General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
DR002
City of Lake Charles, Louisiana Lake Charles Public Works New Facility Phase 2 DR002 Scope of Project Build a variety of new buildings on an existing partially developed site. Project to include parking, generators, underground drainage, drainage swales and detention areas, enclosed conditioned buildings, open air pavilions, vehicle canopies, a new fuel station, and other work as noted in plans and specifications.
02/16/2026 08:45 PM UTC
LCR 401
City of Lake Charles, Louisiana Lock Park Inclusive Playground LCR 401 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents for the LCR 401 Lock Park Inclusive Playground. The Work includes, but is not limited to: PROJECT SUMMARY: • The scope of work that is considered base bid includes: o Necessary earthwork, grading, tree protection, and utility adjustments to accommodate the proposed playground and parking; o Demolition of the two (2) stall concrete parking lot off 6th Street, the central pedestrian promenade connecting 6th Street to 7th Street, select removal of concrete paths to accommodate drainage and curb ramps, and the removal of select trees; o Installation of vehicular rated concrete paving for a parking lot and entry drive, custom playground components, poured-in-place safety surfacing on a gravel and concrete base, engineered wood fiber safety surfacing, two (2) pre-engineered shade structures, concrete curbs and pedestrian paths, subsurface drainage, site lighting, playground fencing, planting, and an irrigation system. • The scope of work that is considered alternates includes: o Alternate No. 1: Add vehicular rated paving and curbs east of proposed drive aisle. o Alternate No. 2: Add planting and irrigation in parking islands and in front of pavilion.
02/16/2026 08:45 PM UTC
2026-12
Millennium Park Fall Surface Replacement In accordance with the specifications, it is the intent of this formal invitation to receive bids from qualified bidders for Materials, Supplies and Labor for the removal of existing poured-in-place rubber surfacing, preparation of the underlying concrete slab, and installation of a synthetic turf playground surfacing system with an impact attenuation pad and silica sand infill for Millennium Park, located on the grounds of the Bord du Lac Park, adjacent to the Lake Charles Event Center. All work shall be performed in a clean, safe, and workmanlike manner in accordance with manufacturer specifications and ASTM standards for playground surfacing safety and accessibility.
03/03/2026 08:45 PM UTC
Project No. 2025-749 Capital Project No. 3309
PROJECT NO. 2025-749 CAPITAL PROJECT NO. 3309 HAM REID ROAD WATERLINE EXTENSION- ELLIOTT RD. TO BIG LAKE RD. CITY OF LAKE CHARLES, LA SCOPE OF WORK: The scope of work includes the installation of new 12” diameter waterline along the north side of Ham Reid Road between Elliot Road and Big Lake Highway (LA 384). The scope also includes the relocation of the existing 12” diameter water line at the intersection of La 384 and Graywood Parkway in anticipation of a new round-a-bout at this location.
03/03/2026 08:45 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Project No. CP3205
Capital Project No. CP3025 Additions & Renovations to Veteran's Memorial Park Phase II City of Lake Charles, LA ~ The Work includes construction of concrete foundations, metal silhouette panels, lighting, brick pavers, pole lighting, landscaping, lighted bollards & site furnishings.
04/04/2017 07:45 PM UTC
Project No. 2016-651 Capital Project No. 3223
Project No. 2016-651 Capital Project No. 3223 Power Centre Sewer Improvements Lift Stations and Force Mains From East Prien Lake Road South to McNeese Farm Road City of Lake Charles, LA ~ The general scope of work for Project No. 2016-651 includes the upgrades to the existing lift station on East Prien Lake Road, East of Kayouche Coulee and installation of a new sewer lift station on Power Centre Parkway including new force mains. The scope of work also includes the installation of some gravity sewer mains with manholes.
04/04/2017 07:45 PM UTC
Capital Project Number CP 3245
City of Lake Charles, Louisiana Southwest Water Treatment Plant Finished Water Storage and High Service Pump Station Expansion Capital Project Number CP 3245 I. Scope of Services: A. Expansion of the Southwest Water Treatment Plant, includes but is not limited to: 1. One (1) new 2.0 Million Gallon Type III, wire‐wrapped prestressed concrete tank. 2. One (1) new high service pump complete with motor starter and tie‐ins into the existing spares within the existing control panel. 3. One (1) new pump control valve and associated controls for the new high service pump. 4. One (1) new tank mixing system and associated air piping. 5. Interconnection site piping to and from new water storage tank. 6. A new header assembly to the high service pump station from the new and existing tank. 7. A complete recoating of the existing high service pumps, valves, header, etc from the existing ground storage tank to the termination of the discharge header within the pump and filter building. 8. Demolition of the existing facilities as indicated. 9. Miscellaneous electrical, instrumentation, civil, etc.
