Capital Project Number CP3414
CITY OF LAKE CHARLES, LOUISIANA
SOUTHWEST WATER TREATMENT PLANT
BACK-UP POWER IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3414
HMGP GRANT NO. DR-4559-43
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for the Southwest Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following:
• Removal and Replacement of the Existing Stand-By Generator with Two (2) Parallel 600kW Stand-By Diesel Generators complete with 2,500A, 480VAC, 3PH Paralleling Switchgear.
• Removal and Disposal of the Existing Manual Transfer Switch and Replacement with 2,500A, 480VAC Delayed Transition Automatic Transfer Switch.
• Installation of Low Voltage Panelboard for Supply to Generator Appurtenances.
• Interconnections to Owner’s SCADA for Generator Monitoring.
• Miscellaneous Civil and Electrical Work as Required to Complete the Work.
| 11/18/2025 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Project No. 2017-663, Capital Project No. 2894
Project No. 2017-663
Capital Project No. 2894
24" CIPP Lining Madeline Street between Common Street and Swanee Street
City of Lake Charles, LA ~
The general scope of work for Project No. 2017-663, Capital Project No. 2894, includes the rehabilitation of approximately 1780 feet of 24 inch sewer main by cured-in-place (CIPP) lining on Madeline Street from Common Street East to Swanee Street. A system for bypass pumping to manage sewage flow must be furnished and maintained. Brick and concrete manholes shall also receive interior liners.
| 05/16/2017 07:45 PM UTC |
|
Capital Project No. CP3234
Capital Project No. CP3234
North Grace Street Drainage Improvements
Highway Street to Medora Street
City of Lake Charles, LA ~
The City of Lake Charles desires to improve the drainage conditions to portions of North
Grace Street, Highway Street, and Guinn Street in North Lake Charles. As a means to
improve the drainage in this area a closed drainage network will be constructed on the
west side of North Grace Street from Highway Street to the outfall at Medora Street.
Construction of the new closed drainage network will consists of the following:
Removal and replacement of driveway pavement
Removal of existing drainage conduit which are undersized and not at the
appropriate depth
Installation of (15-inch thru 36-inch) Reinforced Concrete Pipe and Corrugated
Plastic Pipe in the locations where the existing open ditch exists on the west side
of N. Grace St. between Highway St. and Medora Street.
Installation of Concrete catch basins and closure of existing ditches on the west
side of N. Grace St. between Highway St. and Medora Street.
Asphalt Pavement removal and patching where cross drains are installed at
Highway St. and N. Grace St.
| 05/16/2017 07:45 PM UTC |
|
Project No. CP3211
WWTP B/C New Admin & Lab
Project No. CP3211
City of Lake Charles, LA ~
The Work includes construction of a new administration facility, lab and control room. Construction will consist of load-bearing wood studs and pre-fabricated wood roof trusses with plywood sheathing and standing seam metal roof. Exterior walls of face brick veneer and fiber-cement board siding. Interior construction will be wood stud walls, gypsum board sheathing, insulation, hollow metal and aluminum storefront exterior doors and frames, laminate interior doors, hollow metal frames, LVT, porcelain tile, & carpet flooring, FRP wall panels, lighting, power, HVAC, plumbing and additional mechanical work. The site of the new building is to be stripped of debris & existing material to an elevation of 8.50+/- & filled with structural borrow fill compacted per technical specifications. Site work will consist of concrete parking areas, sidewalks and ADA parking as required.
| 04/04/2017 07:45 PM UTC |
|
Project No. CP3205
Capital Project No. CP3025
Additions & Renovations to Veteran's Memorial Park
Phase II
City of Lake Charles, LA ~
The Work includes construction of concrete foundations, metal silhouette panels, lighting, brick pavers, pole lighting, landscaping, lighted bollards & site furnishings.
