CP 3492
City of Lake Charles, Louisiana
Mallard Golf Driving Range
CP 3492
1. Four covered hitting bays totaling 1,333 SF with integrated hitting surfaces, rough ins for ball tracing technology by owner, integrated hitting surfaces, dining area behind each station, heating, and architecture matching the existing clubhouse.
2. Bar area totaling 1,178 SF with fold-up doors on all sides, serving bar, and seating area, architecture consistent with existing clubhouse.
3. Paved hitting area at the driving range with 5’ x 5’ hitting mats.
4. Two additional charging stations at existing cart facility serving 12 golf carts and a paved night hitting area with durable hitting mats.
| 09/15/2026 07:45 PM UTC |
|
CP 3537
City of Lake Charles, Louisiana
Goosport Recreation Splash Pad
CP 3537
Remove the existing splash pad and build a new splash pad and putting green and other work as noted in the project plans and project manual.
| 09/15/2026 07:45 PM UTC |
|
Capital Project No. CP3051
City of Lake Charles, Louisiana
2025 Citywide Striping Package
Lake Charles, Louisiana
City of Lake Charles Capital Project No. CP3051
LEI Project No. 26-006
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. Southpark Road (McNeese Street to Smith Road)
2. 6th Avenue (12th Street to Broad Street)
3. Hodges Street (Alamo Street to Belden Street)
4. Bilbo Street (S. Railroad Avenue to Clarence Street)
5. Lake Street (Shell Beach Drive to Prien Lake Road)
6. Opelousas Street (Enterprise Boulevard to Highway 171)
7. Fitzenreiter Road (Riverside Park to Highway 171)
8. North Goos Boulevard (Knapp Street to Opelousas Street)
9. Medora Street (Simmons Street to Highway 171)
10. Shattuck Street (Broad Street to Moeling Street)
11. 18th Street (Lake Street to Ryan Street)
12. Enterprise Parkway (Interstate 10 to Katherine Street)
13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road)
14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road)
15. Enterprise Boulevard (12th Street to Prien Lake Road)
16. Broad Street (Lakeshore Drive to Enterprise Boulevard)
17. Moeling Street (Enterprise Boulevard to Highway 171)
18. 6th Street (4th Avenue to Highway 14)
19. Mill Street (Lakeshore Drive to Highway 14)
20. Common Street (McNeese Street to Prien Lake Road)
21. Lake Street (Prien Lake Road to McNeese Street)
22. Kirkman Street (Jackson Street to McNeese Street)
23. Alamo Street (Ryan Street to Enterprise Boulevard)
24. Oak Park Boulevard (Enterprise Boulevard to Highway 14)
25. 12th Street (Highway 14 to Hodges Street)
26. Sallier Street (Lake Street to Hodges Street)
27. Ernest Street (Sale Road to Sallier Street)
28. Jefferson Drive (University Drive to University Drive)
29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road)
30. General Doolittle Avenue (Highway 14 to General Twining Street)
31. Alvin Street (Sallier Street to Shell Beach Drive)
32. 18th Street (Enterprise Boulevard to Highway 14)
33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive)
34. Russell Street (12th Street to Hillcrest Drive)
35. Hillcrest Drive (Highway 14 to Russell Street)
36. N. Prater Street (Knapp Street to Fitzenreiter Road)
37. Pear Street (Knapp Street to Fitzenreiter Road)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 09/15/2026 07:45 PM UTC |
| Number | Deadline |
|---|---|
|
Project No. CP3264
Capital Project No. CP3264
INTERSATE CORRIDOR BEAUTIFICATION PHASE 1
City of Lake Charles, LA ~
NORTH I-10 EXIT RAMP 30 B AND SERVICE ROAD- LaDOTD PERMIT 153562
SOUTH I-10 SERVICE ROAD LaDOTD PERMIT 153565
COVE LANE AND ROUNDABOUT- LaDOTD PERMIT 153586
SCOPE OF WORK
The general scope of work for Project Interstate Corridor Beautification Phase I, Capital Project No. 3264, includes the following.
North I-10 Exit Ramp 30 B and Service Road - Installation of trees, palms, and shrubs.
South I-10 Service Road - Installation of trees, palms, and shrubs.
Cove Lane and Roundabout - installation of trees, palms, shrubs, and installation within the roundabout borrow fill material, concrete curbing, aluminum edging, and decorative stone with binding solution.
| 10/17/2017 07:45 PM UTC |
|
Capital Project Number CP3260
Capital Project Number CP3260
WWTP "D" Emergency Generator Replacement Project
City of Lake Charles, LA ~
I. Scope of Services:
A. The City of Lake Charles desires to replace the existing inoperable on-site generator utilizing GOHSEP Hazard Mitigation Grant Program funding:
1. WWTP “D” Emergency Generator Replacement Project
a. Remove and dispose of existing inoperable generator
b. Install new 1600 KW emergency generator
| 08/15/2017 07:45 PM UTC |
|
Project No. 2016-657, Capital Project No. 3131
Project No. 2016-657
Capital Project No. 3131
Lake Street Reconstruction From McNeese Street South Approximately 1000 Feet
City of Lake Charles, LA ~
The general scope of work for Project No. 2016-657, Lake Street Reconstruction from McNeese Street South Approximately 1000 feet, includes the following:
1. Paving: Construct a new 10” thick, 48 to 60-foot wide reinforced concrete pavement with integral curb and 8” compacted stone base. New 6-foot wide plain concrete sidewalk on the East side of the street will be constructed. Approximate project length is about 1000 linear feet.