03/14/2017 07:45 PM UTC
Project No. 2016-659, Capital Project No. 3227
Project No. 2016-659 Capital Project No. 3227 West Prien Lake Road 12" Water Line Extension Swanson Lane East to Bertha Lane City of Lake Charles, LA ~ The general scope of work for Project No. 2016-659, West Prien Lake Road 12” Water Line Extension – Swanson Lane East to Bertha Lane, includes the installation of approximately 800 feet of 12 inch dia. water main along the North side of West Prien Lake Road.
01/17/2017 08:45 PM UTC
Project No. 2015-645, Capital Project No. 3160
Project No. 2015-645 Capital Project No. 3160 6th Avenue Reconstruction Broad Street to 3rd Street City of Lake Charles, LA ~ The general scope of work for Project No. 2015-645, Sixth Avenue Reconstruction – Broad Street to 3rd Street, includes the following: (a) Reconstruction of roadways; (b) Storm drainage improvements; (c) Water Distribution System; (d) Sewer Line (e) Sidewalks
12/06/2016 08:45 PM UTC
Capital Project No. CP3234
Capital Project No. CP3234 SALLY MAE STREET ASPHALT OVERLAY AND DRAINAGE IMPROVEMENTS GEIFFERS STREET TO CESSFORD STREET City of Lake Charles, LA ~ The City of Lake Charles desires to improve the road surface and drainage conditions to portions of Sally Mae Street. Construction of the new asphalt overlay and drainage network generally consists of removal and replacement of driveway pavement, initial asphalt patching prior to overlay, closing in of ditches, and installation of new drainage piping and catch basins in the following locations as funds permit and not to exceed AFC of $343,000: i. Sally Mae Street from Geiffers Street to Cessford Street.
12/06/2016 08:45 PM UTC
Capital Project No. CP3243
Capital Project No. CP3243 WWTP A BASIN A-12 REHABILITATION PROJECT City of Lake Charles, LA ~ A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed. C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-12. The Work includes, but is not necessarily limited to, the following: 1. Pipe bursting 10,930 linear feet of existing 6” and 8” sewer to new 8”. 2. Open cut replacement of 3,248 linear feet of existing 6” and 8” sewer to new 8”. 3. Replacement of approximately 265 active sewer service laterals. 4. Coating approximately 80 vertical feet of existing and new manholes.
12/06/2016 08:45 PM UTC
Capital Project No. CP3249
WWTP A 36-INCH TRUNK LINE REHABILITATION PROJECT CAPITAL PROJECT NO. CP3249 City of Lake Charles, LA ~ A. Approximately 1,200 linear feet of the 36-inch trunk line from the south end of N. Bilbo St. to the head of WWTP A is severely corroded and in need of repair. B. This scope of work covers the rehabilitation of the 36-inch trunk line. The Work includes, but is not necessarily limited to, the following: 1. Rehabilitation of 930 LF of 36-inch pipe using cured in place lining method. 2. Dig and replace 267 LF of 36-inch pipe. 3. Coating of three 6-ft diameter manholes and one junction box.
12/06/2016 08:45 PM UTC
Project No. 2016-653
Project No. 2016-653 24” Sewer Main Extension on LA-14 From McNeese Street North to McNeese Farm Road City of Lake Charles, LA ~ The general scope of work for Project No. 2016-653, includes the installation of a 24” sewer main extension by open cut and jack and bore, as well as precast concrete sewer manholes with interior liners.
11/15/2016 08:45 PM UTC
Project No. CP3240
Capital Project No. CP3240 3rd Avenue Sidewalk Improvements 12th Street to Broad Street City of Lake Charles, LA ~ The City of Lake Charles desires to provide new sidewalks and repair existing sidewalks on the east and west sides of 3rd Avenue, including the associated intersections for thirteen (13) consecutive blocks. Construction of new sidewalks generally consists of removal of driveway pavement, damaged or non ADA compliant sidewalk pavement, and general excavation required to construct a 5-ft wide, ADA compliant, sidewalk with handicap accessible ramps in the following locations as funds permit and not to exceed AFC of $503,000.00 - The east and west sides of 3rd Avenue from 12th Street to Broad Street.
10/04/2016 07:45 PM UTC
301 - 310 of 389 Solicitations
1 2 27 28 29 31 33 34 35 38 39