General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana Project No. 2024-746 Capital Project No. 3502 Kirby and Hodges Street Sidewalk Repairs The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
07/01/2025 07:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Project No. 2016-662, Capital Project No. 2944
Project No. 2016-662 Capital Project No. 2944 New Water Well G-14 at George West Water Plant To Replace Water Well G-12 City of Lake Charles, LA ~ The general scope of work consists of the drilling, sampling, constructing, development, and testing of one (1) municipal deep water well, identified as Water Well G-14, including a permanent vertical turbine pump with concrete pedestal, discharge piping, and electrical power, all as shown on the plans, complete and ready to use.
07/18/2017 07:45 PM UTC
Capital Project No. CP9778
Capital Project No. CP9778 Civic Center Elevator Equipment Replacement City of Lake Charles, LA ~ SCOPE OVERVIEW This Project (Base Bid) will refurbish and modernize one (1) service elevator designated as Elevator #2 (Base Bid) as stated in technical specifications. (Alternate-1)- The passenger elevator designated as Elevator #3 will require refurbishment/replacement (only) of interior of cab finish hardware as specified in technical specifications. (Alternate-2)- The passenger elevator designated as Elevator #1 to be refurbish and modernized as stated in technical specifications. All existing elevators are located in main thru corridor of Civic Center accessible from main front bldg. entrance or main rear entrance at east and west side of the Civic Center Bldg respectively. Contractor shall provide all qualified labor, equipment, materials, and supervision necessary to complete all tasks required that will achieve a completed functional system as related to all pertinent equipment affected by this job.
06/06/2017 07:45 PM UTC
Project No. 2016-654, Capital Project No. 3254
Project No. 2016-654 Capital Project No. 3254 Division Street Storm Drain Pipe Bursting Bilbo Street to Lakeshore Drive City of Lake Charles, LA ~ The general scope of work includes rehabilitation of approximately 900 feet of 24 inch vitrified clay drainage pipe on Division Street from Lakeshore Drive, East to Bilbo Street by pipe bursting. Existing taps shall be re-routed to gutter line or sewer main (as required). Scope also includes all incidental excavation, backfill, catch basin tie-ins, and pavement work as required.
06/06/2017 07:45 PM UTC
Project No. 2016-660, Capital Project No. 2894
Project No. 2016-660 Capital Project No. 2894 Sewer Pipe Bursting Hodges Street from Rory Street to 17th Street and between Cactus Street and Sage Street From 1st Avenue to Legendre Street City of Lake Charles, LA The general scope of work for Project No. 2016-660 includes the rehabilitation of existing sewer mains by pipe bursting and the installation of interior liners for existing brick or concrete sewer manholes.
06/06/2017 07:45 PM UTC
Capital Project No. CP3241, LEI Project No. 16-003
City of Lake Charles, Louisiana 2016 Asphalt Overlays City of Lake Charles Capital Project No. CP3241 LEI Project No. 16-003 ~ The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, adjusting storm drain catch basins to grade, cold planing asphaltic pavement, lime treatment, in-place cement stabilized base course, asphaltic concrete surface course, pavement markings, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, and hydro-seeding for the following streets at various locations in the City of Lake Charles: Paved Streets 1. Heyd Avenue (Sale Road to Dead End) 2. Michael Lane (Heyd Avenue to Dead End) 3. Akron Street (Heyd Avenue to Dead End) 4. Paris Street (Entire Length) 5. Mobile Street (Heyd Avenue to Dead End) 6. Guatemala Street (Entire Length) 7. Evangeline Street (Mobile Street to Guatemala Street) 8. Malcolm Street (Fruge Street to Dead End) 9. Channel Street (Simmons Street to Sally Mae Street) 10. Hagan Street (Highway 171 to Dead End) 11. Street Removed from Project 12. Marine Street (Shellbeach Drive to Sallier Street) 13. Locke Lane (Henderson Bayou Road to Cyprien Lane) Aggregate Streets 101. 1700 Broadmor Alley (Between 9th Street and 10th Street) 102. 1800 Block Alley (Between 10th Street and 11th Street) 103. 2600 Block Behind Pappy’s 104. 800 Block West Lagrange (Dead End off Lake Street) 105. 100 Block Bilbo Street 106. 2000 Block Pear Lane 107. 800 Block Dragon Circle 108. 1800 Block Golf Street 109. 900 Block Avenue L 110. Ace Alley (Between 1st Avenue and Lyons Street) 111. Alley Between Mill Street and Pine Street 112. 400 Block 1st Avenue 113. Rory Street 114. M. H. Jessen Alley (Between Common Street and Hodges Street) 115. Rosetta Street Alley (Between California Street and Rosetta Street) 116. 717 Cusic Street 117. 100 Block Central Parkway 118. Evans Street Alley 119. 2600 Block Doolan Lane 120. Burgoyne Drive 121. Fitzenreiter Road (Park Entrance) 122. Railroad Avenue (Wastewater Plant Entrance)
