General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Capital Project Number CP3414
CITY OF LAKE CHARLES, LOUISIANA SOUTHWEST WATER TREATMENT PLANT BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3414 HMGP GRANT NO. DR-4559-43 I. Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for the Southwest Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following: • Removal and Replacement of the Existing Stand-By Generator with Two (2) Parallel 600kW Stand-By Diesel Generators complete with 2,500A, 480VAC, 3PH Paralleling Switchgear. • Removal and Disposal of the Existing Manual Transfer Switch and Replacement with 2,500A, 480VAC Delayed Transition Automatic Transfer Switch. • Installation of Low Voltage Panelboard for Supply to Generator Appurtenances. • Interconnections to Owner’s SCADA for Generator Monitoring. • Miscellaneous Civil and Electrical Work as Required to Complete the Work.
11/18/2025 08:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Capital Project No. CP3249
WWTP A 36-INCH TRUNK LINE REHABILITATION PROJECT CAPITAL PROJECT NO. CP3249 City of Lake Charles, LA ~ A. Approximately 1,200 linear feet of the 36-inch trunk line from the south end of N. Bilbo St. to the head of WWTP A is severely corroded and in need of repair. B. This scope of work covers the rehabilitation of the 36-inch trunk line. The Work includes, but is not necessarily limited to, the following: 1. Rehabilitation of 930 LF of 36-inch pipe using cured in place lining method. 2. Dig and replace 267 LF of 36-inch pipe. 3. Coating of three 6-ft diameter manholes and one junction box.
12/06/2016 08:45 PM UTC
Project No. 2016-653
Project No. 2016-653 24” Sewer Main Extension on LA-14 From McNeese Street North to McNeese Farm Road City of Lake Charles, LA ~ The general scope of work for Project No. 2016-653, includes the installation of a 24” sewer main extension by open cut and jack and bore, as well as precast concrete sewer manholes with interior liners.
11/15/2016 08:45 PM UTC
Project No. CP3240
Capital Project No. CP3240 3rd Avenue Sidewalk Improvements 12th Street to Broad Street City of Lake Charles, LA ~ The City of Lake Charles desires to provide new sidewalks and repair existing sidewalks on the east and west sides of 3rd Avenue, including the associated intersections for thirteen (13) consecutive blocks. Construction of new sidewalks generally consists of removal of driveway pavement, damaged or non ADA compliant sidewalk pavement, and general excavation required to construct a 5-ft wide, ADA compliant, sidewalk with handicap accessible ramps in the following locations as funds permit and not to exceed AFC of $503,000.00 - The east and west sides of 3rd Avenue from 12th Street to Broad Street.
10/04/2016 07:45 PM UTC
Project No. CP3226
Project No. CP3226 Lake Charles Civic Center Improvements - Part 3 City of Lake Charles, LA ~ A. The Work as defined in the General Conditions and described in the Contract Documents prepared by the Architect is summarized as follows: LAKE CHARLES CIVIC CENTER IMPROVEMENTS - PART 3 B. Renovations to existing second floor office space for new Meeting Rooms/Bridal Suites, and Conference Room. C. Renovations to existing Dressing Rooms at North end of Coliseum.
09/06/2016 07:45 PM UTC
Project No. CP3087
Project No. CP3087 Tuten Park Naturelab Relocation City of Lake Charles, LA ~ Exterior/Interior Materials and Systems:  The exterior facade of the building will be clad with hardie board lap siding.  All interior walls will be hardie board panel siding.  Exterior shutters will be provided at all wall openings.  The roof will be standing seam metal roof panels.  Gutters, downspouts, and splash blocks provided at each end of the buidling.  (1) exterior double aluminum door with full lite, (1) exterior single aluminum door with full lite, (1) exterior single 48" hollow metal door, (2) exterior single 36" hollow metal doors. Structural Systems:  Structural frame will be wood framing built using traditional method of wood construction.  The building will be elevated above grade at 4'-0" and resting on 8x8 wood post connected to 18" (inch) diameter concrete drill shafts.  Front and rear deck and ADA ramp will be supported on 6x6 wood post connected to 18" (inch) diameter concrete drill shafts.  Sheet metal caps placed at all exposed post tops. Electrical Systems:  Power and circuits will be supplied from the existing education building.  New lighting fixtures will be located in all areas within the building in quantities necessary to provide proper light levels.  New electrical outlets placed throughout the building as per power plan.  (4) new fans for exterior applications will be located at equal distances within the building.  New panelboard and circuits for electrical systems. Plumbing Systems:  New plumbing fixtures including sinks, lavatories, and water closets for restrooms and classroom wash areas.  New grinder pump Alternate(s):  Provide pricing for composite decking for outdoor classroom area - room 001. Refer to sheet A1.2.
