lighting to withstand current local code minimum wind conditions and provide new lighting to meet current ANSI/IES RP-6-20 minimum light levels for baseball/softball fields.
07/05/2022 07:45 PM UTC
HL-53
City of Lake Charles, Louisiana City Hall Interior and Exterior Repairs #HL-53 Interior finish renovations, exterior waterproofing program, and an interior buildout renovation at first floor
07/05/2022 07:45 PM UTC
Project No. 2021-712 Capital Project No. 3395
Project No. 2021-712 Capital Project No. 3395 2021 Wastewater Pipe Bursting City of Lake Charles, LA The general scope of work for Project 2021-712 Wastewater Pipe Bursting is to make improvements to the existing gravity sewer system as listed below. • Pipe burst approximately 4791linear feet of either 8 inch or 10 Inch sewer main. • Construct point repairs as needed. • Apply protective lining in approximately 19 existing manholes. • Clean and video inspect (no rehabilitation) approximately 3600 linear feet of existing sewer main.
06/14/2022 07:45 PM UTC
Project No. CP3403
City of Lake Charles, Louisiana Riverridge Drive Drainage Improvements CP3403 The project scope of work consists of improvements to drainage infrastructure along Riverridge Drive. The project limits extend 2,817 linear feet from Lisle Peters Road to the dead end of Riverridge Drive. Improvements shall include the removal and replacement of existing storm drain pipe and catch basins in various locations. Additional improvements such as regrading of existing roadside ditches, installation of drainage swales and removal/replacement of existing walks and drives associated with storm drain infrastructure improvements shall be conducted.
06/14/2022 07:45 PM UTC
91 - 100 of 378 Solicitations
1 2 6 7 8 10 12 13 14 37 38