06/06/2017 07:45 PM UTC
Capital Project No. CP3051, LEI Project No. 16-017
City of Lake Charles, Louisiana 2016 – 2017 City Wide Striping Project City of Lake Charles Capital Project No. CP3051 LEI Project No. 16-017 ~ The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. 18th Street (Lake Street to Highway 14) 2. 5th Avenue (McNeese Street to 12th Street) 3. 7th Street (Ryan Street to 1st Avenue) 4. Bilbo Street (Kirby Street to Church Street) 5. Enterprise Blvd. (Azalea Street to Broad Street) 6. Foster Street (Dr. Michael DeBakey Drive to Shell Beach Drive) 7. Gayle Street (Common Street to Kirkman Street) 8. Hodges Street (Alamo Street to 7th Street) 9. LaGrange Street (Lake Street to Common Street) 10. Lakeshore Drive (South of Clarence Street to Mill Street) 11. Louisiana Avenue (McNeese Street to Azalea Street) 12. McNeese Street (Nelson Road to Ryan Street) 13. Power Center Parkway (Highway 14 to East 3,100 ft. to asphalt) 14. Sale Road (Lake Street to Common Street) 15. Walters Street (Kirkman Street to Louisiana Avenue) 16. Weaver Road (Sale Road to south 300 ft. to asphalt) 17. Kirby Street (Lakeshore Drive to Gill Street) 18. Amoco Road (Power Center Parkway to Dillard Loop) 19. Canal Street (McNeese Street to North 1,200 ft. to asphalt) 20. Benoit Lane (Sale Road to Jennifer Street) 21. Jennifer Street (Benoit Lane to Eileen Street) 22. Eileen Street (Jennifer Street to McNeese Street) 23. Simmons Street (Opelousas Street to Fitzenreiter Road) 24. Sale Road (W. Prien Lake Road to Holly Hill Road) 25. Kirkman Street (West Prien Lake Road to Church Street) 26. Pujo Street (Bilbo Street to Kirkman Street) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
06/06/2017 07:45 PM UTC
Project No. 2017-663, Capital Project No. 2894
Project No. 2017-663 Capital Project No. 2894 24" CIPP Lining Madeline Street between Common Street and Swanee Street City of Lake Charles, LA ~ The general scope of work for Project No. 2017-663, Capital Project No. 2894, includes the rehabilitation of approximately 1780 feet of 24 inch sewer main by cured-in-place (CIPP) lining on Madeline Street from Common Street East to Swanee Street. A system for bypass pumping to manage sewage flow must be furnished and maintained. Brick and concrete manholes shall also receive interior liners.
05/16/2017 07:45 PM UTC
Capital Project No. CP3234
Capital Project No. CP3234 North Grace Street Drainage Improvements Highway Street to Medora Street City of Lake Charles, LA ~ The City of Lake Charles desires to improve the drainage conditions to portions of North Grace Street, Highway Street, and Guinn Street in North Lake Charles. As a means to improve the drainage in this area a closed drainage network will be constructed on the west side of North Grace Street from Highway Street to the outfall at Medora Street. Construction of the new closed drainage network will consists of the following:  Removal and replacement of driveway pavement  Removal of existing drainage conduit which are undersized and not at the appropriate depth  Installation of (15-inch thru 36-inch) Reinforced Concrete Pipe and Corrugated Plastic Pipe in the locations where the existing open ditch exists on the west side of N. Grace St. between Highway St. and Medora Street.  Installation of Concrete catch basins and closure of existing ditches on the west side of N. Grace St. between Highway St. and Medora Street.  Asphalt Pavement removal and patching where cross drains are installed at Highway St. and N. Grace St.
05/16/2017 07:45 PM UTC
Project No. CP3211
WWTP B/C New Admin & Lab Project No. CP3211 City of Lake Charles, LA ~ The Work includes construction of a new administration facility, lab and control room. Construction will consist of load-bearing wood studs and pre-fabricated wood roof trusses with plywood sheathing and standing seam metal roof. Exterior walls of face brick veneer and fiber-cement board siding. Interior construction will be wood stud walls, gypsum board sheathing, insulation, hollow metal and aluminum storefront exterior doors and frames, laminate interior doors, hollow metal frames, LVT, porcelain tile, & carpet flooring, FRP wall panels, lighting, power, HVAC, plumbing and additional mechanical work. The site of the new building is to be stripped of debris & existing material to an elevation of 8.50+/- & filled with structural borrow fill compacted per technical specifications. Site work will consist of concrete parking areas, sidewalks and ADA parking as required.
04/04/2017 07:45 PM UTC
Project No. CP3205
Capital Project No. CP3025 Additions & Renovations to Veteran's Memorial Park Phase II City of Lake Charles, LA ~ The Work includes construction of concrete foundations, metal silhouette panels, lighting, brick pavers, pole lighting, landscaping, lighted bollards & site furnishings.
04/04/2017 07:45 PM UTC
281 - 290 of 378 Solicitations
1 2 25 26 27 29 31 32 33 37 38