Capital Project No. CP3051
City of Lake Charles, Louisiana 2025 Citywide Striping Package Lake Charles, Louisiana City of Lake Charles Capital Project No. CP3051 LEI Project No. 26-006 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. Southpark Road (McNeese Street to Smith Road) 2. 6th Avenue (12th Street to Broad Street) 3. Hodges Street (Alamo Street to Belden Street) 4. Bilbo Street (S. Railroad Avenue to Clarence Street) 5. Lake Street (Shell Beach Drive to Prien Lake Road) 6. Opelousas Street (Enterprise Boulevard to Highway 171) 7. Fitzenreiter Road (Riverside Park to Highway 171) 8. North Goos Boulevard (Knapp Street to Opelousas Street) 9. Medora Street (Simmons Street to Highway 171) 10. Shattuck Street (Broad Street to Moeling Street) 11. 18th Street (Lake Street to Ryan Street) 12. Enterprise Parkway (Interstate 10 to Katherine Street) 13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road) 14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road) 15. Enterprise Boulevard (12th Street to Prien Lake Road) 16. Broad Street (Lakeshore Drive to Enterprise Boulevard) 17. Moeling Street (Enterprise Boulevard to Highway 171) 18. 6th Street (4th Avenue to Highway 14) 19. Mill Street (Lakeshore Drive to Highway 14) 20. Common Street (McNeese Street to Prien Lake Road) 21. Lake Street (Prien Lake Road to McNeese Street) 22. Kirkman Street (Jackson Street to McNeese Street) 23. Alamo Street (Ryan Street to Enterprise Boulevard) 24. Oak Park Boulevard (Enterprise Boulevard to Highway 14) 25. 12th Street (Highway 14 to Hodges Street) 26. Sallier Street (Lake Street to Hodges Street) 27. Ernest Street (Sale Road to Sallier Street) 28. Jefferson Drive (University Drive to University Drive) 29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road) 30. General Doolittle Avenue (Highway 14 to General Twining Street) 31. Alvin Street (Sallier Street to Shell Beach Drive) 32. 18th Street (Enterprise Boulevard to Highway 14) 33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive) 34. Russell Street (12th Street to Hillcrest Drive) 35. Hillcrest Drive (Highway 14 to Russell Street) 36. N. Prater Street (Knapp Street to Fitzenreiter Road) 37. Pear Street (Knapp Street to Fitzenreiter Road) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
11/17/2026 08:45 PM UTC
2027-04
Maintenance of City of Lake Charles Customer-Owned Lighting
11/17/2026 08:45 PM UTC
Capital Project Number CP3453
CITY OF LAKE CHARLES, LOUISIANA HAZARD MITIGATION GRANT PROGRAM (HMGP) LIFT STATION BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3453 HMGP PROJECT NUMBER DR-4559-0043 I. Scope of Services: Contractor shall complete Work as specified and indicated in the Contract Documents for Lift Station Back-Up Power Improvements (Capital Project No. CP3453). This Work includes, but is not limited to, the following: • Install of Automatic Transfer Switches & Stand-By Diesel Generators at Lift Stations. • Miscellaneous Work including civil, mechanical, structural, & electrical components required to fully execute the Work.
11/17/2026 08:45 PM UTC
Capital Project No. 3508
City of Lake Charles, Louisiana Project No. 2024-745 Capital Project No. 3508 Riverside Park Shoreline Protection – Phase One The general scope of work for this project includes the restoration and protection of approximately 250 linear feet of shoreline near the entrance of Riverside Park. This restorative work includes placement of stone revetment to rebuild the riverbank, repair/replacement of existing decorative black fence compromised from erosion, and installation of approximately 100 linear feet of steel sheet pile for bank protection near the gate entrance.
11/17/2026 08:45 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Project No. 2018-679 (OP0403)
City of Lake Charles, Louisiana Project No. 2018-679 (OP0403) Fire Station No. 7 Building Repairs The scope of work includes the installation of “push piers” under grade beams for foundation stabilization, replacement of the front porch and front sidewalk to establish positive drainage, cleaning and repairs to the exterior CMU and brick wall surfaces, roof flashing repairs, waterproofing with caulking around wall penetrations and water repellent on wall surfaces, and repainting of door frames, doors, and damaged areas of the interior of the truck bay walls.
