City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana
Project No. 2024-746
Capital Project No. 3502
Kirby and Hodges Street Sidewalk Repairs
The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
| 07/01/2025 07:45 PM UTC |
Number | Deadline |
---|---|
Project No. 2016-662, Capital Project No. 2944
Project No. 2016-662
Capital Project No. 2944
New Water Well G-14 at George West Water Plant
To Replace Water Well G-12
City of Lake Charles, LA ~
The general scope of work consists of the drilling, sampling, constructing, development, and testing of one (1) municipal deep water well, identified as Water Well G-14, including a permanent vertical turbine pump with concrete pedestal, discharge piping, and electrical power, all as shown on the plans, complete and ready to use.
| 07/18/2017 07:45 PM UTC |
Capital Project No. CP9778
Capital Project No. CP9778
Civic Center Elevator Equipment Replacement
City of Lake Charles, LA ~
SCOPE OVERVIEW
This Project (Base Bid) will refurbish and modernize one (1) service elevator designated as Elevator #2 (Base Bid) as stated in technical specifications. (Alternate-1)- The passenger elevator designated as Elevator #3 will require refurbishment/replacement (only) of interior of cab finish hardware as specified in technical specifications. (Alternate-2)- The passenger elevator designated as Elevator #1 to be refurbish and modernized as stated in technical specifications. All existing elevators are located in main thru corridor of Civic Center accessible from main front bldg. entrance or main rear entrance at east and west side of the Civic Center Bldg respectively.
Contractor shall provide all qualified labor, equipment, materials, and supervision necessary to complete all tasks required that will achieve a completed functional system as related to all pertinent equipment affected by this job.
| 06/06/2017 07:45 PM UTC |
Project No. 2016-654, Capital Project No. 3254
Project No. 2016-654
Capital Project No. 3254
Division Street Storm Drain Pipe Bursting
Bilbo Street to Lakeshore Drive
City of Lake Charles, LA ~
The general scope of work includes rehabilitation of approximately 900 feet of 24 inch vitrified clay drainage pipe on Division Street from Lakeshore Drive, East to Bilbo Street by pipe bursting. Existing taps shall be re-routed to gutter line or sewer main (as required). Scope also includes all incidental excavation, backfill, catch basin tie-ins, and pavement work as required.
| 06/06/2017 07:45 PM UTC |
Project No. 2016-660, Capital Project No. 2894
Project No. 2016-660
Capital Project No. 2894
Sewer Pipe Bursting
Hodges Street from Rory Street to 17th Street
and between Cactus Street and Sage Street
From 1st Avenue to Legendre Street
City of Lake Charles, LA
The general scope of work for Project No. 2016-660 includes the rehabilitation of existing sewer mains by pipe bursting and the installation of interior liners for existing brick or concrete sewer manholes.
| 06/06/2017 07:45 PM UTC |
Capital Project No. CP3241, LEI Project No. 16-003
City of Lake Charles, Louisiana
2016 Asphalt Overlays
City of Lake Charles Capital Project No. CP3241
LEI Project No. 16-003 ~
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, adjusting storm drain catch basins to grade, cold planing asphaltic pavement, lime treatment, in-place cement stabilized base course, asphaltic concrete surface course, pavement markings, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, and hydro-seeding for the following streets at various locations in the City of Lake Charles:
Paved Streets
1. Heyd Avenue (Sale Road to Dead End)
2. Michael Lane (Heyd Avenue to Dead End)
3. Akron Street (Heyd Avenue to Dead End)
4. Paris Street (Entire Length)
5. Mobile Street (Heyd Avenue to Dead End)
6. Guatemala Street (Entire Length)
7. Evangeline Street (Mobile Street to Guatemala Street)
8. Malcolm Street (Fruge Street to Dead End)
9. Channel Street (Simmons Street to Sally Mae Street)
10. Hagan Street (Highway 171 to Dead End)
11. Street Removed from Project
12. Marine Street (Shellbeach Drive to Sallier Street)
13. Locke Lane (Henderson Bayou Road to Cyprien Lane)
Aggregate Streets
101. 1700 Broadmor Alley (Between 9th Street and 10th Street)
102. 1800 Block Alley (Between 10th Street and 11th Street)
103. 2600 Block Behind Pappy’s
104. 800 Block West Lagrange (Dead End off Lake Street)
105. 100 Block Bilbo Street
106. 2000 Block Pear Lane
107. 800 Block Dragon Circle
108. 1800 Block Golf Street
109. 900 Block Avenue L
110. Ace Alley (Between 1st Avenue and Lyons Street)
111. Alley Between Mill Street and Pine Street
112. 400 Block 1st Avenue
113. Rory Street
114. M. H. Jessen Alley (Between Common Street and Hodges Street)
115. Rosetta Street Alley (Between California Street and Rosetta Street)
116. 717 Cusic Street
117. 100 Block Central Parkway
118. Evans Street Alley
119. 2600 Block Doolan Lane
120. Burgoyne Drive
121. Fitzenreiter Road (Park Entrance)