2. Water: Replace the existing 12” water line with new 12” DR-18 AWWA C900 PVC water pipe including valves and fire hydrants as required. Tie into the existing water line at McNeese Street and at W. Contour Street. Tie the new 12” water line to meters with new service lines. The existing 12” water line to be abandoned is to be grouted in place or removed.
3. Drainage: Install new underground drainage system that will connect to the 72" drainage line beneath McNeese Street. The existing drainage system on Lake Street will be removed and replaced with the new upgraded system.
4. Traffic: Upgrade traffic signal and striping at intersection of Lake and McNeese Street.
| 08/15/2017 07:45 PM UTC |
|
Project #CP3170
1155 Ryan Street 2nd Floor Buildouts
Project #CP3170
City of Lake Charles, LA ~
Generalized scope of work consists of the complete buildout of the 2nd floor in the Transit Building.
| 08/01/2017 07:45 PM UTC |
|
Capital Project Number OP 0600
Center West Water Treatment Plant
500,000 Gallon Elevated Water Storage Tank Rehabilitation
Capital Project Number OP 0600
City of Lake Charles, LA ~
I. Scope of Services:
A. The City of Lake Charles Water Division currently owns and operates the 500,000 Gallon Elevated Storage Tank at the Center West Water Treatment Plant.
Rehabilitation of the existing tank in general includes:
a. Drainage improvements around the tank
b. Erection and maintenance of a temporary containment system to contain sand blasting and paint debris from falling on adjacent properties and vehicles.
c. Light sand blasting of the tank exterior and appurtenances and applying a three coat exterior coating system to the entire tank exterior.
d. Sandblasting interior tank walls and appurtenances and applying 3 coat interior coating system to these surfaces.
e. Perform the necessary adjustments to windages/sway rods to return the tank to its original erect, design conformance.
f. Furnish and install repairs and improvements to the interior roof, vent, roof ladder, etc.
g. Furnish and install new catwalk improvements, ladder gate, fall protection signs, safety handrails, confined space signs, primary shell manway, bowl ladder, fall protection device, brass lock, overflow pipe and roof vent
screening, etc.
h. Bring the storage tank and its safety components into compliance with current AWWA/OSHA/NFPA safety requirements by the completing the addition or
replacement of all non‐compliant items noted from the tank inspection.
| 08/01/2017 07:45 PM UTC |
|
Project No. 2017-664, Capital Project No. 3272
Project No. 2017-664
Capital Project No. 3272
Sunset Lift Station Rehabilitation
City of Lake Charles, LA ~
This work includes rehabilitation of a sewer lift station complete with all piping, electrical, pumps, valves, valve box, SCADAPack, ultrasonic level control, fence, removal of the existing pumps, piping, electrical, excavating, backfilling, etc., and any other items necessary to provide a complete system which functions properly to the satisfaction of the Engineer and Wastewater Department.
| 08/01/2017 07:45 PM UTC |
|
Project No. 2017-665, Capital Project No. 3072
Project No. 2017-665
Capital Project No. 3072
Fitzenreiter Road Park Entrance Road Drainage Improvements
City of Lake Charles, LA ~
The general scope of work for Project No. 2017-665 includes installation of drainage pipe and catch basins for roadside drainage improvements, and side slope protection.
| 07/18/2017 07:45 PM UTC |
|
Project No. 2016-662, Capital Project No. 2944
Project No. 2016-662
Capital Project No. 2944
New Water Well G-14 at George West Water Plant
To Replace Water Well G-12
City of Lake Charles, LA ~
The general scope of work consists of the drilling, sampling, constructing, development, and testing of one (1) municipal deep water well, identified as Water Well G-14, including a permanent vertical turbine pump with concrete pedestal, discharge piping, and electrical power, all as shown on the plans, complete and ready to use.
| 07/18/2017 07:45 PM UTC |
|
Capital Project No. CP9778
Capital Project No. CP9778
Civic Center Elevator Equipment Replacement
City of Lake Charles, LA ~
SCOPE OVERVIEW
This Project (Base Bid) will refurbish and modernize one (1) service elevator designated as Elevator #2 (Base Bid) as stated in technical specifications. (Alternate-1)- The passenger elevator designated as Elevator #3 will require refurbishment/replacement (only) of interior of cab finish hardware as specified in technical specifications. (Alternate-2)- The passenger elevator designated as Elevator #1 to be refurbish and modernized as stated in technical specifications. All existing elevators are located in main thru corridor of Civic Center accessible from main front bldg. entrance or main rear entrance at east and west side of the Civic Center Bldg respectively.
Contractor shall provide all qualified labor, equipment, materials, and supervision necessary to complete all tasks required that will achieve a completed functional system as related to all pertinent equipment affected by this job.
| 06/06/2017 07:45 PM UTC |
|
Project No. 2016-654, Capital Project No. 3254
Project No. 2016-654
Capital Project No. 3254
Division Street Storm Drain Pipe Bursting
Bilbo Street to Lakeshore Drive
City of Lake Charles, LA ~
The general scope of work includes rehabilitation of approximately 900 feet of 24 inch vitrified clay drainage pipe on Division Street from Lakeshore Drive, East to Bilbo Street by pipe bursting. Existing taps shall be re-routed to gutter line or sewer main (as required). Scope also includes all incidental excavation, backfill, catch basin tie-ins, and pavement work as required.
| 06/06/2017 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.