09/18/2018 07:45 PM UTC
Capital Project Number CP3234
CITY OF LAKE CHARLES, LOUISIANA HIGHWAY STREET AND NORTH GRACE STREET DRAINAGE IMPROVEMENTS – PHASE II CAPITAL PROJECT NUMBER CP3234 The City of Lake Charles desires to improve the drainage conditions to portions of N. Grace St. and Highway St. sub basing as funds permit: 1. Highway Street - North Side (Martin Luther King Hwy. to N. Grace Street) a. Removing existing culverts for existing driveway crossings and installing a new closed drainage system. 2. N. Grace Street – East Side (Hwy St. to Guinn Street) a. Removing existing culverts for existing driveway crossings and installing a new closed drainage system.
09/18/2018 07:45 PM UTC
Capital Project Number CP3301
CITY OF LAKE CHARLES, LOUISIANA DOME LIFT STATION REHABILITATION CAPITAL PROJECT NUMBER CP3301 ~ The Dome Lift Station Rehabilitation Scope of Work includes, but is not necessarily limited to, the following: • Furnishing, installation, maintenance, and operation of a temporary bypass sewer pumping system inclusive of traffic controls. • Removal of existing pumps, valves, and electrical components for salvage by the City of Lake Charles Wastewater Division. • Demolition of structural, mechanical, and electrical portions of the existing Dome Lift Station as noted on the project drawings. • Cleaning of the interior of the remaining RCP wet well. • Construction of new reinforced concrete top slab for wet well inclusive of furnishing and installing aluminum access hatchway and fall through protection system. • Furnishing and installation of interior liner and coating system for inside of wet well and underside of top slab. • Furnishing and installation of mechanical systems including all duplex submersible pumps, guiderails, piping, valves, fittings, and specialties. • Furnishing and installation of specified components necessary for the installation a new electrical service separate from the existing electrical service from the Lake Charles Housing Authority office building. • Furnishing and installation of new electrical switchgear, controls panels, conduit and wiring, SCADA system, and other electrical components necessary for proper operation of the pump stations as shown on the drawings and as specified. • Furnishing of all site civil work including excavation, trenching, backfill, new aggregate surfaces, chain link fencing and gates, etc. as shown on the drawings and as specified.
09/04/2018 07:45 PM UTC
Capital Project Number CP3128
City of Lake Charles, Louisiana WWTP B/C Expansion and Rehabilitation Project Phase II Demolition Capital Project Number CP3128 I. Scope of Services: A. A new WWTP B/C facility is currently operational for The City of Lake Charles. Decommissioning of the existing WWTP B/C has been divided into two phases. B. This scope of work covers Phase II of the demolition. The Work includes, but is not necessarily limited to, the following: 1. Removal and disposal of mechanical and electrical equipment and demolition of existing tankage at existing WWTPs B and C. 2. Installation of a sludge return pump and skid mounted gravity belt thickening system. 3. Installation of a pre-engineered aluminum canopy. 4. Removal and disposal of existing motor control center and installation of new motor control center. 5. Miscellaneous civil/site improvements.