08/16/2016 07:45 PM UTC
Project No. CP3244
Capital Project No. CP3244 BROADMOOR, CREOLE, STILLWOOD AND VON BLOND LIFT STATIONS REHABILITATION PROJECT City of Lake Charles, LA ~ I. Scope of Services: A. Broadmoor Lift Station 1. Replace two existing pumps with new submersible pumps on rail system 2. Replace all suction/discharge valves 3. Replace wet well access hatch 4. New hurricane fence with green slats 5. Electrical improvements. 6. Coat wet well B. Creole Lift Station 1. Demolish existing brick building 2. New top slab with new access hatches 3. New hurricane fence with green slats 4. Demolish wet well slide gate 5. Coat wet well C. Stillwood Lift Station 1. Replace two existing pumps with new submersible pumps on rail system 2. Demolish existing valve vault and replace with new valve vault with new valves and access hatch 3. Electrical improvements. 4. Coat wet well. D. Von Blond Lift Station 1. Replace two existing pumps with new submersible pumps on rail system; 2. New top slab of wet well and new access hatch 3. New valve vault with new valves and access hatch 4. New hurricane fence with green slats 5. Electrical improvements 6. Coat wet well
08/02/2016 07:45 PM UTC
Project No. CP 9778
Project No. CP 9778 Lake Charles Civic Center Boiler Equipment Replacement City of Lake Charles, LA ~ This Project will demo/remove three (3) existing hot-water boiler units and replace with three (3) new equivalent capacity hot-water boilers. The existing equipment is located inside the Boiler Equipment Room at east side of Civic Center complex at ground level. Contractor shall provide all labor, equipment, materials, and supervision necessary to complete all tasks required that will achieve a completed functional system as related to all pertinent equipment affected by this job. Note: Contractor shall submit (4) submittal copies, to Owner Engineer for review and acceptance prior to executing equipment order. Submittals shall denote all equipment to be ordered, including options as pplicable, per job specifications as stated in this section. The following scope listings are a general summary of work tasks to be executed and shall not be considered all-inclusive: Demo: 1) Contractor shall relocate existing utility lines along east wall to eliminate existing obstructions for equipment access. See project drawings. (Note: Owner to be notified as per job specifications and requirements as related to any planned utility outages that may affect building services.) 2) Contractor to remove and replace three (3) existing hot-water boiler equipment complete as per Bid drawings and specifications. Contractor shall properly decommission and dispose of all equipment/materials to be removed offsite. New Installation: 1) Contractor shall provide and install complete three (3) natural gas fired hot-water boiler equipment. Boiler equipment shall be as specified in Bid drawings and specifications. 2) Contractor shall provide and install factory provided isolation spacers as specified. The spacers shall reside directly on the existing concrete support foundations. 3) Contractor shall provide and install all ancillary piping components, i.e., valves, check valves, etc. as depicted on Bid drawings and specifications. 4) Contractor to provide boiler mfc. factory authorized personnel to properly configure new boiler equipment monitoring/control points and new computer unit to interface with existing system controls, i.e., boiler circulation pumps and building HVAC equipment in coordination with Owner Engineer. Contractor shall insure proper interface/communications are re-established between new boiler equipment and existing building controls system . General Notes: • All wiring to comply with FPA 70 - National Electrical Code (latest version recognized by AHJ) • All equipment shall be installed in strict accordance with the instructions of the manufacturer. Contractor shall provide boiler mfc. factory authorized personnel to assist contractor with any temporary disassembly/reassembly of boiler equipment during handling and