| 04/04/2017 07:45 PM UTC |
|
Project No. 2016-651 Capital Project No. 3223
Project No. 2016-651
Capital Project No. 3223
Power Centre Sewer Improvements
Lift Stations and Force Mains
From East Prien Lake Road South to McNeese Farm Road
City of Lake Charles, LA ~
The general scope of work for Project No. 2016-651 includes the upgrades to the existing lift station on East Prien Lake Road, East of Kayouche Coulee and installation of a new sewer lift station on Power Centre Parkway including new force mains. The scope of work also includes the installation of some gravity sewer mains with manholes.
| 04/04/2017 07:45 PM UTC |
|
Capital Project Number CP 3245
City of Lake Charles, Louisiana
Southwest Water Treatment Plant
Finished Water Storage and High Service Pump Station Expansion
Capital Project Number CP 3245
I. Scope of Services:
A. Expansion of the Southwest Water Treatment Plant, includes but is not limited to:
1. One (1) new 2.0 Million Gallon Type III, wire‐wrapped prestressed concrete tank.
2. One (1) new high service pump complete with motor starter and tie‐ins into the
existing spares within the existing control panel.
3. One (1) new pump control valve and associated controls for the new high service
pump.
4. One (1) new tank mixing system and associated air piping.
5. Interconnection site piping to and from new water storage tank.
6. A new header assembly to the high service pump station from the new and existing
tank.
7. A complete recoating of the existing high service pumps, valves, header, etc from the
existing ground storage tank to the termination of the discharge header within the
pump and filter building.
8. Demolition of the existing facilities as indicated.
9. Miscellaneous electrical, instrumentation, civil, etc.
| 03/14/2017 07:45 PM UTC |
|
Project No. 2016-659, Capital Project No. 3227
Project No. 2016-659
Capital Project No. 3227
West Prien Lake Road 12" Water Line Extension
Swanson Lane East to Bertha Lane
City of Lake Charles, LA ~
The general scope of work for Project No. 2016-659, West Prien Lake Road 12” Water Line Extension – Swanson Lane East to Bertha Lane, includes the installation of approximately 800 feet of 12 inch dia. water main along the North side of West Prien Lake Road.
| 01/17/2017 08:45 PM UTC |
|
Project No. 2015-645, Capital Project No. 3160
Project No. 2015-645
Capital Project No. 3160
6th Avenue Reconstruction
Broad Street to 3rd Street
City of Lake Charles, LA ~
The general scope of work for Project No. 2015-645, Sixth Avenue Reconstruction – Broad Street to 3rd Street, includes the following:
(a) Reconstruction of roadways;
(b) Storm drainage improvements;
(c) Water Distribution System;
(d) Sewer Line
(e) Sidewalks
| 12/06/2016 08:45 PM UTC |
|
Capital Project No. CP3234
Capital Project No. CP3234
SALLY MAE STREET ASPHALT OVERLAY
AND DRAINAGE IMPROVEMENTS
GEIFFERS STREET TO CESSFORD STREET
City of Lake Charles, LA ~
The City of Lake Charles desires to improve the road surface and drainage conditions to portions of Sally Mae Street. Construction of the new asphalt overlay and drainage network generally consists of removal and replacement of driveway pavement, initial asphalt patching prior to overlay, closing in of ditches, and installation of new drainage piping and catch basins in the following locations as funds permit and not to exceed AFC of $343,000:
i. Sally Mae Street from Geiffers Street to Cessford Street.
| 12/06/2016 08:45 PM UTC |
|
Capital Project No. CP3243
Capital Project No. CP3243
WWTP A BASIN A-12 REHABILITATION PROJECT
City of Lake Charles, LA ~
A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system.
B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed.
C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-12. The Work includes, but is not necessarily limited to, the following:
1. Pipe bursting 10,930 linear feet of existing 6” and 8” sewer to new 8”.
2. Open cut replacement of 3,248 linear feet of existing 6” and 8” sewer to new 8”.
3. Replacement of approximately 265 active sewer service laterals.
4. Coating approximately 80 vertical feet of existing and new manholes.
| 12/06/2016 08:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.