08/14/2018 07:45 PM UTC
Capital Project Number CP3305
CITY OF LAKE CHARLES, LOUISIANA GEORGE H. WEST WATER TREATMENT PLANT PRESSURE FILTER SYSTEM REHABILITATION AND IMPROVEMENTS CAPITAL PROJECT NUMBER CP3305 I. Scope of Services: The City of Lake Charles desires to rehabilitate the six (6) existing horizontal pressure filters at the George H. West Water Treatment Plant. This Work will include but is not limited to the following: 1. Complete Removal and Replacement of Filter Internals within all (6) Filters: a. Remove 30” of Manganese Anthrasand and Replace with 20” of Manganese GreensandPlus and 10” of Anthracite. b. Removal and Replacement of Existing Gravel Bed. c. Replacement of Existing PVC Components with Stainless Steel. d. Installation of Gravel Retaining Screen. e. Modify Existing Underdrain Strainers to Accommodate Sandvalves. f. Conditioning of Filter Media and Disinfection of the Filter Vessels. 2. Modify Air Scour Header to force Draindown. 3. Replacement of Filter Control Panel for additional Control. 4. Removal and Replacement of Existing Air Blower for Air Scour. 5. Modifications to Existing Backwash Pumps and associated Piping. 6. Installation of Slow Fill Line with Modulating Control Valve for Backwash. 7. Replacement of Existing Backwash Pump Controls with VFDs and New Backwash Control Panel. 8. Removal and Replacement of Existing Backwash Flow Meter. 9. Modification of Backwash Line Discharge into Recovery Basin. 10. Coating and Rehabilitation of Fluoride Secondary Containment Vessel. 11. Complete Touch-Ups as Required for Damaged Coating on Filter Vessels. 12. Installation of In-Line Static Mixer on Raw Water Influent Line.
07/17/2018 07:45 PM UTC
Project No. 2016-661 Capital Project No. 3224
Project No. 2016-661 Capital Project No. 3224 Muirfield and Turnberry Drainage Outfall Improvements Across the Lake Charles Country Club City of Lake Charles, LA ~ The general scope of work for Project No. 2016-661 includes installation of new drainage inlets and pipe, including the associated driveway and pavement work.
06/19/2018 07:45 PM UTC
Project No. 2018-677 Capital Project No. 3207
City of Lake Charles, Louisiana Project No. 2018-677 Capital Project No. 3207 Enterprise Blvd. Paving and Drainage Rehabilitation Phase 1 (Re-Bid) The general scope of work for Project No. 2018-677 includes rehabilitation of portions of the existing drainage system on Enterprise Boulevard, including removal and replacement of pipe, pipe bursting, and catch basin construction between 12th Street and Broad Street in the City of Lake Charles, Louisiana.
06/05/2018 07:45 PM UTC
Project No. 2018-676 Capital Project No. 3093
City of Lake Charles, Louisiana Project No. 2018-676 Capital Project No. 3093 Alma Lane Drainage Improvements The general scope of work for Project No. 2018-676 includes improvements to roadside ditches, including reinforced concrete pipe and catch basin installation.
06/05/2018 07:45 PM UTC
Capital Project Number CP3253
City of Lake Charles, Louisiana West McNeese Street Drainage and Sidewalk Improvements – Barbe High School Property to Nelson Road – Capital Project Number CP3253 Substantial Completion – 150 Calendar Days I. Scope of Services: The City of Lake Charles desires to install closed drainage and a sidewalk along the north side of W. McNeese Street. The scope of work to complete these improvements will include, but is not limited to the following: 1. W. McNeese Street (End of Barbe HS Property to Nelson Road) a. Remove the existing drainage and install new, closed drainage to promote positive drainage within the area. b. Install a curb and gutter section along the existing edge of road. c. Install a sidewalk along the north side of the road to assist with pedestrian and school traffic.
04/17/2018 07:45 PM UTC
Project No. 2018-674 Capital Project No. 3131
Project No. 2018-674 Capital Project No. 3131 Lake Street Reconstruction From Westmoreland Street South to Waverly Street City of Lake Charles, LA ~ The general scope of work for Project No. 2018-674, Lake Street Extension from Westmoreland Street South to Waverly Street, includes the following: 1. Paving: Construct a new 10 inch thick, 48 to 54 foot wide reinforced concrete pavement with integral curb and 8” compacted stone base. New six foot (6’) wide plain concrete sidewalk on the east side of the street will be constructed. Approximate project length is about 550 linear feet. 2. Water: Replace the existing 8 inch PVC water line crossing Lake Street at Wedgewood with a new 8 inch DR-11 HDPE water pipe via directional drill, including valves, fittings, and fire hydrant. The existing 8 inch PVC water line will be abandoned in place or removed as required. 3. Drainage: Install new underground drainage system.