122. Railroad Avenue (Wastewater Plant Entrance)
| 06/06/2017 07:45 PM UTC |
Capital Project No. CP3051, LEI Project No. 16-017
City of Lake Charles, Louisiana
2016 – 2017 City Wide Striping Project
City of Lake Charles Capital Project No. CP3051
LEI Project No. 16-017 ~
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. 18th Street (Lake Street to Highway 14)
2. 5th Avenue (McNeese Street to 12th Street)
3. 7th Street (Ryan Street to 1st Avenue)
4. Bilbo Street (Kirby Street to Church Street)
5. Enterprise Blvd. (Azalea Street to Broad Street)
6. Foster Street (Dr. Michael DeBakey Drive to Shell Beach Drive)
7. Gayle Street (Common Street to Kirkman Street)
8. Hodges Street (Alamo Street to 7th Street)
9. LaGrange Street (Lake Street to Common Street)
10. Lakeshore Drive (South of Clarence Street to Mill Street)
11. Louisiana Avenue (McNeese Street to Azalea Street)
12. McNeese Street (Nelson Road to Ryan Street)
13. Power Center Parkway (Highway 14 to East 3,100 ft. to asphalt)
14. Sale Road (Lake Street to Common Street)
15. Walters Street (Kirkman Street to Louisiana Avenue)
16. Weaver Road (Sale Road to south 300 ft. to asphalt)
17. Kirby Street (Lakeshore Drive to Gill Street)
18. Amoco Road (Power Center Parkway to Dillard Loop)
19. Canal Street (McNeese Street to North 1,200 ft. to asphalt)
20. Benoit Lane (Sale Road to Jennifer Street)
21. Jennifer Street (Benoit Lane to Eileen Street)
22. Eileen Street (Jennifer Street to McNeese Street)
23. Simmons Street (Opelousas Street to Fitzenreiter Road)
24. Sale Road (W. Prien Lake Road to Holly Hill Road)
25. Kirkman Street (West Prien Lake Road to Church Street)
26. Pujo Street (Bilbo Street to Kirkman Street)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 06/06/2017 07:45 PM UTC |
Project No. 2017-663, Capital Project No. 2894
Project No. 2017-663
Capital Project No. 2894
24" CIPP Lining Madeline Street between Common Street and Swanee Street
City of Lake Charles, LA ~
The general scope of work for Project No. 2017-663, Capital Project No. 2894, includes the rehabilitation of approximately 1780 feet of 24 inch sewer main by cured-in-place (CIPP) lining on Madeline Street from Common Street East to Swanee Street. A system for bypass pumping to manage sewage flow must be furnished and maintained. Brick and concrete manholes shall also receive interior liners.
| 05/16/2017 07:45 PM UTC |
Capital Project No. CP3234
Capital Project No. CP3234
North Grace Street Drainage Improvements
Highway Street to Medora Street
City of Lake Charles, LA ~
The City of Lake Charles desires to improve the drainage conditions to portions of North
Grace Street, Highway Street, and Guinn Street in North Lake Charles. As a means to
improve the drainage in this area a closed drainage network will be constructed on the
west side of North Grace Street from Highway Street to the outfall at Medora Street.
Construction of the new closed drainage network will consists of the following:
Removal and replacement of driveway pavement
Removal of existing drainage conduit which are undersized and not at the
appropriate depth
Installation of (15-inch thru 36-inch) Reinforced Concrete Pipe and Corrugated
Plastic Pipe in the locations where the existing open ditch exists on the west side
of N. Grace St. between Highway St. and Medora Street.
Installation of Concrete catch basins and closure of existing ditches on the west
side of N. Grace St. between Highway St. and Medora Street.
Asphalt Pavement removal and patching where cross drains are installed at
Highway St. and N. Grace St.
| 05/16/2017 07:45 PM UTC |
Project No. CP3211
WWTP B/C New Admin & Lab
Project No. CP3211
City of Lake Charles, LA ~
The Work includes construction of a new administration facility, lab and control room. Construction will consist of load-bearing wood studs and pre-fabricated wood roof trusses with plywood sheathing and standing seam metal roof. Exterior walls of face brick veneer and fiber-cement board siding. Interior construction will be wood stud walls, gypsum board sheathing, insulation, hollow metal and aluminum storefront exterior doors and frames, laminate interior doors, hollow metal frames, LVT, porcelain tile, & carpet flooring, FRP wall panels, lighting, power, HVAC, plumbing and additional mechanical work. The site of the new building is to be stripped of debris & existing material to an elevation of 8.50+/- & filled with structural borrow fill compacted per technical specifications. Site work will consist of concrete parking areas, sidewalks and ADA parking as required.
| 04/04/2017 07:45 PM UTC |
Project No. CP3205
Capital Project No. CP3025
Additions & Renovations to Veteran's Memorial Park
Phase II
City of Lake Charles, LA ~
The Work includes construction of concrete foundations, metal silhouette panels, lighting, brick pavers, pole lighting, landscaping, lighted bollards & site furnishings.
| 04/04/2017 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.