installation process as necessary. • Existing panels and/or circuits will be utilized on this project. Coordinate panel and/or circuit outages for modifications and tie-ins with Owner Engineer and Building Facilities Personnel. De-energize and test to be de-energized before proceeding with work. • All conduit, ancillary piping and components, tubing, instrumentation, etc. shall be properly routed to not inhibit boiler equipment unit maintenance access panels from being easily accessible. Note: Upon completion of all tasks stated above, contractor shall perform operational "run" check to insure proper operation and functionality of all boiler equipment, etc. This will need to be coordinated with the Owner Engineer representative prior to job completion. If any other items not listed above are identified as being deficient during the course of this work, contractor shall provide an itemized list with cost estimate to repair and/or replace as necessary. All gas lines, conduits, etc. routing from air-conditioning equipment shall be properly secured and installed at an elevation to match existing wall penetrations, etc. to prevent personnel tripping hazards and/or head injuries (if applicable). Note: All framing supports, i.e., unistrut, etc. shall be (hot-dip) galvanized. Any welding, cutting, etc. performed on an y metal framing shall be coated with cold-zinc galv. paint (minimum two coats). Contractor shall adhere to all local Plumbing Codes, National Electrical Code, and all local Building Codes as they apply. Contractor shall coordinate, including providing fee payments if applicable, for AHJ inspections, etc. as applicable. All discrepancies, etc. shall be directed to the Owner Engineer during the Work Phase. Contractor shall thoroughly clean all construction debris, i.e., loose screw fasteners, crates, etc. created from the replacement of said components prior to considering and/or deeming the job complete. Five (5) HARD-BOUND sets of 0 & M manuals, eq. warranty information, component parts lists, etc. shall be submitted to Owner 's engineering representative at the completion (final walk- thru) of the job. Note: Contractor to identify all options as applicable to the installed units to be easily denoted in 0 & M manuals for future reference. Note: Any deviations from the above stated specifications shall be considered invalid unless authorized and approved by Owner Engineer.
06/14/2016 07:45 PM UTC
Project No. 2015-649
Project No. 2015-649 5th Avenue Drainage Improvements From Willowick Street South Approximately 500 Feet to L-14 of W-20 City of Lake Charles, LA ~ The general scope of work for Project No. 2015-649 includes installation of reinforced concrete pipe and catch basins for roadside drainage improvements.
06/14/2016 07:45 PM UTC
Project No. 2011-599, Bond Issue No. SW0006
Project No. 2011-599 Bond Issue No. SW0006 5th Avenue Sewer Extension and Lift Station Bancroft Street South to Contraband Bayou City of Lake Charles, LA ~ The general scope of work for Project No. 2011-599, Bond Issue No. SW0006, includes the installation of a gravity sewer system containing 8"-15" diameter pipe as well as the installation of a new sewer lift station including new force mains. The scope of work also includes the demolition and restoration of existing lift station sites serving the local apartment complexes.
05/17/2016 07:45 PM UTC
Project No. 2014-629
Project No. 2014-629 Bank Street and 7th Street Intersection City of Lake Charles, LA ~ The general scope of work includes the reconstruction of 510 linear feet of 7th Street which includes the intersection with Bank Street along with the reconstruction of sidewalks and six sets of concrete stairs as designated on the plans. There are eight sets of existing stairs; six sets will be rebuilt while two sets will be eliminated. The project also includes removal and replacement of 8 inch sanitary sewer line, 6 inch water line, and 2 inch water line, all as shown on the drawings.
05/03/2016 07:45 PM UTC
301 - 310 of 382 Solicitations
1 2 27 28 29 31 33 34 35 38 39